Download as pdf
Download as pdf
You are on page 1of 29
Wham Contents A Irvodueton utes. Specie Lit Pian Ifornaton Crane Checks (Appointed Liting Cornatr) 1 u Document Title itPtan 3 4 5 Crane Checkist (Appointed Ling Supervisor). 6 7 8 Reference BUSHSS-F-113 Revision 03 Dato of Revi 1808118 2 2 2 3 3 Pls Assessment q 4 ‘Supporting Information. 5 Ground Condon, 5 8 Node Factors 5 10 Stoteh 1 11 iting Gear 8 12 Schedule of Lits 8 13 Closing the Li PM venom 9 14 34 Pary iting Goar Cerca, 9 15 34 Pary Crane Operator Certfeates, @ 16 Party Rigger Cotas, 9 17 94 Pany iting Supenisor Cotas 8 18. 9 Pary Crane Cecaes, 8 48 Load Chats forthe Crane, 9 20 Derating Load Charts (Fatng Equipment) ue 21 Barge StabityCalulations 8 22 Barge Dat! Free Boa en 8 23 UitPhan Calculation (Exel rnd 2 Additonal Setched information a 4 Inteoduetion ‘peor ILOT Mopne Crave Dnytgcooniner gpoed Pesan Fer Noting Corer a® Come lsiRetiteen (CHER LTD Ineotng wna te 7 05-04 -2014 Wo-00 me va 13.03.20|9 haw adr une eo of li Inet arent element gorse Cora ons Pot tewuSepens Petes es ‘sone pn ——— me ei gKg 0s.09.2610 rer oe Oe aes ‘TholtPan et be onl ra rite a ir ands age ese et treed whe ‘et res arian yb tad ng cra, ‘yep ig soda ha he sty pestis, re Degen ec ne mi ‘pt ae ta Gray wen i ig thos sista eon be aes Rett Came ng SS cant ai era Here tait paeee at —— Fae beer ur png iigRigisnonsnaine Soy emacs? Seah ‘ain ee 2 duties srl aang Define etn only he pd Lng Gti SHE 6 Te ceo kp Rn Siaictoo 2 iwi en nf Ppt 1 sepereery enact ncn Be Peed {Dione state ae eee pen St exe at Inantameaie te nes aig + seiner of tt pcs ad poe su ph, son a he oan gg erent, tn Spe aren rene bbe ue Slay ‘+ Mra nou ere re se ae te ‘et tle ig 2a sro + Mtg pae ot ne he pn a op wet + Hee te cme contin, was al segue chs, ‘fos sano snapr hc protein igre eves tng Super 1+ Rupr atte ces cas pe these an debe ey Caer + Eerie ct pope pet + Etarebal pectin telson acy tnt sy ‘est ig ps el oS 9 + State coms cielo ten cinmate nd ‘iter pena Stents + Enorfatayepvecisormmr ot pee het ‘nips + Ere titow tea caste ge sinashece + tartan gar caste havea gp ie enti nce, + Snug he pn csi ‘hea scat te tne 3 Specie Lit Plan formation Dit tn colts eta cre Twetn aa Uinimue Disthene Sorom er Mucoh PAUUGAS ee uMing abedt leo. ee 20. rae ae izal Der crane mals paneer we Fe be wach yp 4 Crane Checklist (Appointed ting Coordinator ee Sed ena rt é Semgtirycrc ev. Senora 2 aie smc esd pr Spat g eine omwrat seealageerieecemenee aaron v Seaestectoateae pore Siete omer aarraae ‘din bat mont z. (Giana po i Oa oom i Sine agnrrane8 Shearer Soorquetedetemepoccsay 7 rooartaeons Sree aren me SEIT sm eco 7 ae — Aeqaninten ig eT Stites ang evn MEM Ling _Yoiedby Npt Ling Ug Superiseright re get a 6 Risk Assessment feope etal 2c Lacthene Mobes fred Au Und (<1 oe) ate Beng ter Addateect tans te Ono soy ree eye sed Lietma oF AHU (RARTST) loon Dove S We WIT RLMIT Rook IS stein iierimneniatanttecmanin ad tonsa eer ral ih 22 sec state woe posi Coe Laem OGRE M.cuipody Uimmsuenirt) 44 pb ao 2 cmcmeants —Kihlvnd Se/ Parsons at isk tame + Ontminde + | Geet seis" Sec” a wa ae 1 Peano Suecitere ' hadae” + Toone risers + Commu nent + tte ean Deseret onus = ang HLA, iS, Gino ey at TEE Cisse, APL Sepeniene 1 cotter ‘aia opt ee iy