Download as pdf or txt
Download as pdf or txt
You are on page 1of 35

GameChange Solar

Bankable Quality at Value Pricing

TOGETHER,
LET’S REPOWER
THE PLANET.
Today, our planet is mostly powered by burning and
polluting. We must repower the planet with renewable
green energy.

TOGETHER,
LET’S REPOWER
THE PLANET.
At GameChange Solar, we are doing our part to
repower the planet by reducing the cost of solar
energy.

TOGETHER,
LET’S REPOWER
THE PLANET.
Together, let’s do this. The time is now.

TOGETHER,
LET’S REPOWER
THE PLANET.
How GameChange Came About
Our team leadership has invested over $480,000,000, heavily in
metal fabrication companies. This gives us a strong working
knowledge of cost effective scale metal manufacturing processes.

Our group companies built 10 solar power plants and learned the
solar business

As these plants were built, we saw that PV mounting structures were


too expensive, complicated slow to install, and needed better
integrated wire management and grounding.

GameChange Racking was started in 2012 to provide the most cost-


effective, high quality and fast-installing solar racking systems.

The company was renamed GameChange Solar in 2015 to better


message the immediate expansion into trackers and long term
expansion into storage.

We have built a superior engineering team, leveraged our legacy


skillset in solar system installation, design and metal fabrication, and
developed the best designed racking systems in the industry.

TOGETHER,
LET’S REPOWER
THE PLANET.
Bankability
GameChange Solar has industry leading quality & the backing of Barron
Group Holdings, giving us a world class level of bankability to give you
the peace of mind you need.

• Financial strength: backed by Barron Group Holdings with asset of market value in
excess of $200,000,000
• 20 year warranty
• Strict adherence to required engineering standards
• Projects utilizing GameChange Solar financed by Berkshire Hathaway, NRG, DE
Shaw, Key Bank, Citizens Energy, Solar City / Tesla, M&T Bank, Bridge Bank, US
Bancorp, Duke Energy, True Green, PJM Utility, Laurel Capital Partners, and many
others
• All systems wind tunnel tested by industry leader CPP Safety first: boundary layer wind tunnel
testing of GameChange roof & ground
• 2703 and 467 ETL/UL tested systems by industry leader CPP
• Independent assessment by industry leader Black & Veatch

Rigorous field testing of GameChange


TOGETHER, Post System Sticky-Post™

LET’S REPOWER
THE PLANET.
GameChange Unbeatable Quality Attracts World
Class EPCs, Developers, and System Owners

TOGETHER,
LET’S REPOWER
THE PLANET.
Our Mission: Change the World by Making Solar Energy Affordable
• Uncompromising, Bankable Quality Racking at Value Pricing
Over 2 GW Sold • Superior Engineering with Highest Steel Strength in the Industry

Over 4GW Manufacturing Capacity • Optimized Design with Less Parts, Less Cost, Fastest Install

Projects in
Over 35 States in the
USA plus Africa,
Canada and the
Caribbean

System installed in USA

TOGETHER,
LET’S REPOWER
THE PLANET.
Our Systems
Grid-Lite™ and Standing Seam
Roof Systems

Genius Tracker™
Single Axis Tracker System

Max-Span™
Pile Driven Systems for Poly and Thin Film

Pour-in-Place™ and Precast


Ballasted Ground Systems for Poly and Thin Film
TOGETHER,
LET’S REPOWER
THE PLANET.
MaxSpan™ Pile Driven Systems
Best Quality and Priced Pile Driven Fixed Tilt Systems
• Industry’s longest spans and fewest foundations: as few as 190 per MW

• Articulating purlin connections to navigate up to 15% terrain slopes

• Support all poly, glass and thin film modules including First Solar Series 4

• Rugged design enables 150 mph wind and 90 psf snow loads

• 20 men install 1.55MW per week

• Purlin angles auto-square tables for fast panel installation


32 MW - NC - MaxSpan™
• Turnkey install, geotech services available

• 20 year warranty

• ETL / UL 2703 tested

• Independent assessment by Black & Veatch

• Wind tunnel tested by industry leader CPP

74 MW - NC - MaxSpan™ System With First Solar Series 4 Modules

“GameChange’s innovative (post-driven) solution offered a quality


product at the best value in the market.”

