Download as pdf
Download as pdf
You are on page 1of 6
aay UTTAR PRADESH POLLUTION CONTROL BOARD NZS Building. No TC-12V Vibhuti Khand, Gomti Nagar, Lucknow-226010 Phone:0522-2720828,2720831, Fax:0522-2720764, Em: fo@uppeb.com, Website: www.uppeb.com CONSENT ORDER Ref No. - Dated : 07/12/2021 140345/UPPCB/Bulandshahar(UPPCBRO)/CTO/air/BULAN' SHAHAR/2021 To, Shri NISHANK KAUSHIK M/s SHEETALA WASTE MANAGEMENT PROJECT D-26, UPSIDC Industrial Area, Sikandrabad, Distt. - Bulandshahr (U.P.), BULAND. SHAHAR,203205 BULAND SHAHAR Sul + Consent under section 21/22 of the Air (Prevention and control of Pollution) Act, 1981 (as amended) toM/s, SHEETALA WASTE MANAGEMENT PROJECT Reference Application No. 13890821 Dated : 07/12/2021 1. With reference to the application for consent for emission of air pollutants from the plant of M/s SHEETALA WASTE MANAGEMENT PROJECT. under Air Act 1981. It is being authorised for said emissions, as per the standards, in environment, by the Board as per enclosed conditions This consent is valid for the period from 01/01/2022 to 31/12/2024 . 3. Inspite of the conditions and provisions mentioned in this consent order UP Pollution Control Board reserves its right and powers to reconsider/amend any or all conditions under section 21 (6) of the Air (Previntion and Controt of Pollution) Act, 1981 as amended. This consent is being issued with the permission of competent authority For and on behalf of U.P. Pollution Control Board RAM KUMAR SINGH Bte-zivizarteaeryos30 Chief Environmental Officer, Circle-4 Enclosed : As above (condition of consent): Copy to: Regional Office, U.P. Pollution Control Board, Bulandshahr RAM KUMAR SINGH pac tnvaarteaeasso Chief Environmental Officer, Circle-4 3(a) 3(b) xe) U.P. Pollution Control Board Dated : 07/12/2021 CONDITIONS OF CONSENT This consent is valid only for the approved production capacity of Common Hazardous Waste through incineration-10 MT/day, reconditioning of discarded container and drums- 10 MT/day, Dismantling and segregation of all electrical and electronics waste- 02 MT/Day This consent is valid only for products and quantity mentioned above. Industry shall obtain prior approval before making any mo producl/ process /fuel/ plant machinery failing which consent would be deemed void. The maximum rate of emission of flue gas should not be more than the emission norms for the stacks. Air Pollution Source Details. Air Pollution Source Details S.No | AirPolution | Type ofFuel | Stack No. | Parameters | Height | Source | 1 Incinerator | Electricity/Die 1 ‘Sulphur | 30.0 Meter | (Double sel Dioxide | Chamber) 2 D.G. Set- 125] Diesel 283 Sulphur |As per norms. | KVA (2) Dioxide | 3 DG. Set-15| Diesel 4 ‘Sulphur [As per norms. | KVA, Dioxide ‘The emissions by various stacks into the environment should be as per the norms of the Board Emission Quality Details Detail | S.No Stack No Parameter Standard | | 1 1 Sulphur Dioxide Asper norms. | 2 2 Sulphur Dioxide Aspernomms. | 3 3 Sulphur Dioxide ‘As pernorms. | 4 4 Sulphur Dioxide ‘As per noms. | Quantity of other pollutants should also be as per the norms prescribed by the Board/MOEF & CC/or otherwise mandatory The equipment for air pollution control system and monitoring ,as proposed by the industry and approved by the Board should be installed in their premises itself . ‘The modification or installation in the existing pollution control equipments should be done only by prior approval of Board The operation of air pollution control system and maintenance be done in such a way that the quantity of pollutants should be in accordance with the standards prescribed by the Board/MoEF & CCior otherwise mandatory Unit should do provisions for fugitive emissions chimney/stack as per the norms of the Board/MOEF & CCior otherwise mandatory ‘The unit should submit the stack emissions monitoring report within one month from issuance of consent order along with the point wise compliance report of the consent order . Further quarterly ‘monitering report should be submitted . ‘The Unit will file the renewal application at least 2 months prior to the expiry of this Order. Specific Conditions: 1- This CTO is issued to M/s Sheetala Waste Management Project, Plot no.