Schedule Samyang
Schedule Samyang
‐ CURVE
PROJECT : SAMYANG
SCOPE OF WORK : INTERIOR, FURNITURE, MEP
LOCATION : WORLD TRADE CENTER 5
MEI JUNI
No. Description
BOBOT 19‐25 26‐2 3‐9 10‐16 17‐23 24‐30
A INTERIOR
I PRELIMINARIES :
1 Preminaris & Protect Area 0,22 0,04 0,04 0,04 0,04 0,04 0,04
2 Cleaning 0,66 0,11 0,11 0,11 0,11 0,11 0,11
3 Removal Debris 0,35 0,07 0,07 0,07 0,07 0,07
4 Insurance 1,55 0,26 0,26 0,26 0,26 0,26 0,26
II WALL FINISHES :
1 Full Height Double Gypsum Partition 4,08 2,04 2,04
2 Full Height Single Gypsum Partition 2,28 1,14 1,14
3 Glass Partition 3,34 1,67 1,67
4 Cornice 0,81 0,41 0,41
5 Wooden Skriting 0,98 0,98
6 Paint / Accent Finish 1,88 0,94 0,94
7 Wall Treatment 0,37 0,19 0,19
8 Roller Blind 1,17 1,17
9 Sticker Sandblast Blok H : 150 1,13 1,13
10 Digital Printing 0,79 0,79
11 Moveable (Finish Padded Wall) 3,73 0,93 0,93 0,93 0,93
12 Background Reception + Logo 1,73 1,73
III FLOOR :
1 Homogeneus Tile 0,49 0,49
2 Carpet Tile 3,08 3,08
3 Vinyl with Self Leveling Uzin 2,40 2,40
4 List Ending / Inlay Stanless 0,66 0,66
IV PLAFOND :
1 Flat Ceiling Gypsum 0,98 0,49 0,49
2 Drop Gypsum Ceiling 0,45 0,22 0,22 81,06
3 Gutter 0,76 0,76
4 Accoustic
6 Acrilyc with Indirect Lamp 1,75 1,75
7 Open Ceiling / Expose (Retouch & Repaint) 0,98 0,25 0,25 0,25 0,25
8 Paint 0,36 0,18 0,18
V DOORS :
1 Swing Glass Door 2,44 1,22 1,22
2 Swing Wooden Door 0,62 0,62
3 Camuflase Wooden Door 0,31 0,31
4 Handle Stainless Steel 0,44 0,44
5 Hinges + Lock + Handle 0,20 0,20
FURNITURE
I RECEPTION AREA :
1 Reception Table 0,77 0,77
2 Sofa Table 0,22 0,22
3 Arm Chair 0,62 0,62
II MEETING ROOM :
1 Meeting Table 1,43 1,43
2 Glassboard 1,72 1,72
III GENERAL AREA :
1 Workstation Fabric 4,25 4,25
‐ Top Table
= 8 persons
2 Workstation Fabric 2,39 2,39
‐ Top Table
= 9 persons
3 Working Table 0,62 0,62
4 Cubicle Partition 4,43 4,43
59,41
5 Dealing Table 0,44 0,44
6 Crendeza with Planters 1,33 1,33
7 Credenza for Utility 0,32 0,32
8 Hanging Cabinet for Utility 0,62 0,31 0,31
9 High Cabinet 2,78 1,39 1,39
IV DRY PANTRY :
1 Low Cabinet 0,30 0,15 0,15
2 Hanging Cabinet 0,42 0,21 0,21
3 Back Splash 0,13 0,07 0,07
4 Minibar Table with Artificial Plant 0,90 0,45 0,45
5 High Cabinet 0,99 0,50 0,50
V STORAGE ROOM :
1 High Cabinet 1,19 0,60 0,60
2 High Cabinet 1,29 0,64 0,64
ME WORKS
ELECTRICAL
Lighting Services
1 Relocated Lighting Existing 0,13 0,04 0,04 0,04
3 Supply and Install Linear Lamp W : 120 mm 0,68 0,68
Supply and Install DownLight LED 12 Watt outbow 0,58 0,58
4 Supply and Install Downlight LED Slimpanel 10 Watt inbow 0,28 0,28
6 Supply and Install Pendant Lamp 0,27 0,27
7 Supply and Install LED Strip 1,66 1,66
8 Supply and Install Emergency Lamp 0,29 0,29
9 Supply and Install Exit Lamp 0,02 0,02
10 Supply and Install Switch 1 gang 0,05 0,05