TOGETHER, Chris Bullinger - CEO, Hecate Energy LLC

LET’S REPOWER
THE PLANET.
Superior Terrain Navigation Adjustability

Articulating purlins between tables enable installation on sites with complex slope issues, which when combined with post and post bracket
adjustment handle up to 15% east-west terrain slopes and undulations

Patent pending articulating purlin connection to Purlins for all MaxSpan systems have multiple mounting holes allowing 6" east-west
navigate sloping terrain adjustability

TOGETHER,
LET’S REPOWER
THE PLANET.
Self Hanging Purlin Supports Reduce Purlin Labor 50%

• Reduce labor for purlin mounting by 50%


because two men can place purlins on supports
and then one man can bolt them on

• Available Q4 2017

TOGETHER,
LET’S REPOWER
THE PLANET.
MaxSpan™ FastBuild
Industry’s Lowest Part Count of all Pile Systems
• Industry’s fastest install system due to minimal parts
• A frame has only 3 parts and assembles 50% faster than competitors
• Three axes of adjustability demanded by installers for navigating real
world site conditions where significant adjustability in the field is required
• Standard system has 3.5 inches vertical adjustability
• Post extenders allow 10 inches vertical adjustability

Nesting components eliminate brackets, have long


slots enabling 3 axes of adjustability.

Typical Part Count Comparison vs. Competitors for A Frames (Post, Brace,
Beam and Related Brackets)

TOGETHER,
LET’S REPOWER
THE PLANET.
MaxSpan™ WideFlange
Optimal System for WideFlange

• Industry’s most flexible racking system


handles undulating ground conditions
• Telescoping post bracket with over 5 inches
vertical adjustment for fast top of pile
leveling

WideFlange
v

TOGETHER,
LET’S REPOWER
THE PLANET.
MaxSpan™ Post Pile Driven Systems Across the USA
138 MW, MN – Group of 19 Systems First 85 MW, NC – Group of 7 Systems 74 MW, NC – First Solar Modules
Solar Modules

43 MW, NC – Group of 7 Systems 41 MW, NC – Group of 6 Systems 39 MW, NC – Group of 6 Systems

32 MW, NC 27 MW, NC – First Solar Modules 13 MW, SC


300 MW
Leader in Racking for First Solar Modules
Installed
• Post/Beam/Brace assembly has industry’s lowest part count and fastest assembly
• Articulating purlin connections to navigate up to 15% terrain slopes
• Supports all poly, glass and thin film modules
• Rugged design enables 150 mph wind and 60 psf snow loads
• Turnkey install, pull test and geotech services available
• Thin film panel clamps mount using rivets, T bolts or socket bolts
• 60% fewer foundations than other First Solar racking enables faster
install (300 piles per MW typically vs 500 piles for other vendors)

TOGETHER,
LET’S REPOWER
THE PLANET.
Genius Tracker™
Increases ROE up to 20% for Project Owners
INCREASES LEVERAGED ROE UP TO 20% FOR SOLAR PROJECT OWNERS
Shorter north-south rows use less space than leading competitors, extra space
used to increase row spacing which results in higher kWh production and ROE

WORLD'S FASTEST INSTALLING SINGLE AXIS SOLAR TRACKER


Pre-assembled drive system and easily assembled components combine to
make the fastest install

LEADING BANKABILITY
Black & Veatch technical assessment, CPP wind tunnel tested and rated
150mph, and ETL / UL 2703 tested

HIGHEST POWER DENSITY


Highest power density of any single axis tracker, 99.5% panel density on rows
vs. 97.0% best competitor

GREATEST RELIABILITY
Rugged design for 30 year field life in harsh environmental climate: -30/+65C
rated, actuators IP67 submersible rated motor end/ IP66 rated front end

ULTRA-EFFICIENT INSTALLATION
Every drive actuator has its own battery backup and wirelessly linked
controllers, eliminating all trenching and Tru3D-Gimbal™ bearings account for
pile installation being out of plumb, out of azimuth and out of vertical & east-
west alignment

TOGETHER,
LET’S REPOWER
THE PLANET.
v

GameChange Genius Tracker™


Increases Leveraged ROE up to 20% for Solar Project Owners
GameChange packs modules onto shorter north-south rows, using less space than leading competitors
Extra space is used to widen rows, which results in higher KWh production for GameChange for the same number of
modules on the same amount of land

GameChange Solar

Leading Centralized Tracker


v

Leading Decentralized Tracker

v
Leading Bankability, Test & Certification
• CPP wind tunnel tested and rated 150mph

• ETL/UL 2703 tested

• Black & Veatch technical assessment

Fast Installation, Optimal Performance

Panels attach rapidly to purlins using


rivets or bolts and flange nuts

Tru3D-Gimbal™ allow for 4.5% plumbness & azimuth tolerance, 2.5" vertical & 1.75" east-west adjustment Self-powered rows eliminate central drive,
allow for easy maintenance
Or WideFlange

Tru3D-Gimbal™ drive bearing head assembly on post has vertical, east-west, azimuthal and
auto-alignment with tube, enabling perfect alignment of drive system for posts installed
imperfectly under real world conditions
Genius Tracker™ Single Axis Tracker Systems

28 MW, GA 28 MW, ID - with First Solar Series 4 modules

23 MW, OK 9.8 MW - CA - Group of Projects


Pour-in-Place™ Ballasted Ground System
Revolutionary Innovation that Pushed GameChange to Landfill Leadership

• Patent pending protected system with self-leveling


technology: 68% faster install than precast

• Substantial labor savings by eliminating moving and


shimming heavy, precast blocks

• Round tubs minimize any drainage and scouring issues –


important for landfill caps

• Integrated grounding and wire management

• Supports all poly, glass and thin film modules including First
Solar Series 4

• Available with 1 to 3 panels in portrait and 2 to 6 in landscape


“Fastest ballasted ground system I've installed:
• 20 year warranty We just drop the racks into the forms and then pour the
concrete. Very few parts, very simple to deploy.“
• ETL / UL 2703 tested
Ted Gadomski
• Independent assessment by Black & Veatch
Operations Manager, Pro Star Electric Inc
• Wind tunnel tested by industry leader CPP

TOGETHER,
LET’S REPOWER
THE PLANET.
Fastest Install of Any Ballasted Ground System

Self leveling technology with adjustable feet and slots allow fast install and
more than 7" vertical adjustability to navigate sloping ground prior to
concrete pouring

TOGETHER,
LET’S REPOWER
THE PLANET.
Concrete and Combiner/Inverter Installation Methodologies

Utilizing concrete trucks to pour directly into


tubs: 20 men install 1.64MW per week
Bobcats with pouring buckets
allow fast concrete
installation on weight
sensitive landfill caps: 20 men
install 1.54MW per week

Standard pump truck enables


even faster concrete installation:
20 men install 1.94MW per week
TOGETHER,
LET’S REPOWER
THE PLANET.
Precast Ballasted Ground System
• Industry’s longest spans and fewest foundations: as few as
190 per MW
• Supports all poly and thin film panels for all vendors
• Foundations may be precast at site or nearest precast
location
• Integrated grounding and wire management
• Full layout and engineering analysis for every project
• Fast install with up to 8 inches vertical adjustment with
post extender option beyond 1.35 inch standard slots
• Available in both 1 & 2 panels up in portrait
• Landfill solar racking leader
• 20 year warranty
• ETL / UL 2703 tested
• Wind tunnel tested by industry leader CPP

TOGETHER,
LET’S REPOWER
THE PLANET.
Landfill Racking Industry Leader
GameChange Solar is a leader in landfill solar PV racking with installations at
numerous landfill and brownfield sites in multiple states nationwide

• In house structural, mechanical and civil


engineers to support all aspects of complex
landfill and brownfield sites

• Extensive experience working with landfill


and brownfield regulatory entities and
stakeholders in 12 states

• Ability to support projects in all states

GameChange Pour-in-Place™ System 12.9 MW – New Jersey Landfill Site - Largest


Superfund Site in the United States

TOGETHER,
LET’S REPOWER
THE PLANET.
Pour-in-Place™ Ballasted Ground Systems Across the USA
12.9 MW, NJ
Largest Superfund Site in USA 4 MW, Rocky Site, MA 2.6 MW, CT

6.5 MW, MA 3.5 MW, CT 2.5 MW, NY

6.24 MW, Central MA 3.4 MW, NJ 3 MW, CA


17 MW – Group of 5 Massachusetts Landfill Sites
This group of 5 landfill Solar Systems totaling 17 MW was built with the GameChange Precast Ballasted Ground system seamlessly.