oe tc ee temas Cee Senses amma Seemed soma ton needs Tester ope aaa an Shwe aseyee ty ies ecobearee oP sae tro fo ae aero tga ae a Soeirepesat tac oye gp Seta Hoes ‘su tetera ser tae noe pie a eit sngcteee tae oe Pretec arom $y sm ie toa eri Ice si et tari El te pet ‘cients et ‘Sen ee nt ine ‘overeat xa hh ‘ieee sale itp Me inoue becpsiottgbe tae samme leomeen pote stin ne tet ste ce Trine Ratna foe eee hy S NAA SSSS S53 VR SSS aif WN a a Supporting nfrmation maga MS- natch ‘nahoe ame ety cane Fate ok Bt ‘cscty Count ‘one coveacany Av fo -— APHIS 0 00 wepecamy — SSL sat ome — curse cansar DS L- NTey me m0 aarernn sen Seer ey esate ered Riitoceme Yes) WoO 8 round Contos Sets eee Being Ver Come GnlaeseSed 812 senauge Selene ie Vet deeiGante maa Minn eveccome 7 faina "he eta elmeted ae seer ‘re compe a) Msencomss =], o oo Sana “(Deen on oper) sae as ns hela sata Fncly Sots anism ey Set sine a a a a 10242 ood 202 ot ‘ah 0 Ties sate tata aeons nena tty 9 Mode Factors Mode Factors [Maximum load to be lifted = mede factor x SWL marked on the sing KE: N/P = Non Preferred » N/A-= Not Applicable Spee sgn [sages | tater | ae 4 10 Skate Prins eb shown onthe ove gram oi ached iors To Seon sew 0 ‘ouniseihiobs CT Seid ‘Se Waring Ras vd agg conaion ios CY ‘anes cones FO) Care boam ing | CY ata a a Core cng sob thes vit ins xg seen sires gig ho vas above sol be su, ng oss tents meted stove. + Incase of eang ao, tage ee srt cag mst te ‘hse anes oy Moment ea rang art ae dang encod he It ln, + Litpnomnten dary te somo of stay atten val bused ener: ‘Th scotland i is een esta ben bd ‘eit Maxum uit (Weep) 1-5 Fass hs igh — 3 Ground cero shl te ss wth snd capac ‘ales alfonso he ae. eta fit 11 iting ear Ling cearType SeeNs 4. hey chasm Ug ben tong SteeAbeR Bemet Sin dong” Bow SithoMLe - WEBB Stina 6M Jeng 12 Schedule of Lins Ma unt wont made 0( AWS Sacks, St Jn ou Ws wat oT oot 4 Ieenesutoe ‘writ y Coleus Code <<<~ stad youn ™ 7 (To bo led as each new lod i tite) Cortes xtsnae YN v Y Y Y oped arn Piet ‘am MwUoAS leroas [pee fprsrcs rsa fesw-bor fers eric Tor rs foes TO frrivas TREN, [anv 2 locas LEA, Leas f-Fas few fpreosrc Frcs acon [aes 18. Closing the Li Pan Appointed Liting Coordinator Day Pant ame Signatwe Date [Appointed Litng Coordinator Night Pane Name Signature ‘4 Paty Liting Gear Coteatos 15. Party Crane Operator Creates 16. 9+ Party Rigger Catcates AT Party Liting Supervisor Certeates 18. 3Pary Crane Conicates 18 Load Chas forthe Crane 20 erating Load Chars (Foating Equipment) 21, Barge Stab Calelatons 22 Barge Draft Fre Boar Updated readings for Floating Cranes _Traglasten am Teleskopausleger. 4ing capacities at telescopic boom, sorces de levage a la fléche télescopique. Sein gréBtes Lastmoment ist 402 tm. 24 ‘AdtionalSktched information 23 UttPtan Caleulation Excl) — sonar aT Deseroon ate TAS Lim Sy MAK) ste Parod 05-04-1014 Bractloesionotitt Zoe ST NIP PLT foo ‘rane Node Le sHeRR LIM Wo Sera Number: ‘Operator eon otek val Yes/No bate of Expy boxy 7 Dats of the Toad Weigh ofthe loa ew \500. peter osesun sg senna 4a © mansions fhe load th unto rome | SeseaRSeSar coc = aac "oe emt niet — Pamecm meret ie Soyer ee cers Neeewt = comma tt = maim es ‘wen spans Samar crea | weston ties 7 Ground Canaan Poze wit cane ee S354 ‘i apenas eee = oe ze = ent nr rs cre nt warms (Ex n) GERLABA 1,610 z com —F Tits Accossonee ‘akira’ copay Weta) Ory Test we ade de Na As Pas decker WIT 300 ae eo wWbam Contents A Iniroduetion Dulin. Document Tite Lun Pian Speci Lit Plan Information, Reference BNSHSS-F113 Crane Checkist Appointed iting Coorinata)..9 Revision e 1 2 3 ‘ Date of Revision 1610618 5 Crare Checist (poi Lg Suprise. 