- D-26, UPSIDC, * Industrial area, Sikandrabad, Bulandshahr for common Hazardous Waste through incineration-10 MTday, reconditioning of discarded container and drums- 10 MT/day, Dismantling and segregation ofall electrical and electronics waste- 02 MT/Day. 2- Unit shall maintain and operate spray dryer and wet scrubber/Bag filter for Air Pollution Control as per applicable norm defined in Environment protection rule, 1986. 3. Uni shall ensure appropriate e-icuaton system with suitable collection ank for scrubbing liquic 4- Unit shall install acoustic enclosure for all D.G. sets. 5- Unit shall not use any such fuel which is ban in NCR Region. 6- Unit shall maintain the required temperature in primary and secondary chamber with allowed residence time. 7- Unit shall develop automatic feeding of waste stock in the Incinerator. 8- Unit shall maintain daily record of fuel used in the operation of Incinerator. 9- Unit shall install such a appropriate device to retain the water wrapper generating from the system before releasing the scrub gases in the stack. 10- Unit shall maintain the record of daily processed raw material and its disposal 11- Unit shall ensure appropriate Green belt in the premise to counter Act the processing smell ‘outside the premise by planting fast growing deciduous saplings. 12- Unit shall install online Air monitoring system and will get it connected with the server of CPCB and UPPCB within 03 month. 13- Unit shall comply the provision of Environment Protection Act, 1986. 14- Unit shall comply the provision of HW Rule, 2016, PWM Rule, 2016 and SW Rule, 2016. 15- Unit shall be bound to comply the order of Hon'ble Supreme Court, NGT, High Court and Order passed by CPCB w.r Air Pollution Control in NCR Region. Issued with the permission of competent authority . For and on behalf of U.P. Pollution Control Board . RAM KUMAR SINGH p2e%3sorfrtewsosso Chief Environmental Officer. Circle-4 UTTAR PRADESH POLLUTION CONTROL BOARD Building, No TC-12V Vibhuti Khand, Gomti Nagar, Lucknow-226010 Phone:0522-2720828,2720831, Pax:0522-2720764, Email: info@uppeb.com, Website: www.uppeb.com CONSENT ORDER Ref No. - Dated : 07/12/2021 140344/UPPCB/Bulandshahar(UPPCBRO)/CTO/ water/BULAND SHAHAR/2021 To, Shri NISHANK KAUSHIK ‘M/s SHEETALA WASTE MANAGEMENT PROJECT 1-26, UPSIDC Industrial Area, Sikandrabad, Dist, - Bulandshahr (U.P.), BULAND SHAHAR 203203 BULAND SHAHAR Sub: Consent under Section 25/26 of The Water (Prevention and control of Pollution) Act, 1974 {as amended) for discharge of effluent to M/s. SHEETALA WASTE MANAGEMENT PROJECT Reference Application No 13890764 Dated :07/12/2021 1. Fordisposal of effluent into water body or drain or land under The Water (Prevention and control of Pollution) Act,1974 as amended (here in after referred as the act ) M/s. SHEETALA WASTE MANAGEMENT PROJECT is hereby authorized by the board for discharge of their industrial effluent generated through ETP for irrigation/river through drain and disposal of domestic effluent through septic tant/soak pit subject to general and ‘special conditions ‘mentioned in the annexure .in refrence to their foresaid application ‘This consent is valid for the period from 01/01/2022 to 31/12/2024 In spite of the conditions and provisions mentioned in this consent order UP Pollution Control Board reserves its right and powers to teconsider/amend any or all conditions under section 27(2) of the Water (Previntion and Controt of Pollution) Act, 1974 as amended This consent is being issued with the permission of competent authority . For and on behalf of U.P. Pollution Control Board RAM KUMAR SINGH g2cmaticorhasecoae Chief Environmental Officer, Circle4+ Enclosed : As above (condition of consent): Copy to: Regional Office, U.P. Pollution Control Board, Bulandshahr igh sey AN UN RAM KUMAR SINGH si Chiet Biviroumeatal Stticer, Circle ‘Consent Order No. 13890764/ Water 1 4) 4(b). 