11 Supply and Install Switch 2 gang 0,03 0,03
14 Wiring for lighting installation c/w cable NYM 3x2.5mm in conduit pipe 2,42 1,21 1,21
15 Regrouping Lighting 0,18 0,09 0,09
Power Outlet
14 Supply and Install power outlet 2 pin 1 gang 16A 0,10 0,10
15 Supply and Install power outlet 2 pin 2 gang 16A 0,43 0,43
16 Supply and Install power outlet ceiling 2 pin 1 gang 16A 0,03 0,03
19 Wiring for power outlet installation c/w cable NYM 3x2.5mm in conduit pipe 1,25 0,42 0,42 0,42
Distribution Board
20 Supply and Install New MDB Samyang 1,83 1,83
Cable Feeder c/w Trunking 31,55
25 Supply and install cable feeder from P‐KWH Avant Garde Panel to MDB Samyang
c/w NYY 4 x 16 mm + NYA 10 mm 0,85 0,85
29 Supply and install cable Tray 300x100mm c/w cover tray, elbow, joint and support 0,53 0,53
AIR CONDITIONING SYSTEM
30 Relocated Diffuser Existing 0,29 0,14 0,14
31 Supply and install SAG 1200 x 100 mm powder coating c/w plenum box 1,46 0,73 0,73
32 Supply and install RAG 1200 x 100 mm powder coating c/w plenum box 1,46 0,73 0,73
33 Supply and Install Spigot dia.8 " 0,18 0,18
34 Supply and Install Flexible Duct 8" 0,54 0,54
35 Supply and Install Transfer Duct 0,43 0,43
FIRE FIGHTING & ALARM SYSTEM
41 Supply and Install Sprinkler Head 0,49 0,49
42 Relocated Sprinkler Head 0,74 0,74
43 Drain Sprinkler 0,31 0,31
45 Supply and Install hallotron 5Kg 0,84 0,84
46 Supply and Install Ceilling Speaker 0,36 0,36
47 Relocated Ceiling Speaker 0,12 0,12
48 Supply and Install Smoke Detector 0,77 0,77
49 Relocated Smoke Detector 0,23 0,23
50 Wiring for power Smoke Detector c/w cable FRC 2x1.5mm in conduit pipe 0,23 0,23
51 Re programming MCFA 0,71 0,71
DATA VOICE
52 Supply and install Data Outlet 3,21 1,07 1,07 1,07
incl. wiring UTP cable cat 6 in conduit pipe, RJ 45 and Patchcord for area and rack 13,16
Data modular outlet and faceplate
53 Supply and install HDMI 4K 15 meter 0,29 0,29
54 Supply and install HDMI Outlet 0,08 0,08
55 Supply and install cable Tray 300x100mm c/w cover tray, elbow, joint and support 0,53 0,27 0,27
56 Supply and install Cable Duct (for HDMI maintenance), incl. UNP 50 mm 0,16 0,16
Security Access 8,53
62 Supply and Install Access Door 0,75 0,75
64 Supply and Install wiring installation Security Access 0,09 0,09
65 Testing and Commisioning 0,71 0,71
66 Documentation, Shop Drawing and Asbuilt Drawing 0,62 0,62
D CHAIRS ( Oscar / Fabric ) :
4,65
1 Reception Chair 0,08 0,08
2 Meeting Chair 1,53 1,53
3 Supervisor Chair 0,22 0,22
4 Staff Chair 1,95 1,95
5 Dealing Chair 0,47 0,47
6 Barstool 0,37 0,37
0
100,00
PROGRESS PLANNING 4,65 8,52 18,39 27,86 21,65 18,94
COMMULATIVE PROGRESS PLANNING 0 4,65 13,16 31,55 59,41 81,06 100,00
PROGRESS ACTUAL 8,53
COMMULATIVE PROGRESS ACTUAL 0 8,53
DEVIATION 3,88