3 8 7 8 Fisk Assessment Supposing Informatio, Ground Conitons. 8 Mode Factors, 10 Sketch 11 Ling Gear 12 Schedule of ut 48. Closing the Lit Pan 16 96Party Ling Gear Cetfiates 18. 94 Parly Cane Operator Cerficaes, 16 94 Party Rigger Ceticates 17 96Pory iting Supenisoe Cartas. 18 94 Pary Crane Certtctes. 18 Load Chart for the Crane. 20 erating Load Chats (Festing Equant) 21 Barge Stabity Calculations... 22 Barge Dra Free Board 23 LitPlanCelelaton (Exel fi 4 2A Adonal Stetced Ifo se nnnna 4 Ineosuetion ‘peter - 1 VLoT Mopne CRG Dayiingceetnrgpons ane Tae Neg ote ma reajnancins icvle RR WHA cote hd a, 05-09 -2014 \o00 nm van 13.63.2019 a andro or of ile ‘teconenaeqarers leant peed ig ‘a one Pe tr peice ‘nampa Ling Sperm aria: OW Os 08.2019 og f hn epee te sn xt _ ae Denese rematent athe smeteareatea tame eae ecaern Semtasemi tients ‘Te my bra we act pale ets ‘pte vey ta Gey, ett i Foe Tsk atten espe goa lac iotaod = on a aoe i a, a) Cuomo mig a6 _~ Speier ah svete fs hovers see ce vansnaieg Pesaran apse noninains Seema Stride 2 Dates apo Peon ring Petco. etn me can Spi ing lors Beech Te coe ote pr Pee Senta Freesat ne Pr 1 Ave vy oceans elon Prt ‘Geum wiser 2 ee or gma on eee Bat ‘toed ae pce ra ig, + see ft tig pts a pes mem pga sei ae hg gta cot on ‘ten see ota bs ete ey + et a ase ees se eo be ‘ot an ing + Mr i pee Se pe pn + FE Sa we care ton case fat seit ts ‘tet mahi hazmat in bs ce ‘robe nine apei Ling Ses + meet caenyerey Someta ee * eboney me seal + Eu tears et panei cmc nt ‘ret nen reo ws + Ewe a cc est pn rch ‘ages. + Eases tirana rae ssp te cam + Htae at atitig grant ocsscr ae a ed it pat ores pac. + Entei ar ated cargo tpn se onmneeete ‘oAP cede oe. Specie Lit Plan Iforation Dit an compas ot Tyetunpn-cetens — toe ae) heater CrecalunPin——_cntitananit (Giessen Sree ee apy te at ety etn ae = 1 Es i Menimun dishene Sompecttyoar LUGAR e lure Hee balding ols. ie 09 20m coma a Iuxh2e crane enaks ee we bo be w yp 4 Crane Checklist (Appointed Liting Coordinator) 5 Crane Checklist (Appointed Lifting Supervisor) aie ston reno é ia i ~ a Ce Seay aw ee sree Sei poantar on tersbomeie — Leet te ne a iansaee So Bees Rerltctiyocmiimensiay Sant : eames. Ear entemeang reat cree ae a Sierucaie : eum ~~ =e a cms - 7 Se omen Saree remcee ecm” | ean oncom 7 Sai mie 7 ‘Rad checked piu ard set oe ots eam nn) ol Gi ‘rshut a len eS CT raweem Ciges, AP Lil Sapenicon 6 Risk Assessment harti-wwralremenad Some Time reel Lecthene Mebjccmonk” Mtn/Comaueenes tegen betsy or wets Se) aie tenes. ryt then ny Eee crane, v Lietmda ef AWY (MERLET) fren Seeing eS WR oF 1S God) ee es Erb omaha coe iis yi ey ‘Sel ney crea ap ao ey. ogra yep mo 1 Vv, vy Woaiebia neat netasssece bends RS v Acad Ce eine ase sifondiamalon ssh 88 (elven anise tee emai seth ocny cea sngry mang rca pp Sor tor an ae at ase Vv = airs Seeerereeatinttrennes 7 Sioa Exiatscretin