Professional Documents
Culture Documents
G1280-DP45-G0001 - Id93857432 - G1280-DP45-G0001 - Rev 1 - Bulktank Cement 113 m3 Incl. - Seadrill West Jupiter
G1280-DP45-G0001 - Id93857432 - G1280-DP45-G0001 - Rev 1 - Bulktank Cement 113 m3 Incl. - Seadrill West Jupiter
72 TYP
TOP VIEW N06 N07 N08 SECTION D-D E02
H01
E01
H Note 4 1835 125 Note 5 H
4240 4486
Ø 3700
1818
Note 7
1
Note 9
1200
Note 3 Note 3
100 Note 3
Datum point
4059
0
2400
G G
Note 3
E D D
1950
Note 9
1
E Y
01
X N05
F N02 N01 F
N09 4218
200
E E
SECTION E-E
400
310
SCALE (1 : 10)
Ø 120
150 TYP 82,5 TYP
12400 to top of tank
Ø 65
45 TYP
465
13393
180
80
11210
GENERAL NOTES
11245
Center of Gravity 1 Ø 50
D Operating - Inside of tank have ladder for access to fluidizing system. D
39 C.O.G. Empty - All interface nozzles to be equipped with flexible bellows.
Center of Gravity
2500 - Pads (note 6), tank support, foundation bolts and cable tray
FOOTPRINT is yard supply.
DESIGN DATA - Access to manway is yard supply.
CLASSIFICATION SOCIETY… ABS+CDS 2006 - The tank must move freely on loadcells.
G G A CODE…………………………... ASME sect. VIII div.1 - All instruments suitable for Zone II
PRESSURE, OPERATING…... 5,0 barg - Surface treatment:
DESIGN………... 5,5 barg Bulk Tank:
CARGO, DESCRIPTION... Cement Outside: NOV HLA-4A System No. 1, RAL 9002.
DENSITY………. 1,5 t/m3 Inside: NOV HLA-4A System No. 5.
Note 9 Note 9 DESIGN TEMP. RANGE………. -10° to +50° Platform: NOV HLA-4A System No. 1, RAL 1023.
CORROSION ALLOWANCE….. 1,0 mm
Tag List
5943 C.O.G. Operating
C Note 2 PSV CAPACITY: 2286 Nm3/h at 5,5 barg Qty. Pos. Description/Dimension Tag # C
N10
5721 C.O.G. Empty
n54
NOTES 1 23-Sep-2013 Reissued for Approval HMS SGIN OFI
0 12-Apr-2012 Issued for Approval OFI SGIN ROEK
NOZZLE TABLE
(477)
2. Earthing Boss (2x) This document contains proprietary and confidential information which
belongs to National Oilwell Norway AS. It is loaned for limited purposes
70
3. Lifting Lugs top (3x) N01 5" ANSI B16.5 150lbs RF Vent line 1126 650 12505 only and remains the property of National Oilwell Norway AS.
Reproduction, in whole or in part, or use of this design or distribution of
Z N02 5" ANSI B16.5 150lbs RF Filling line 1256 336 12505 this information to others is not permitted without the express written
c1 Lifting Lug bottom (1x) consent of National Oilwell Norway AS. This document is to be returned
National Oilwell Varco Norway AS
4. Maintenance area N03 5" ANSI B16.5 150lbs RF Discharge 1732 -1000 1145 to National Oilwell Norway AS upon request and in any event upon
completion of the use for which it was loaned.
P.O. Box 168, Drengsrudhagen 4
N-1371 Asker, Norway
Datum point N04 3" ANSI B16.5 150lbs RF Air Inlet 2001 0 710 Title:
Z Datum point 5. Handrail to be mounted to tank 3D21401D PSV (Outlet)
Note 8 6. 4 x Load Cell Pads with 6xM24 hole pattern
N05 3" ANSI B16.5 150lbs RF 769 919 12634 General Arrangement Drawing
Y Pressure Transmitter with Bulktank Cement 113 m3 incl.
to be supplied by yard N06 2" ANSI B16.5 150lbs RF -850 -300 12506
Indicator
7. Handrail to be mounted to tank 3D21401A N07 2" ANSI B16.5 150lbs RF High level switch -850 0 12507
Seadrill West Jupiter
A 8. Yard pads recommended to be c 1 Scale: Projection: Size: Main Part: A
X 1 N08 3" ANSI B16.5 150lbs RF Manual sounding (Blinded) -850 300 12505 1:30 A1
N09 24" Hinged N/A Man way top 1006 -581 12446 Drawing Number: Sheet: Revision:
9. For reaction forces see document G1280-N-RD-001 N10 24" Davit N/A Man way bottom -1030 -1784 2450 G1280-DP45-G0001 1 /1 1
12 11 10 9 8 7 6 5 4 3 2 1