REVISION STATUS

NO. DRAWING NO. SHEET NO. DRAWING TITLE REMARKS


IFR IFA AFC
1. WELL-900-C-FOU-1015 1 OF 4 Drawing index 4
2. WELL-900-C-FOU-1015 2 OF 4 Foundation plan 4
3. WELL-900-C-FOU-1015 3 OF 4 Detail 4
4. WELL-900-C-FOU-1015 4 OF 4 Sections 4

4 16/09/2022 APPROVED FOR CONSTRUCTION WBS RHA RHA


3 24/06/2022 APPROVED FOR CONSTRUCTION AHD RHA RHA
2 02/02/2022 APPROVED FOR CONSTRUCTION (As per TRA N° TRA-AR30921-005-REV2) WBS MYA MYA
1 21/01/2022 ISSUED FOR APPROVAL WBS MYA MYA
0 12/11/2021 ISSUED FOR REVIEW WBS MYA MYA
Rev. DATE DESCRIPTION DRAFT CHK'D APPR

REVISIONS

CONTRACT N° AGREEMENT N° 2061 (20)


DETAIL ENGINEERING FINALIZATION, MATERIAL PROVISION AND
INSTALLATION OF PIGGING FACILITIESAT MLN FIELD BLOCK 405A

Pig LAUNCHER (L-905) -18 " MLN Trunkline


Pipe Support Foundation plan & section
DRAWING INDEX
SCALE PROJECT NO COMPANY'S DOCUMENT NUMBER SHEET REV

NONE 2061 (20) WELL-900-C-FOU-1015 1 OF 4 4


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

THIS DOCUMENT IS THE UPDATED VERSION OF THE EXISTING DOCUMENT SHOWED BELLOW :

M
Foundation plan DOC. NO.

WELL-900-M-PSD-5075
REFERENCE DRAWING
Piping Support Detail for Pig Launcher (18 " MLN Trunkline)
REV.
-

WELL-900- C-SSU-1001 Pig LAUNCHER (L-905) - 18 " MLN Trunkline - Pipe Support Layout 4

NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
2. ALL ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE
1000 SQ. 3. QUALITY OF MATERIAL SHALL BE:
L = = 900 SQ. - CONCRETE : fc'= 30 MPa (CEMENT TYPE V)
900 SQ. - LEAN CONCRETE : fc'= 14 MPa
400 SQ. = = - REINFORCEMENT BAR : DEFORMED BAR fy = 420 MPa
= =
= = 400 SQ. 275 350 SQ. 275 - ANCHOR BOLT : ASTM F1554-07 GRADE 36 HOT DIP
FOOTING C
L FDN = = FOOTING = =
GALVANIZED
PEDESTAL CL FDN 4. TWO COATS OF BITUMINOUS PAINT SHALL BE APPLIED TO ALL
FOOTING C PEDESTAL
L FDN CONCRETE SURFACE BELOW GROUND.
PEDESTAL

300
I

250

370
C

1000
B
400
C
= =
200

L FDN
C B

= =
200
C FDN

400
900
L FDN

= =
160
SHT-3

900
SHT-3 SHT-3
H
4-M16
4-M16

370
ANCHOR BOLTS
300

ANCHOR BOLTS

250
300x300 (REF) 300x300 (REF)
BASE PLT BASE PLT
300 200 50 300 250 50 200 50 250 4-M10
50
= = ANCHOR BOLTS 160
G = =
50 50 50 50 = =
1000 900 200x200 (REF)
BASE PLT

F
FOUNDATION PLAN F1 FOUNDATION PLAN F1A FOUNDATION PLAN (F11)
SCALE 1 : 10 SCALE 1 : 10 SCALE 1 : 15

1480
740 740
E
300 440 440 300

138
1780

= =
300
4-M12
D
ANCHOR BOLTS

250x250 (REF)
4 16/09/2022 APPROVED FOR CONSTRUCTION WBS RHA RHA
BASE PLT
1533

3 24/06/2022 APPROVED FOR CONSTRUCTION AHD RHA RHA


645

2 02/02/2022 APPROVED FOR CONSTRUCTION (As per TRA N° TRA-AR30921-005-REV2) WBS MYA MYA
1 21/01/2022 ISSUED FOR APPROVAL WBS MYA MYA
0 12/11/2021 ISSUED FOR REVIEW WBS MYA MYA
1067

C Rev. DATE DESCRIPTION DRAFT CHK'D APPR

SHT-3 REVISIONS
300
150

B CONTRACT N° AGREEMENT N° 2061 (20)