penne Gwatpere (/ — SEE iaetarmecein ( {rs ona Micuepoay v wren QA spi= fermnmttrmaterennenveen / eae ean Skemasernsmmers omeommeroh FS cecum y 0 —Kelend Sr6//, TNC a taeen vets Persona tRIbK — eacampatbintonatsteinan tent / alma, Omeig tne «Temata RAK Tenet ce Mee «eee 2 et NEEM S. Riteeioy } Somme Bee Bas Steams * Since"? fn Son oa Emeteseccreremnce | eee seacen eeaanmns : eww Santoro WN Supporting ntrmation mangace™ MS: camacay An par ee cmt TERETE a0 oo vontoacomn — GL (ipcty—Auiny Seka: —_—— connagas Conmmnronnte OSL co a ay HE CD Day carp dest ate cob Fonarhtins SS Saipan Wey ete dr rence tas srororcurttstocon Yes) WoC soonest Fo ge be © Ground Conditions Sole used Bing Yas omatonlscmesed B22 wea we Sean me sSmane Sateen site ouomeotentee Cae weer mi corp nt o smonmsd = it ee OD wz ‘ommaoage dines) 0 Yoyomensicon ad MES oat2 wee a som o fe mci o 78 ‘Sot Clays and St a vee ‘Very Salt Cay a = cr} >aotiea io mame 00-00) = nt alton (ain Vl ne of La 9 ode Factors 10: Skoteh Se L eho von ahve in iad) | Goa cago TS bo a | | Toate oa et : | las ctw tenia. ee Co sis a Tsu Carowaiiobe CT Cage same ae cmcecortnon ea OW) | Maram vegty 8° nan i Rod Oreo SE ‘ia eng a ian a ound conaens eis ath conc apc ‘ale eatlfnr posses tr bo ae Note Coren rang shows beaches Aviat mut coneng - - ‘Settes Fersoelitsgig h tes sboesou be ue, eta oft; Ug ears teste mented stom, ‘eat etng an, age to boar eadng matte ‘hosod areca yen aa terge mate Duty ant ars er agree med ihe pr + Litpan nent dey wich cea ob tail eatin vilbeuse, 11 Liting Gor ting GserType SNe 4. Sag dun Sh bon ong SteetbeR Beat ser dong Pow SimuuLE . WEeB Stina bM Jeng 12 Schedule ofits Ps ute woe ade ot AAS Saks 1S Dm ou sm caowcoteerm cet, W3t Y ie wat Y Y W087 y Y bot Y Y Vengo Suublo gaunt Apsite Pesn at “= “ake won ey Miwulsas (Tobe ied as each new fod ite) [ase per era. [sti Tor es feos [semcpor fri TOR MS ferwcsor prs — foes RTOS SFROOEL TAENO, aes RC 13. Closing the Lit Plan Appointed Liting Coordinator Day ent Name Signatre Date ‘Appointed Liting Coordinator Night ane Name Signatre Date 14 Panty iting Gaur Cetestes 15. 9Pary Grane Operator Crates 18 Party Rigger Conestas 1734 ary Ling Supervisor Certificates 18 3 Pary Crane Centcates 19 Load Chas forthe Crane 20 erating Load Charts oating Eauipment) a 21 Barg Sait Calculations 9 Dra Free Boars ~Upéated reatngs for Festing Cranes , Traglasten am Teleskopausleger. 4ing capacities at telescopic boom, rorces de levage la fléche télescopique. Sein gréBtes Lastmoment ist 402 tm. 24 Additional Sktched information 23 LitPtanCaleulation Excl le) c Tr cere a Destin eTmeRE TAU Lirtinig (ST maxX) Dat Pero 05-04-1014 Bactlomion tM: Zoi, S To NP PumT Roof (5 Cotes) Crane od DebReRR” Lim WTo ‘en nob ‘Operators Crane inspection sickervalés Yes/No __Oatoot pi oauery Dalal of the Toad Wlghtertelesss twine \300 s eran rg cs 4als 8 Gros fad te 2% Prresionsortetosd am tw Ss Potent ancy ei Datals of rane feecntgespe opacity ‘hemes ST ees “oe ‘Code Soom eh nit az ‘i Priblng eiresern, NA nom mowed ew Bee sees rect a a cave et wat ‘oes xn 32 sen emanate ees S660 og snes attr esetweohoftecane | ils Accossories Desig cearhers—apacty "Wit he) Osonty Yo wee a Alas heen ha, Wor set ews coe. Ben MAT 30 Tot # ec

You might also like