Activities

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

Group Content Learning Competencies Code

1 Introduction 1. Explain basic concepts No Code


1. Basic concepts in in electrical installation
electrical installation and maintenance 2.
and maintenance Discuss the relevance of
2. Relevance of the the course 3. Explore
course career opportunities in
3. Career opportunities electrical installation and
maintenance
2 1. Assessment of LO 1. Recognize Personal TLE_PECS9-12-I0-1
Personal Competencies Entrepreneurial
and Skills (PeCS) vis-à- Competencies and Skills
vis PeCS of a practicing (PeCS) needed in
entrepreneur/ electrical installation and
employee in maintenance
locality/town. 1.1 Assess one’s PeCS:
1.1 Characteristics characteristics, attributes,
1.2 Attributes lifestyle, skills, traits
1.3 Lifestyle 1.4 Assess practitioner’s
1.4 Skills PeCS: characteristics,
1.5 Traits attributes, lifestyle, skills,
2. Analysis of PeCS traits
compared to PeCS of a 1.5 Compare one’s PeCS
practitioner with those of a
3. Align, strengthen and practitioner/entrepreneur
develop one’s PeCS 1.6 Align one’s PeCS with
based on the results those of a
practitioner/entrepreneur
3 Market (Town) LO 1. Recognize and TLE_EM9-12-I0-1
1. Key concepts of understand the market in
Environment and electrical installation and
Market maintenance 1.1 Identify
2. Players in the Market the players/ competitors
(Competitors) within the town 1.2
3. Products & services Identify the different
available in the market products/services
available in the market
4 Market (Customer) LO 2. Recognize the TLE_EM9-12-II0-2
4. Key concepts in potential
Identifying and customer/market in
Understanding the electrical installation and
Consumer maintenance 2.1 Identify
5. Consumer Analysis the profile of potential
through: customers 2.2 Identify the
5.1 Observation customer’s needs and
5.2 Interviews wants through consumer
5.3 Focus group analysis 2.3 Conduct
discussion consumer/market
5.4 Survey analysis

5 6. Generating Business LO 3. Create new business TLE_EM9-12-III0- IV0-


Ideas ideas for the electrical 3
6.1 Key concepts in installation and
Generating Business maintenance business by
Ideas using various techniques
6.2 Knowledge & Skills, 3.1 Explore ways of
Passions, Interests generating business ideas
6.3 New application from ones’ own
6.4 Irritants characteristics/attributes
6.5 Striking ideas (new 3.2 Generate business
concept) ideas using product
6.6 Serendipity Walk innovation from irritants,
trends and emerging
needs 3.3 Generate
business ideas using
Serendipity Walk
6 1. Standard application LO 1. Select electric and TLE_IAEI9-12ET-Iae-1
of electric and hydraulic hydraulic tools
tools 1.1 Request tools,
2. Types of electrical equipment and materials
tools, instruments, 1.2 Identify electric and
materials and their hydraulic tools for the
specifications task
3. Hand tools 1.3 Inspect tools and
4. Proper maintenance equipment for damage
of electric and hydraulic prior to its use
tools 1.4 Report damaged tools

