5 - 16MM DIA.

HORIZONTAL BARS, BOTH WAYS

A.REFERENCES
1.5 METER MAST ARM LENGTH
I.D.A.F.- INSIDE DIAMETER ACROSS FLAT a. NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP), 7TH
O.U.N.- UNLESS OTHERWISE NOTICE EDITION (2015)
P.C.D.- PITCH CIRCLE DIAMETER b. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) 360
O.C.- ON CENTER c. AMERICAN CONCRETE INSTITUTE (ACI) 318
10MM DIA TIES SPACED 1 @ 50MM,
2 @ 75MM, REST @ 100MM O.C. d. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) 360
1500 59 B.DESIGN LOADS

700
150 a. DEAD LOAD
i. CONCRETE 24 KN/M3
ii. STEEL 77 KN/M3
iii. SOIL 18 KN/M3
700 iv. POLE ATTACHMENTS 50 KG

b. WIND LOAD
i. WIND SPEED 250KPH
FOOTING DETAIL -1 (PLAN) ii. EXPOSURE CATEGORY D
iii. DIRECTIONALITY FACTOR 0.85
iv. OCCUPANCY CATEGORY V (MISCELLANEOUS STRUCTURE)
12-120MM DIA MAIN BARS
C. MATERIALS

MOUNTING HEIGHT 12MTS.

500
3 SETS

700
a. NORMAL WEIGHT CONCRETE FC = 28 MPA (4000 PSI)

b. REINFORCING STEEL
i.12MM@ AND BELOW FY = 276 MPA (GRADE 40)
175 350 175
ii.16MM@ AND ABOVE FY = 414 MPA (GRADE 60)
700 c. STRUCTURAL STEEL
SPOT DETAIL i.STEEL POLE FY = 240 MPA (A53 GRADE B)
PEDESTAL DETAIL FU=415 MPA
ii.BASE PLATE & STIFFENER FY = 276 MPA (A36)
FU= 400 MPA
iii.STRUCTURAL BOLTS AND FASTENERS FNT= 310 MPA (A307)
SEE SPOT DETAIL
FNV= 165 MPA
4 - 25MM DIA. ANCHOR BOLT iv.WELDS E60XX ELECTRODE
SHOULDER 10MM DIA TIES SPACED 1 @ 50MM, W/ NUTS AND WASHER
2 @ 75MM, REST @ 100MM O.C.
D. DESIGN APPROACH
EXISTING PCCP

NGL
i. LOAD AND RESISTANCE FACTORED DESIGN (LRFD) IS USED TO DESIGN

280
PCCP PCCP THE STEEL ELEMENTS.
j. ULTIMATE STRENGTH DESIGN (USD) IS USED TO DESIGN THE CONCRETE
ELEMENTS.
700 12 - 20MM DIA. VERTICAL BAR k. WORKING STRESS DESIGN (WSD) IS USED TO PARTIALLY DESIGN THE
FOUNDATION.

1700
l. LOAD COMBINATIONS CORRESPONDING TO THE DESIGN PHILOSOPHIES
280

EXISTING PCCP MENTIONED ABOVE ARE UTILIZED WHICH ARE BASED ON THE NSCP 2015.
5 - 16MM DIA. HORIZONTAL
BARS, BOTH WAYS E. NOTES ON DESIGN LOADS
400 400
a. IF THE ASSUMED DESIGN LOADS IS NOT APPLICABLE FOR THE REQUIRED
DESIGN, THE DESIGN SHALL BE REVISED ACCORDINGLY.

300
F. NOTES ON FOUNDATION
CUT & FILL 1.80

a. THE FOUNDATION IS DESIGNED FOR AN ASSUMED ALLOWABLE SOIL


BEARING CAPACITY (SBC) OF 96 KPA (2000 PSF). IF THE LOCATION IS
TYPICAL LAMP POST ELEVATION KNOWN OR FOUND OUT TO HAVE AN SBC OF LESS THAN THE ASSUMED,
FOOTING DETAIL -1 (SECTION) THE FOOTING DESIGN SHALL BE REVISED ACCORDINGLY.

