CONTRACTOR
TOSHIBA TRANSMISSION & DISTRIBUTION SYSTEMS (INDIA) PRIVATE LIMITED
SUB-CONTRACTOR -
DATE (OF REV. A): PPRD: SP
TITLE: Rating and Diagram Plate
25-02-2021 CHKD: RJ
WARRANTY PERIOD :
N 84 MONTHS FROM THE DATE OF COMMISSIONING /
U V W 90 MONTHS FROM THE DATE OF SUPPLY
WHICHEVER IS EARLIER .
P1 P1 P1
U1S1 V1S1 W1S1
CT1 CT5 CT9
U1S2 V1S2 W1S2
U2S1 V2S1 W2S1
CT2 CT6 CT10
U2S2 V2S2 W2S2
U3S1 V3S1 W3S1
CT3 CT7 CT11
U3S2 V3S2 W3S2
U4S1 V4S1 W4S1
CT4 CT8 CT12
U4S2 V4S2 W4S2
P1
NS1
CT23
NS2
P1 P1 P1
NU1S1 NV1S1 NW1S1
CT13 CT16 CT20
NU1S2 NV1S2 NW1S2
NU2S1 NV2S1 NW2S1
NU2S2 NV2S2 NW2S2
CT14 CT17 CT21
NU2S3 NV2S3 NW2S3
NU2S4 NV2S4 NW2S4
NOTES -
NU3S1 NV3S1 NW3S1 1. TANK AND CONSERVATOR ARE SUITABLE TO
NU3S2 NV3S2 NW3S2 WITHSTAND FULL VACUUM.
CT15 CT18 CT22
NU3S3 NV3S3 NW3S3 2. REFER INSTRUCTION MANUAL BEFORE ERECTION,
NU3S4 NV3S4 NW3S4 VACUUM APPLICATION & UN-TANKING.
3. CONSERVATOR IS FITTED WITH AIR-CELL.
NV4S1
CT19
NV4S2
AIROLI, NAVI MUMBAI, INDIA