ESTIMATES
Bills of Materials
General Requirements
QTY. UNIT DESCRIPTION PRICE (Php) TOTAL COST (Php)
Mobilization 600,000 600,000.00
Demobilization 100,000 100,000.00
Temporary facilities and
50,000 50,000.00
office
Safety Requirements 50,000 50,000.00
Temporary communications 20,000 20,000.00
Plans, Permits, Bonds, and
150,000 150,000.00
Insurance
Security and Warehouse 30,000 30,000.00
Temporary Power and
50,000 50,000.00
Water
Sub-total 1,050,000.00
EARTHWORKS
QTY. UNIT DESCRIPTION PRICE (Php) TOTAL COST (Php)
2,137 cu.m Excavation 3,500/3hrs. 252,000.00
658 pcs Cofferdam (0.7m x 8m) 2,800 1,842,400.00
32 pcs Backfilling 7,500 240,000.00
4 pcs Water Pump 350/day 21,000.00
97 pcs Soil Fill 2,400 232,800.00
Material Cost 2,588,200.00
Labor 1,035,280.00
Supervision/ Contingencies 258,820.50
Sub-total 3,882,300.00
CONCRETE WORKS
FORMWORKS
QTY. UNIT DESCRIPTION PRICE (Php) TOTAL COST (Php)
1,321 pcs Phenolic Board 700 924,700.00
17,188 bd-ft 2” x 2” Lumber 100 516,157.00
Material Cost 1,440,857.00
Labor 567,342.80
Supervision/ Contingencies 144,085.70
Sub-total 2,161,285.00
SUMMARY
ITEM SUB-TOTAL COST (Php)
General Requirements 1,050,000.00
Earthworks (Excavation and Backfilling) 3,882,300.00
Concrete Works & Rebar Works 9,085,614.00
Formworks 2,941,700.00
Total Project Cost 16,179,199.50
A. EARTHWORKS
V = 2137 m3
2. Volume of backfill
V= 507.6 m3
507.6
No. of dump truck = = 32 pcs
16
3. Cofferdam
460
No. of steel sheet pile = =657.14 pcs
0.7
4. Water Pump
V = 1537 m3
1 – Volume of dump truck = 16 m3
1537
No. of dump truck = = 97 pcs
16
B. CONCRETE WORKS
1. Volume of base
V1 = 120 m3
2. Volume of stem
V2 = 162 m3
V3 = 27.6 m3
V4 = 227.7 m3
5. Total Volume
Vt = V1 + V2 + V3 + V4
Vt = 531.3 m3
C. REBAR WORKS
200,000
No. of cut bars = + 1 = 1820 pcs.
110
1820
=1 pc
1
1820
No. of bars = =1820 pcs .
1
5000
No. of layers = +1=29layers
180
200,000
No. of cut bars = =35 pcs . per layer
5750
6.0
=1 pc
5.75
2030
No. of bars = =2030 pcs .
1
200,000
No. of cut bars = =1335 pcs .
150
6.0
Using 6m. commercial length: =1 pc .
4.5
1335
No. of bars =1335 pc .
1
80,000
No. of cut bars = +1 = 536pcs.
150
6.0
= 6pc.
1
536
No. of bars = =90 pcs .
6
2200
No. of layers = +1 = 12layers
200
80,000
No. of cut bars = =¿ 14pcs. /Layer (12layers)
5750
6.0
=1Pc.
5.75
378
No. of bars = = 168pcs.
1
200,000
No. of cut bars = + 1 = 954pcs.
210
6.0/3.0 = 2pc.
954
No. of bars = = 477pcs.
2
200,000
No. of cut bars = + 1 = 1335pcs.
150
6.0
= 1pc.
4.0
1335
No. of bars = = 1335pcs.
1
3000
No. of layers = + 1 = 15 layers
220
200,000
No. of cut bars = = 35pcs. per layer
5750
6.0
= 1pc
5.75
405
No. of bars = = 525pcs.
1
3600
No. of layers = + 1 = 13 layers
300
200,000
No. of cut bars = =35pcs. per layer
5750
455
No. of bars = = 455pcs.
1
10. Dowels
6.0
= 12pcs.
0.5
1812
No. of bars = = 151pcs.
12
6.0
= 3pcs
1.86
1669
No. of bars = = 557pcs.
3
6.0
= 1pc
5.75
840
No. of bars = = 840pcs.
1
58 ( 1820 )( 0.25 m )
@Slab =
53 m/kg
@Slab = 498kgs.
15 ( 90 )( 0.25 m )
@Stairs =
53 m/kg
@Stairs = 7kgs.
14 ( 477 )( 0.25 )
@Front face =
53 m/kg
13 ( 1335 )( 0.25 )
@Rear face =
53 m/kg
@Base = 64kgs.
D. Formworks
9. Total Area
At =2706.78 m2