WELL COMPACTED b. NO FOOTING SHALL REST ON FILL. PROVIDE 100MM THICK PROPERLY
GRAVEL FILL SUB-GRADE WELL
COMPACTED GRAVEL BED BEFORE CASTING
1.80

G.NOTES ON ASSEMBLY

a. MANUFACTURER MAY SUPPLY A PRE-ASSEMBLED STEEL POST WITH

280
NOTES: SOLAR STREET LIGHTS (NET OUTPUT POWER OF 150W) ACCESSORIES MAST ARM, STIFFENERS, AND/OR BASE PLATE) PROVIDED
THAT ITS DESIGN IS BE FOR THE DESIGN LOADS AND MATERIAL
1. ALL STEEL PLATES TO COMFORM TO ASTM A36 OR ANY 1. SOLAR PANEL : 36V/160W MONOCRYSTALLINE SILICONE STRENGTHS PROVIDED IN THE ITEMS ABOVE.
EQUIVALENT. 2. BATTERY: GRADE A LIFEPO4 BATTERY, ATLEAST 48Ah/25.6V b. DESIGN CALCULATIONS/SPECIFICATIONS OF THE PRE-ASSEMBLED STEEL
2. ALL WIELDS ARE TO COMFORM TO AWS D1.1. 3. LED LIGHT: HIGH LUMEN CHIPS RATED POWER OF 150W POST MUST SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR
3. ALL SHARP EDGES AND BURRS TO BE REMOVED 4. LUMENS FLUX:NOT LESS THAN 20,000 LUMENS INSTALLATION
4. ALL TAPER LOCK JOINT LENGTH ARE NOMINAL U.O.N. 5. CHARGE TIME:6-7 HOURS CUT & FILL

5. ALL STEEL TO BE FULLY HOT DIP GALVANIZED AFTER 5. LIGHTING TIME:12 HOURS
FABRICATION IN ACCORDANCE WITH ASTM A123. 6. WORKING TIME UNDER FULL POWER: 12 hrs.
6. ALL POLES ARE CIRCULAR. 7. CHARGE TIME (1,000W/m2) : 7hrs 4-16mm STIFFENER PLATES,

7. SPECIFICATION OF LED LIGHTING FIXTURES TO BE 8. COLOR TEMPERATURE: WARM WHITE: 3,500-5,000° K


USED IS SPECIFIED AND APPROVED BY ROAD BOARD. 9. MOUNTING HEIGHT : 10-12M
8. STREET LIGHTS THAT WILL BE DETERIORATED OR 8. CHARGE CONTROLLER: OEM INTELLIGENT CONTROL FOR
MALFUNCTIONED WITHIN 5 YEARS SHALL BE REPLACED CIRCUIT PROTECTION
BY THE CONTRACTOR. 10. WORKING UNDER RAINY DAYS: 7-10 DAYS 1.80

11. PROTECTION GRADE : IP66 OR HIGHER


12. WARRANTY: 5 YEARS
EXCAVATION PLAN -1 STIFFENER DETAIL
DRAFTED: RECOMMENDED: APPROVED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT J-AHR JOSHUA E. GONZALES
DEPARTMENT OF PUBLIC WORKS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEER I
SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER
AND HIGHWAYS R.A. 11239, CONSTRUCTION/INSTALLATION OF SOLAR LED LIGHTS AT 10
INSTALLATION OF SOLAR LED PREPARED:
REGIONAL OFFICE I BARANGAYS SAN FELIPE SUR, SAN FELIPE CENTRAL, CAPAS, PASILENG
STREET LIGHT (SINGLE ARM) JOSE B. EGUILOS, JR ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III
SAN FERNANDO CITY, LA UNION
SUR, PASILENG NORTE, BALANGOBONG, MANGCASUY, SUMABNIT, BUED,
JOHN MICHAEL L. HIDALGO 13
POBLACION, CANARVACAN, STA. MARIA NORTE, CILI, BUGAYONG AND CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC, ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
STO.NINO, BINALONAN, PANGASINAN ENGINEER II
LOCATION : BINALONAN, PANGASINAN DATE: DATE: DATE: DATE: