Contingency Plan

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Contingency Plan

Name of Production: Lacoste Sparkling Producers Name: Amelia Davis Contact


Number: -

Location / scene Potential problem Effect on production Control Measure

Studio Model is absent/doesn’t show Can’t go forward with filming. Find someone else that could fill the role.
up.
Studio Not being able to shoot some Can’t shoot the certain pose. Find alternative poses to shoot instead.
of the poses, because of
dress.
Studio Camera breaks/runs out of Can’t film anything. Get another camera to film on.
battery.
Studio Forgets a prop. Filming would be pushed back. Find scenes to film in the meantime or
alternate the shot slightly.

Studio Lighting breaks or doesn’t Would make production hard Find different camera angels that might
look right and not lit properly. look better.

Studio Crew become absent or Would become tricky and Would have to find someone else to help
doesn’t show up. would take longer to film as shoot.
we’d be down one person.
Studio Studio gets overbooked and Would have to change days and Would have to reschedule the whole
cannot film in there. filming would be pushed back. production.

You might also like