Hastern Railway

Traction Distribution

No. ELD/200/4A Sealdah, the 22nd May, 2023

All depot ln-charges (OIIE, PSI, RC. CTPC, Cons, HRS & Veh)
Eastern Railway, Sealdah

Sub:-Minutes of Failure analys_i_a__ me?_ti_pg~ (VC.)_ _held between RB,RDSO & CEDFs___o_f
Zonal Railway on 18.5.2023 .
fxp_n~aLco,Rna..]rLvy.ayj

A Video Conference was held on 18.5.2023 to review selected TRD failures for the
month of April'2023 wherein officers from Railway Board, RDSO and Zonal Railways had participated.
Discussion on analysis of the selected TRD failures is as follows:
_ I: -_-__-_--_-- - -.---:-:---

DiscussionAlltheRAdroppershouldbeof7mm. dia size. A drive to be

1.?1~. Pantograph entangled,


with OLIE due to launched to identify the existence of 5 mm. dia RA dropper and
breakage of RA dropperonaccountofmaterialfailure immediate action to be taken for its replacement.

~~ATallihe RRA clamp locations, an additional piece of contact wire to


c`ontact-- .wire parting
IIi:II 3.
i ni`ar RRA clamp. bc provided across RRA clamp as per guide line issued on SMI NO.
'1`I/MI/0058, Rev-I.

Asset failure due to Bi- Special driviITbe launched to ensure presence of` bi-metallic
metallic action. strip/sheet wherever applicable and proper action to be taken if found
missing.
4. Failure of Tower All the scheduled maintenance of the Tower Wagon (8 wheeler & 4
Wagon. wheeler) to be completed properly. Short cut method should not be
(

£{dopted as a temporary remedial action.


III

5. I,ighting Arrester I,A disconnector juinper to be modified as per latest MI no.


jumper earthed to TI/MI/0048, Rev.02 and until the modification it is to be ensured that
Gantry channel due to existing LA disconnector jumper should not touch gantry channel in
bursting of Dis-connector. the event of jumper failure.
•-^~lfi`RD depot ln-charges to ensure availability of latest ACTM with
aT Availability of` ACTM
with all AC`S. SMI &MI. all ACS. SMI & MI.I
!!7.y

Action plan for A~lT ~~in~;-;xTsling 1-a"5-~mm2 isolator jumper to be replaced with 160
replacement of lsolator mm2 jumper within 2023-24. Concerned store department must take
Jumper ( 160 mm2). special initiative to procure 160 mm2 jumper and its associated fitting
within minimum possible time.
8.I SwiTvel clip of st;ady At all the turn out and cross over intactness of swivel clip along-with
ami failure at Cross all types of split pins & locking pins to be ensured with extra
O \,, C r .
`No OHE supply attentioll.
`Pr`oper sequence of lsolator operation to be ensured by Power block
9.
issuing and receiving authority before and after issuance OHE power

9r-
block.
r t' _

islNo. Item Discussion

lo. Pantograph Maintenance and adjustment-' of Turn out and X-over to be done
entanglement at Turnoutpoint.~0111-`:f`ailiirL`dueto properly as per SMI no. TI/MI/0028, Rev-2.

11.I Toad testing of all type of insulator to be ensured as per special


parting ol` Insulator. maintenance instruction before put into service.

Hence„]sadv]sedtoproperlyfollowthelnstruct]°nsandensurequ]Ckc°mdiife6\ap"

(Gopal Bose)
Sr. Divisional Electrical Engineer
Traction Distribution
Eastern Railway, Sealdah

C`opy to: -AEE/Tr-DINorth` South & RliA for information and necessary follow-up of compliance please.

9t#Y#5\ap}9
(Gopal Bose)
Sr. Divisional Electrical Engineer
Traction Distribution
Eastern Railway, Sealdah