DETAIL ENGINEERING FINALIZATION, MATERIAL PROVISION AND INSTALLATION
OF PIGGING FACILITIES AT MLN FIELD BLOCK 405A

FOUNDATION PLAN (F4) FOUNDATION PLAN (S1)


SCALE 1 : 15 SCALE 1 : 15
A Pig LAUNCHER (L-905) -18 " MLN Trunkline
Pipe Support Foundation plan & section
Foundation plan

SCALE PROJECT NO COMPANY'S DOCUMENT NUMBER SHEET REV


AS
SHOWN 2061(20) WELL-900-C-FOU-1015 2 OF 4 4
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

DOC. NO. REFERENCE DRAWING REV.

Detail 50 (TYP)
WELL-900-M-PSD-5075 Pipe Support Detail for Pig Launcher (18 " MLN Trunkline) -

WELL-900- C-SSU-1001 Pig LAUNCHER (L-905) - 18 " MLN Trunkline - Pipe Support Layout 4

M
D16-200

D16-200
NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
2. ALL ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE
F1 F1A 3. QUALITY OF MATERIAL SHALL BE:

D16-200

D16-200
- CONCRETE : fc' = 30 MPa (CEMENT TYPE V)
50 (TYP) 8-D16
50 (TYP) 8-D16
- LEAN CONCRETE : fc' = 14 MPa
L - REINFORCEMENT BAR : DEFORMED BAR fy = 420 MPa
VERTICAL BAR VERTICAL BAR - ANCHOR BOLT : ASTM F1553-07 GRADE 36 HOT-DIP
Ø10-150 Ø10-150 GALVANIZED
50 (TYP)

50 (TYP)
STIRRUPS STIRRUPS 4. TWO COATS OF BITUMINOUS PAINT SHALL BE APPLIED TO ALL
400

400
CONCRETE SURFACE BELOW THE GROUND
5. MINIMUM DEPTH OF FOUNDATION SHALL BE APPLIED IF CLASHING
WITH ADJACENT FOUNDATION.
Ø10-300 Ø10-300

50 (TYP)
CROSS TIES CROSS TIES
I
400 400

FOUNDATION REINFORCEMENT PLAN (TYP)


SCALE : N.T.S
H F11 S1
50 (TYP)
8-D16
50 (TYP)
1780
VERTICAL BAR
Ø10-150
VERTICAL BAR 50 (TYP)
STIRRUPS Ø10-150
50 (TYP) STIRRUPS
300
50 (TYP)

D12-200
350

Ø10-300
CROSS TIES
D12-200
G
300
350

1067

D12-200

D12-200
PEDESTAL REINFORCEMENT PLAN (TYP)
F SCALE 1 : 10

50 (TYP)
PJTN

HEAVY HEX NUT (FOR > Ø20)


2D

HEAVY HEX FLAT NUT


E
ASTM A307 FOUNDATION REINFORCEMENT PLAN (F4)
B

TOP OF GROUT. HARDENED WASHER


TOP OF CONCRETE SCALE : N.T.S
GROUT

1480
D 50 (TYP)
A

D
D12-200

D12-200
4 16/09/2022 APPROVED FOR CONSTRUCTION WBS RHA RHA

3 24/06/2022 APPROVED FOR CONSTRUCTION AHD RHA RHA

2 02/02/2022 APPROVED FOR CONSTRUCTION (As per TRA N° TRA-AR30921-005-REV2) WBS MYA MYA

D12-200

D12-200
1 21/01/2022 ISSUED FOR APPROVAL WBS MYA MYA
C 0 12/11/2021 ISSUED FOR REVIEW WBS MYA MYA
C Rev. DATE DESCRIPTION DRAFT CHK'D APPR

REVISIONS
DETAIL ANCHOR BOLT
1545

SCALE : N.T.S

TABLE:
Bolt dimension CONTRACT N° AGREEMENT N° 2061 (20)
B
Mark Bolt dia (mm) Bolt length (mm) Thread (mm) Hook length (mm)
DETAIL ENGINEERING FINALIZATION, MATERIAL PROVISION AND INSTALLATION
(M) D A PRJN B C OF PIGGING FACILITIES AT MLN FIELD BLOCK 405A
M10 10.16 125 55 35 50
50 (TYP)

M12 12.70 150 65 45 50


M16 15.88 150 75 55 50
M20 19.05 320 85 70 50
M24 25.40 420 105 85 50
A Pig LAUNCHER (L-905) -18 " MLN Trunkline
Pipe Support Foundation plan & section
FOUNDATION REINFORCEMENT PLAN (S1) Section & detail
SCALE : N.T.S
SCALE PROJECT NO COMPANY'S DOCUMENT NUMBER SHEET REV
AS
SHOWN 2061(20) WELL-900-C-FOU-1015 3 OF 4 4
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

DOC. NO. REFERENCE DRAWING REV.