Precast ballasted ground systems were installed on five landfills in Massachusetts by a


leading EPC for the nation’s most prestigious solar landfill developer.

This is the first of two planned solar arrays in the city. The second array, a 3.8-megawatt
facility is planned for adjacent area. It will provide about two-thirds of the area's power
requirement directly.

12.9 MW – New Jersey Landfill Site - Largest Superfund Site in the United States
This 12.9 MW Solar Project was built in record time on a Landfill in New Jersey and powers 40,000 homes nearby.

The L&D Landfill 12.9 MW GameChange Solar Pour-in-Place™ System is the largest superfund landfill
project in the United States.

The system installed quickly onto a challenging landfill with several difficult sloping areas.
Stringent requirements were followed during the installation to make sure all local, state and other
regulations were followed.

6.5 MW - Three Closed Solid Waste Landfills in Western MA


All three sites were built on top of closed solid waste landfills, creating valuable re-use of otherwise useless land.

These western Massachusetts landfills require very stringent design guidelines to be followed. The
landfill cap was not allowed to be disturbed and all vegetation was required to be left in place to
required height for storm water management reasons. The sites were completed in only two months
through difficult fall and winter conditions.

2.5 MW – Largest Landfill Solar System in New York State


This site is the largest solar PV installation on a landfill in New York.
The install process is straightforward and quick. Bobcats with pouring buckets filled the forms, then modules were mounted.

Clarkstown, NY - 12 men installed 2.5 MW racking in under one week

"We selected Gamechange’s pour-in-place ballasted ground system for its superior quality,
value, and speed and ease of installation. It was a pleasure working with their team.“
Charles Feit, CEO, Onforce Solar
Grid–Lite™
Ballasted Roof System
• Interlocking grid design combined with next-gen wind
deflector reduces ballast to minimal or zero

• Industry's best system to handle most severe seismic conditions

• Integrated wire management trays enable string wiring


throughout entire array for NE & EW runs prior to panelizing

• Near zero ballast saves up to $.02/watt

• Fast install with minimal components

• 5 and 10 degree tilts

• ETL/UL 2703 listed, ETL/UL 1703/2701 Class A fire rated

• 20 year warranty

• Wind tunnel tested by industry leader CPP and rated for 150
mph wind speed

• First ballasted roof system to obtain DSA approval

TOGETHER,
LET’S REPOWER
THE PLANET.
Robust Grid Installs Fast, Excellent Wire Management

Ultra high grade galvanized interlocking rails Interlocking grid design combined with NextGen Integrated wire management trays enable string
install quickly to build grid wind deflector virtually eliminates ballast to wiring throughout entire array for NE & EW runs
minimal or zero prior to panelizing

Panel support for both 5 and 10 degree tilts: Pre-punched slots in wind deflectors enable fast Fire proof, durable galvanized and stainless steel
EPDM block available in place of slip sheets east-west string wiring prior to panelizing components
GameChange Roof Systems Across the USA
2.2 MW, NY 700 KW, CA

1.9 MW, NY 1.0 KW, Cumberland RI

1.2 MW, Providence RI 402 KW, Burlington CT


Standing Seam
Roof System
• Includes rails, rail jumpers, L-feet, seam clamps, panel
clamps and all hardware
• Seam clamps available for standard metal seam roofs
• Zero ballast and no penetrations
• Fast install with minimal components
• Aluminum jumper strip provided for bonding rails
• Fire proof, durable aluminum and stainless steel
components
• Full layout and engineering analysis for every project

TOGETHER,
LET’S REPOWER
THE PLANET.
Low Cost, Fast Install

L foot attached to seam clamp with standard hardware Aluminum jumper strip provided for bonding rails

Rail mount includes rails, rail jumpers, L-feet, seam clamps, self ETL / UL panel clamps bond module frames to racking
grounding ETL/UL panel clamps & all hardware assembly

You might also like