7 5. Specification of LO 2. Maintain electric TLE_IAEI9-12ET-Ifj-2


electric and hydraulic and hydraulic tools
tools 2.1 Check the conditions
6. Electric and hydraulic of electric and hydraulic
tools safety practices tools
7. Electrical symbols 2.2 Lubricate electric
used in electrical plan tools in line with
manufacturer’s
specification
2.3 Replace auxiliary part
of electric and hydraulic
tools according to
manufacturer’s
specifications
2.4 Store electric and
hydraulic tools
8 1. PEC provisions on LO 1. Install electrical TLE_IAEI9-12RCIIa-j-1
electrical metallic metallic tubing
conduits 1.1 Prepare
2. Bending electrical tools/equipment and
metallic conduit materials needed for the
3. Procedure in installation of electrical
installing electrical metallic tubing in line
metallic conduit with job requirements
4. Safety procedure in 1.2 Install electrical
installing electrical metallic tubing according
metallic conduits to the job requirements
following PEC and NEC
1.3 Observe safety
procedure in installing
electrical metallic tubing
1.4 According to OHS
guidelines and
procedures
9 5. PEC/NEC provisions LO 2. Install wireways and TLE_IAEI9-12RCIIIa-j-2
on wire ways and cable cable trays
trays 2.1 Prepare
6. Procedure in tools/equipment and
installing wire ways and materials needed for the
cable trays installation of wire ways
7. Safety procedure in and cable trays in line
installing wire ways and with job requirements
cable trays 2.2 Install wire ways and
cable trays according to
the job requirements
following PEC and NEC
2.3 Observe safety
procedure in installing
wire ways and cable trays
according to OHS
guidelines and
procedures
10 8. PEC/NEC provisions LO 3. Install telephone TLE_IAEI9-12RCIVa-e-
on telephone terminal terminal cabinet 3
cabinet 3.1 Prepare
9. Procedure in tools/equipment and
installing telephone materials needed for the
terminal cabinet trays installation of telephone
10. Safety procedure in terminal cabinet in line
installing telephone with job requirement.
terminal cabinet 3.2 Install telephone
terminal cabinet
according to the job
requirements following
PEC and NEC
3.3 Observe safety
procedure in installing
telephone terminal
cabinet according to OHS
guidelines and
procedures
11 11. PEC provisions on LO 4. Install cable bridge TLE_IAEI9-12RCIVf-j-4
cable bridge 4.1 Prepare
12. Procedure in tools/equipment and
installing cable bridge materials needed for the
13. Safety procedure in installation of cable
installing cable bridge bridge in line with job
requirements
4.2 Install cable bridge
according to the job
requirements following
PEC and NEC
4.3 Observe safety
procedure in installing
cable bridge according to
OHS guidelines and
procedures
12 1. Product Development LO 1. Develop a product/ TLE_EM10-I0-II0-1
2. Key concepts in service in electrical
developing a product installation and
3. Finding Value maintenance
4. Innovation 1.1 Identify what is of
4.1 Unique Selling “Value” to the customer
Proposition (USP) 1.2 Identify the customer
1.3 Explain what makes a
product unique and
competitive
1.4 Apply creative and
innovative techniques to
develop marketable
product
1.5 Employ a Unique
Selling Proposition (USP)
to the product/service
13 5. Selecting a Business LO 2. Select a business TLE_EM10-III0-2
Idea idea based on the criteria
6. Key concepts in and techniques set
Selecting a Business 2.1 Enumerate various
Idea criteria and steps in
6.1 Criteria selecting a business idea
6.2 Techniques 2.2 Apply the
criteria/steps in selecting
a viable business idea
2.3 Determine a business
idea based on the
criteria/techniques set
14 7. Branding LO 3. Develop a brand for TLE_EM10-IV0-3
the product
7.1 Identify the benefits
of having a good brand
7.2 Enumerate
recognizable brands in
the town/province
7.3 Enumerate the
criteria for developing a
brand
7.4 Generate a clear
appealing product brand
15 1. Standard application LO 1. Select the wiring TLE_IAEI10WD-IaIIj-1
of tools, materials and devices used for floor and
equipment in ground fault current
accordance with PEC interrupter
(Philippine Electrical 1.1 Interpret
Code) /NEMA plan/drawings for the
2. (National Electrical selection of wiring
Manufacturers devices based on the job
Association) requirement
3. Safety procedure for 1.2 Identify the correct
handling electrical quantity of wiring
materials and devices materials and devices to
4. Specifications of be used based on job
electrical supplies and requirement
materials 1.3 Select tools and
equipment to be used
based on job requirement
1.4 Select appropriate
Personal Protection
Equipment (PPE)
16 5. Standard application LO 2. Install the wiring TLE_IAEI10WDIIIa-IVj-
of tools, materials and devices for floor and 2
equipment in ground fault current
accordance with interrupter based on PEC
PEC/NEMA standards
6. Basic methods and 2.1 Interpret
requirements for the plan/drawings based on
installation the job requirement
7. Specifications of 2.2 Install the wiring
electrical supplies and devices for floor and
materials ground fault current
interrupter in accordance
with PEC
2.3 Observe safety
procedure in installing the
wiring devices for floor
and ground fault current
interrupter in accordance
with OHS procedures
17 1. Electrical materials LO 1. Prepare electrical TLE_IAEI7/8UT-0a1
and tools materials and tools for
2. Different types of the task
forms 1.1 Prepare a list of
electrical tools and
materials for a specific job

LO 2. Request appropriate
electrical supplies TLE_IAEI7/8UT-0a2
materials and tools
applicable to a specific
job
2.1 Use the appropriate
form in requesting for
electrical tools, supplies
and materials for a
specific job

LO 3. Receive and inspect


electrical supplies, TLE_IAEI7/8MT-0b3
materials and tools
3.1 Check and control
received items on the list
18 1. Measurement LO 1. Select electrical TLE_IAEI7/8MC-0c1
2. Ohm’s Law measuring tools and
3. Multitester instruments
1.1 Identify object or
component to be
measured
1.2 Choose test
instruments to be used
for specific tasks
1.3 Identify alternative
measuring tools without
sacrificing cost and
quality of work

LO 2. Carry out
measurements and
calculations TLE_IAEI7/8MC-0d2
2.1 Use appropriate
measuring devices for
specific tasks
2.2 Compute for required
data
2.3 Convert data to its
equivalent unit of
measurement
19 1. Basic technical LO 1. Analyze signs, TLE_IAEI7/8ID-0e-1
drawing electrical symbols and
2. Technical Plans and data
Schematic Diagram 1.1 Read and interpret
3. Signs, Symbols and electrical signs, symbols
Abbreviations and data
1.2 Analyze electrical
components and
materials based on
electrical signs, symbols
and data

LO 2. Interpret technical TLE_IAEI7/8ID-0e-2


drawings and plans
2.1 Read blueprints of
electrical plans, diagrams
and circuits
2.2 Identify necessary
tools, materials and
equipment according to
blueprints of electrical
plans, diagrams and
circuits
20 1. Electrical tools and LO 1. Check condition of TLE_IAEI7/8MT-0f1
equipment tools and equipment
2. Maintenance of tools 1.1 Label functional and
and equipment nonfunctional tools and
equipment

LO 2. Perform basic TLE_IAEI7/8MT-0f2


maintenance
2.1 Clean and lubricate
tools
2.2 Observe periodic
preventive and
maintenance of electrical
tools and equipment
2.2.1 Sharpening
2.2.2 Oiling
2.2.3 Insulating

LO 3. Store tools and


equipment TLE_IAEI7/8MT-0g3
3.1 Prepare inventory of
tools and equipment
3.2 Store tools and
equipment in their proper
places
21 1. Occupational health 1. Occupational health TLE_IAEI7/8OS-0h1
and safety procedures and safety procedures

LO2. Control hazards and TLE_IAEI7/8OS-0i-2


risks
2.1 Determine effects of
hazards and risks
2.2 Evaluate hazards and
risks
2.3 Follow procedure for
controlling hazards and
risks in the workplace

LO3. Practice OHSP TLE_IAEI7/8OS-0j-3


Instruction:

1. Make a presentation based on the following Topics assigned.


2. The presentation must attain the following criteria.
3. Used an application based on your mastered or known application.
4. The presentation must be based on the DLP structure.

You might also like