Pipe Support Detail for Pig Launcher (18 " MLN Trunkline)
Section WELL-900-M-PSD-5075

WELL-900- C-SSU-1001 Pig LAUNCHER (L-905) - 18 " MLN Trunkline - Pipe Support Layout
-

NOTES :

25 THK GROUT.

25 THK GROUT.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
2. ALL ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE
3. QUALITY OF MATERIAL SHALL BE:
- CONCRETE : fc' = 30 MPa (CEMENT TYPE V)
- LEAN CONCRETE : fc' = 14 MPa

PJTN.

PJTN.
L - REINFORCEMENT BAR : DEFORMED BAR fy = 420 MPa
- ANCHOR BOLT : ASTM F1553-07 GRADE 36 HOT-DIP
ANCHOR BOLTS (TYP) ANCHOR BOLTS (TYP)
GALVANIZED
EL. +217.600 2-D14 EL. +217.600 2-D14 4. TWO COATS OF BITUMINOUS PAINT SHALL BE APPLIED TO ALL
(B.O. BASE PLATE) (CLOSED TIES) (B.O. BASE PLATE) (CLOSED TIES) CONCRETE SURFACE BELOW THE GROUND
5. MINIMUM DEPTH OF FOUNDATION SHALL BE APPLIED IF CLASHING

5050

5050
WITH ADJACENT FOUNDATION.

175

175
I

Ø10-150 Ø10-150
(STIRRUPS) (STIRRUPS)
775

775
600

600
D16 D16
(VERTICAL BAR) (VERTICAL BAR)
50

50
CONSTRUCTION JOINT CONSTRUCTION JOINT
H

1-D14 1-D14
(SIDE BAR) (SIDE BAR)
50

50
400

400
EL. +216.400 EL. +216.400
50
75

75
G

50 1-Ø10 D16-200 COMPACTED SOIL 100 1-Ø10 D16-200 COMPACTED SOIL


(HOOP) (TOP & 100 THK LEAN CONCRETE (TYP) (HOOP) (TOP & 100 THK LEAN CONCRETE
BOTT.) BOTT.)

TYP. SECTION C TYP. SECTION B


F
SCALE 1 : 10 SCALE 1 : 10
25 THK GROUT.

25 THK GROUT.
E

X
PJTN.

EL. +217.400 300 X 300


EL. +217.600
(B.O. BASE PLATE) (B.O. BASE PLATE)
Ø10-150
D
(STIRRUPS)
150 100 175

CONSTRUCTION JOINT

250
225
D12 D12-200
(TOP &
450

(VERTICAL BAR)
4 16/09/2022 APPROVED FOR CONSTRUCTION WBS RHA RHA
BOTT.)
3 24/06/2022 APPROVED FOR CONSTRUCTION AHD RHA RHA

2 02/02/2022 APPROVED FOR CONSTRUCTION (As per TRA N° TRA-AR30921-005-REV2) WBS MYA MYA
D12-200
50

(TOP & 100 D12-200 COMPACTED SOIL 1 21/01/2022 ISSUED FOR APPROVAL WBS MYA MYA

(TYP) 100 THK LEAN CONCRETE 0 12/11/2021 ISSUED FOR REVIEW WBS MYA MYA
C BOTT.) (TOP &
50 D12-200 COMPACTED SOIL BOTT.)
Rev. DATE DESCRIPTION DRAFT CHK'D APPR

REVISIONS
(TOP & 50 THK LEAN CONCRETE
BOTT.)

TYP. SECTION ACCES PLATFORM TYP. SECTION F4


SCALE 1 : 10
SCALE 1 : 10
B CONTRACT N° AGREEMENT N° 2061 (20)
DETAIL ENGINEERING FINALIZATION, MATERIAL PROVISION AND INSTALLATION
OF PIGGING FACILITIES AT MLN FIELD BLOCK 405A

A Pig LAUNCHER (L-905) -18 " MLN Trunkline


Pipe Support Foundation plan & section
Section & detail

SCALE PROJECT NO COMPANY'S DOCUMENT NUMBER SHEET REV


AS
SHOWN 2061(20) WELL-900-C-FOU-1015 4 OF 4 4
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1