Small Engine and Mud Pump Status
Small Engine and Mud Pump Status
JOB NO DESCIPTION NATURE OF JOB CURRENT STATUS TARGET DATE JOB STATUS
MUD/FEB22/16 RD 520 MUD PUMP OVERHAUL ASSEMBLY COMPLETED 18/02/2022 OPEN
ENG/FEB22/24 KIRLOSKAR 6.5 HP ENGINE OVERHAUL ASSEMBLY COMPLETED 2/3/2022 CLOSE
ENG/FEB22/26 KIRLOSKAR 6.5 HP ENGINE OVERHAUL ASSEMBLY COMPLETED 5/3/2022 CLOSE
ENG/MAY22/63 ZS1110 SMALL ENGINE OVERHAUL ASSEMBLY COMPLTED AND TESTING DONE 15/05/2022 CLOSE
MUD/MAY22/64 BW320 MUD PUMP OVERHAUL SHIFTING FORK FITMENT DONE 25/05/2022 CLOSE
ENG/MAY22/72 ZS1110 SMALL ENGINE OVERHAUL WAITING FOR TIMING GEARS AND TANK 15/06/2022 OPEN
ASSEMBLY COMPLETED AND TESTING DONE
ENG/MAY22/74 USHA 4HP AIRCOOL OVERHAUL 15/06/2022 CLOSE
MUD/JUN22/78 BW160 MUD PUMP (P-6) OVERHAUL WAITING FOR INPUT SHAFT 20/06/2022 OPEN
ENG/JUN22/81 USHA 4HP AIRCOOL OVERHAUL ASSEMBLTY AND TESTING DONE 15/7/2022 CLOSE
MUD/JUN22/82 AMERICAN PUMP (P-47) OVERHAUL WAITING FOR SECTION LINE 25/06/2022 OPEN
ASSEMBLY COMPLETED YET NOT TESTING
MUD/JUN22/85 BW160 MUD PUMP ( R-101) OVERHAUL 20/06/2022 OPEN
DONE
MUD/JUN22/91 BW160 MUD PUMP P-90 COMPLETE READY COMPLETE READY AND TESTING DONE 27/06/2022 CLOSE
MUD/JUN22/92 BW160 MUD PUMP P-91 COMPLETE READY COMPLETE READY AND TESTING DONE 27/06/2022 CLOSE
MUD/JUN22/93 BW 160 MUD PUMP R-100 OVERHAUL ASSEMBLY COMPLETED 2/7/2022 CLOSE
ASSEMBLY COMPLETED TESTING TO BE
MUD/JUL22/97 BW600 MUD PUMP OVERHAUL DONE 6/7/2022 OPEN
MUD/JUL22/101 AMERICAN PUMP P-50 OVERHAUL COMPLETED YET NOT TESTED 7/15/2022 OPEN
ASSEMBLY COMPLETED TESTING TO BE
MUD/JUL22/103 BW 320 MUD PUMP R-115 OVERHAUL 7/20/2022 OPEN
DONE
ENG/JUL22/104 USHA 4HP AIRCOOL OVERHAUL ASSEMBLY COMPLETED CLOSE
ENG/JUL22/108 DM20 WATER COOL INSPECTION ASSEMBLY AND TESTING DONE 28/0-7/2022 CLOSE
ASSEMBLY COMPLETED , WAITING FOR
MUD/JUL22/109 BW320 MUD PUMP R-117 OVERHAUL OPEN
SECTION NIPPLE
ENG/JUL22/110 ZS1110 SMALL ENGINE OVERHAUL WAITING FOR SPARES 8/10/2022 OPEN
MUD/JUL22/113 BW160 MUD PUMP COMPLETE READY DELIVERY LINE FITMENT TO BE DONE 8/5/2022 OPEN
MUD/JUL22/114 BW160 MUD PUMP COMPLETE READY DELIVERY LINE FITMENT TO BE DONE 8/5/2022 OPEN
MUD/JUL22/115 BW160 MUD PUMP COMPLETE READY DELIVERY LINE FITMENT TO BE DONE 8/5/2022 OPEN
ENG/JUL22/116 NEW ZS110 SMALL ENGINE COMPLETE READY COMPLETE READY , TESTING TO B DONE 8/5/2022 OPEN
ENG/JUL22/117 NEW ZS110 SMALL ENGINE COMPLETE READY COMPLETE READY , TESTING TO B DONE 8/5/2022 OPEN
ENG/JUL22/118 NEW ZS110 SMALL ENGINE COMPLETE READY COMPLETE READY , TESTING TO B DONE 8/5/2022 OPEN
ENG/AUG22/119 DM20 SWARAJ WATERCOOL INSPECTION DISMANTLING IN PROGRESS OPEN
S
REVISED COMPONENT NOTE
5HP ENGINE BELT DRIVE NEED TO ORDER
ALTERNATOR COMPLETE READY
ALTERNATOR REMAINS TO FIT
10/7/2022 TO BE FIT WITH BW160 P-6
7/30/2022 R-153 PUMP FLEET ON R-153 MACHINE
10/8/2022
CENTRIFUGAL PUMP READY
6/7/2022 ZS1110 WAITNG FOR ENGINE
7/14/2022 CENTRIFUGAL PUMP READY
10/7/2022 TATA 407 2INCH ELBOW
R-101 TO BE MOUNT ON MACHINE
ZS1110 TRANSFERRED TO SITE
ZS1111 COUPLED WITH NEW ZS111O ENGINE
DICD 30 PUMP MOUNT ON MACHINE
WAITING FOR ENGINE
WAITING FOR ENGINE
R-115 PUMP READY
7/28/2022 CENTRIFUGAL PUMP WAITING FOR CHASSIS
ENGINE ASSEMBLYCOMPLETED
ENG/MAY22/74 USHA 4HP AIRCOOL CENTRIFUGAL PUMP
AND TESTING DONE
ENGINE ASSEMBLYCOMPLETED
ENG/JUN22/81 USHA 4HP AIRCOOL CENTRIFUGAL PUMP
AND
ENGINE TESTING DONE
ASSEMBLYCOMPLETED
ENG/JUL22/104 USHA 4HP AIRCOOL CENTRIFUGAL PUMP
AND TESTING DONE
ENG/JUL22/108 DM20 WATERCOOL ASSEMBLY AND TESTING DONE
UMP
REMARKS
READY COMPONENTS ITEMS STATUS REMARKS
NEW ZS1110 WITHBW160
READY 2 NOS READY
MUD PUMP
ONE 4G11T ENGINE RECEIVED FROM SITE. HAVE TO BE CHECK THE CONDITION