Professional Documents
Culture Documents
GIM007 Well Summary Rev6
GIM007 Well Summary Rev6
GIM007 Well Summary Rev6
GIM007 Realized
EA1 fluid
EA2 fluid
Elements description
m MD/RT2
Depths
m TVD/RT2
P&A References
Water Depth
(m)
103.0 GIM-007 :
Abandoned branch
Historic
BHA stuck @ 2978m & left in hole. TOF @ 2711m
Cement plugs 40t spot @ 2698m
RT1 / Sea Bed 125.0 17t spot @ 2670m
EA3
EA2
EA1
EA0
Tbg Hanger 26.5 26.5 RT1 / MSL 22.0 GIM-007 bis : Initiate ST @ 2590m.
Abandoned branch BHA stuck@ 2632m & left in hole. TOF @ 1901.5m
MSL 35.6 35.6 TH / MSL 9.1 Cement plugs 15t spot @ 1805m. TOC @ 1621m.
TH / Sea Bed 112.0 GIM-007 ter Initiate ST @ 1718m, drilling cement from 1621 to 1718 m
Well drilled : Oct. 1975: drill and complete the well w/ tender NAVIFOR II (RT 1)
Mud line 138.6 138.6 RT1 / TH 12.95 WO #1 Jan. 1976: Completion change (replace packer w/ Navifor II)
TOC EA3 138.6 138.6 RT2 (SETTY) / MSL 35.6 WO #2 Sept. 1976: Completion change (fix TH leak w/ tender Ile D'Ouessant)
Squeeze cement EA2 TOC 140.5 140.5 RT2 (SETTY) / TH 26.5 WO #3 Nov 1977: Completion change (MGL change w/ tender IDO)
24"x 16" Package cut 145.5 145.5 WO #4 Sept 1980: Completion change for 13% Cr (w/ IDO)
TOC Plug #5 (Tagged) 148.0 148.0 WO #5 March 1992: Completion change (fix DHSV w/ tender SEAREX 9)
10-3/4" casing cut 155.0 155.0 01/08/1999 Communication EA/Control
24'' driven CP - no specs 158.9 158.9
5 Notes line confirmed
1.17 sg EMW
18/01/2002 Squeeze brine (but no cement) in EA0 to kill surface pressure for rig approach
Squeeze cement EA2 BOC 159.5 159.5 MSL -> Mean sea Level
58m TH -> Tubing Hanger, reference @ lock down 21/10/2015 Definitive abandonment of the well.
screws level
TOC Plug #4 (Tagged) 206.0 206.0
22'' OH x 16'' casing shoe Architecture
265.7 265.7
75# K55 w/ API connections
7-5/8" casing cut 300.0 300.0
4 24'' CP - no specs
Description m MD/RT2
158.9
m TVD/RT2
158.9
144m
16'' casing 75# K55 c/w API connections 265.7 265.7
Bottom Plug #4 350.0 350.0 10-3/4" casing 51# K55 c/w API connections 1 472.3 1 249.1
7-5/8" casing 33.7# N80 c/w API connections 3 575.7 2 945.0
Top of 3-1/2" sacrificial tubings (2000m) 550.0 550.0
Squeeze cement EA1 TOC 879.5 810.7
1.35 sg EMW
Completion - SEAREX 9
4 1/2'' tubing 12.6# N80 13% Cr- New Vam connections
3 1/2'' tubing 9.2# L80 13% Cr - New Vam connections
Squeeze cement EA1 BOC 1 051.5 935.8 Packer fluid: Brine 1.02 sg
S well
Maximim inclination 45.25° @ 2510 m
TOC calculation
EA1 & EA3: Given in RTFS. In EA3, extra cement plug squeezed f/ surface w/ 1.39sg WBM
14 3/4" OH x 10 3/4" casing shoe EA2: TOC given by volumes calculations method considering 8m3 losses and 2m3 in shoe track. In EA2, extra
1 472.3 1 249.1
51# K55 w/ API connections cement plug squeezed f/ surface w/ 1.39sg WBM
Squeeze plugs TOC & BOC (in EA1 & EA2) given by volumes calculations method f/ WH level
1.09 sg EMW
TOC Plug #3 (Tagged & P/Tested @ 2000 psi) 2550.0 2051.0
Depth
Hydrocarbon reservoir
Top of 7-5/8" casing window 2 690.0 2 151.0 3 formation
Layers Perforation ?
m MD/RT2 m TVD/RT1 m TVD/MSL
183m Top 2 743.6 2 196.6 2 161.0
BOC Plug #3 2733.0 2181.0
Bottom of 7-5/8" casing window 2 742.0 2 191.0
Top of Perforations #2
Bottom of Perforations #2
3 533.1
3 538.1
2 903.9
2 908.7
1 BATANGA R2 No
3 521.6
3 524.8
2 893.2
2 896.2
2 857.6
2 860.7
103m
1600.0
500.0
1400.0
1000.0
1200.0
1000.0
1500.0
800.0
2000.0
600.0
2500.0
400.0
3000.0 200.0
0.0
3500.0 -800.0 -600.0 -400.0 -200.0 0.0