6 U.P. POLLUTION CONTROL BOARD, LUCKNOW lexure to Consent issued to M/s SHEETALA WASTE MANAGEMENT PROJECT vide Dated : 07/12/2021 CONDITIONS OF CONSENT approved production capacity of Common Hazardous Waste through ineineration-10 MT/day, reconditioning of discarded container and drums- 10 MT/day, Dismantling and segregation of all electrical and electronics waste- 02 MT/Day The quantity of maximum daily effluent discharge should not be more than the following : This consent is valid only for the Effluent Discharge Detail ‘S.No Kind of Effulant Maximum daily | Treatment facility and dischargeKL/day | discharge point 4 Domestic Septic Tank/Soak Pit| Septic Tank 2 Industrial In to Industrial drain ETP t after treatment | Avtangement should be made for collection of water used in process. and domestic effluent <{faratcly in closed water supply system The treated domestic and industrial eMfver if discharged separa semises, if meet the end of final discharge point, arrangement should be made for Out ioe prec effluent and for collecting its sample. Except the effluent informed in the pplication for consent no other effluent should enter inthe sad arrangements for coestce of Seat it should also be ensured that domestic effluent should not be discharged in storm water drain ‘The domestic effluent should be treated in treatment plant so that the should be in conformity with the following norms dated treated effluent . Domestic Effulant _| | S.No Parameter. Standard ! 4 ‘Quantity of Discharge 4.5KLD a] “The indusirial effluent should be treated in treatment plant so that the treated effluent should be in conformity with the following norms. . E Industrial Effulant | S.No Parameter ‘Standard L 1 Quantity of Discharae 3.5KLD j L 2 Total Suspended Solids. 400 mg/L. | 3 BOD 30 mai. iat 4 coD 250 mg/L t ese Oil & Grease 410 malt. ] Effluent generated in all the processes, bleed water, cooling effluent and the effluent generated [ron ‘vashing of floor and equipments etc should be treated before its disposal with treated industria) “leant so that it should be according to the norms prescribed under The Environment (Protection) ‘Act,1986 or otherwise mandatory The other pollutant for which norms have not been prescribed, the same should not be more than the norms prescribed for the water used in manufacturing process of the industry TThe method for collecting industrial and domestic effluent and its analysis should be as per legal Injiam standards and its subsequent amendments/standards prescribed under The Environment (Protection) Act, 1986. The treated domestic and industrial efMuent be mixed (as per the provisions of Condition No. 2) and disposed of on one disposal point. This common effluent disposal point should have arrangement or low meter/V Notch for measuring effluent and its log book be maintained ‘The Unit will file the renewal application at least 2 months prior to the expiry of this Order recific Conditions: This CTO is issued to M/s Sheetala Waste Management Project, Plot no.- D-26, UPSIDC, / Industrial area, Sikandrabad, Bulandshahr for common Hazardous Waste through incineration-10 MTiday, reconditioning of discarded container and drums- 10 MT/day, Dismantling and segregation ,/ fall electrical and electronics waste: 02 MT/Day. 2. Unit shall maintain and operate ETP so ‘that the treated effluent is as per norms. 3- Unit shall reuse/reeycle treated effluent in the scrubbing/drum reconditioning system as much as possible, Rosie. develop appropriate system for rain water harvesting and ground water recharging in the premise or outside premise with proper monitoring syste, PBN call develop leak proof shaded facility for temporarily storage of such a toxic waste which xan nutibe dsposed'by the system and will be disposed through a appropriate valid agency TUM shall seek the clearaince of CGWA/SGWA for ground water extra ction and shall not be more than 10.0 KLD. sore pall strictly comply the conditions of Environmental Clearance and NOC issued by MOEF and CC, GOI and UPPCB. oe OT soll ensure appropriate re-circuation System with suitable collection tank for scrubbing liquid. 9 Unit shall maintain the record of daily processed raw material and its disposal. 10- Unit shall ensure appropriate Green belt in the premise to counter Act the processing smell outside the premise by planting fast growing deciduous saplings. 11- Unit shall comply the provision ‘of Environment Protection Act, 1986. 12- Unit shall comply the provision of HW Rule ,,2016, PWM Rule, 2016 and SW Rule, 2016. 13- Unit shall be bound to comply the order of Hi fon’ble Supreme Court, NGT, High Court and Order passed by CPCB w.r. Air Pollution Control in NCR Region. Issued with the permission of competent authority For and on behalf of U.P. Pollution Control Board . RAM KUMAR SINGH oo; terfracorsos30 Dove 200 1207 1 2692 90530 Chief Environmental Officer, Circlet

You might also like