Professional Documents
Culture Documents
Contract Assignment
Contract Assignment
Contract Assignment
BETWEEN:
ABC LLC
AND
XYZ LLC
The First and Second Parties are hereinafter, where the context so dictates, singularly referred to as ‘Party’
and collectively referred to as ‘Parties’.
Preamble
B. ABC wishes to enter to an agreement with XYZ for carrying out business. Accordingly, the Parties
have agreed to cooperate by entering to this Agreement. The Parties shall carry out the Scope of
work and shall exercise their respective rights and perform their respective obligations in
accordance with the terms and conditions of this Agreement.
C. This Preamble and the annexures of this Agreement shall be integral part of this Agreement,
complementary to it, and shall be read alongside it.
Agreed Terms
2.1. This Scope of Work includes the collection, export paperwork at country of origin and the delivery
of Animals to the Port of Entry within the UAE, in accordance with the delivery programme.
2.2. The SOW is divided between ABC and XYZ as follows:
a) Carrying out the process of collection of Aquatic Animals in Oman by providing the
expert personnel,
c) Responsible for ensuring the export and delivery of the Aquatic Animals in accordance
with Delivery Programme and any other terms and conditions of the agreement
d) If required, travel with Aquatic Animals to the Port of Entry within UAE and any other
location where marine animals are required to be exported,
e) Responsible for arrangement and provision of all kinds of equipment required for
transportation and the movement of the Aquatic Animals to the Port of Entry in UAE.
g) Responsible for ensuring that the Aquatic Animals follow the quality specifications
and any other specifications set out.
a) Arranging the relevant government approvals required for collection and relevant
documentation for transport and delivery of the Aquatic Animals to UAE.
d) Responsible for arrangement of water vessels for safe collection of Aquatic Animals
and relevant diving equipment.
3. The obligations of the parties to this Agreement are subject to ABC obtaining all the government
approvals and licenses prior to commencing the work.
4. XYZ will pay a sum of OMR 40,000 to ABC which shall be inclusive of taxes.
7. In the event that the agreement is terminated due to default in Scope of Work or failure or breach of
obligations or any other reason, then the defaulting party shall be liable to pay the other party all the
costs and expenses incurred by other party in implementing its Scope of Work and obligations under
this Agreement till the date of termination.
8. Severance
Authorised Signatory
Authorised Signatory