ANALYSIS OF RATE

Providing Hoisting and fixing Pre - Cast RCC drain cover of grade M-25 on drain to cover the drain
Item including cost of reinforcement and centering shuttring complete in required sizes / shape and of
required thickness as per drawing and direction of the Engineer-In charge.

(Based on Morth AR second revision 2019/Item No. 5.13 ref to M 519 (B-II)/Page No. 175 to
177 and Market rates).

Code Description Qty. Unit Rate


Details of cost for 1.00 cum
Material
1. Based on MoRTH A/R Item No. 14.11

(a) RMC M-25 all work up to Plinth Level, DSR Item


No. 5.33.1 1 cum 6446.45
(b) Reinforcement TMT DSR Item No. 5.22.6 50 Kg. 56.60
Total
(c) Shuttring @ 2%
(d) Extra Labour for Lifting 1.1 day 368.00
Total Rs. (W)
Add Water Charges @ 1% on (W)
Add 15 % CP and OAH
Total
Rate per cum
n drain to cover the drain
ired sizes / shape and of

9 (B-II)/Page No. 175 to

Amount Rs.

265306.1

2.2356 15456

6446.45
2830.00
9276.45
185.53
404.80
9866.78
4.05
60.72
9931.55
9931.55