31-12-21

Mass Global For Investment OPERATION DAILY REPORT Erbil Gas Power Station EGPS-OP-2022- 154
M D Y

Date : 6-3-2022 From 0:00:00 to 23:59:59 SITE Erbil Gas Power Station
1 - Operation Shifts
Total
Shift Time Over Time Shift Time Over Time Total Hours
Day Shift C Full Name (hours) (hours)
Hours Per
Shift
Night Shift A Full Name (hours) (hours) Per Shift

Shift Charge Engineer Nyaz Abdulrazaq 12 0 12 Shift Charge Engineer Hawkar Fatih 12 0 12
CCR Operator Engineer Ahmad Ibrahim 12 0 12 CCR Operator Engineer Diyari Shakir 12 0 12
SSV Site super visor Hawta Arif 12 0 12 SSV Site super visor Mahmood Adnan 12 0 12
CCR Block-1 board operator Diyar Abdulrahmn 12 0 12 CCR Block-1 board operator Mawlud Zrar 12 0 12
CCR Block-2 board operator Wajdi Balen 12 0 12 CCR Block-2 board operator Rizgar Ali 12 0 12
Field Operator Simple Cycle Yousf Muhammed 12 0 12 Field Operator Simple Cycle Karwan Adil 12 0 12
Field Operator Simple Cycle Amanj Siddeeq 12 0 12 Field Operator Simple Cycle Peshraw Abdulqadir 12 0 12
Field Operator Simple Cycle Mohammed Ghafur 12 0 12 Field Operator Simple Cycle Dashti Khalid 12 0 12
Field Operator Simple Cycle Field Operator Simple Cycle
Field Operator CCPP Rekan Amjad 12 0 12 Field Operator CCPP
Field Operator CCPP Aso Rasheed 12 0 12 Field Operator CCPP Sarsang Sabir 12 0 12
Field Operator CCPP Brwa Abdulahad 12 0 12 Field Operator CCPP Hawkar Mohammad 12 0 12
Field Operator CCPP Field Operator CCPP Mahmood Jabar 12 0 12
Field Operator SG Rahman Ali 12 0 12 Field Operator SG Barham Ahmed 12 0 12
Field Operator Chemical Bryar Zrar 12 0 12 Field Operator Chemical Rawaz Abdulkarim 12 0 12
Field Operator Chemical Farman Burhan 12 0 12 Field Operator Chemical Sarkawt Izzatddin 12 0 12
Field Operator FOT Bahoz Tahsin 12 0 12 Field Operator FOT Essa Abdulkarim 12 0 12

2 - Gas Turbines Data


Fired Hours Liquid Fuel plus Fired Hours Gas Fuel plus Mix FFH from last Date of L/O filter
Fired Hours Fired Starts Emergency Trips Real fired Hrs MIX Real fired hrs GAS Real fired Hrs LIQUID Last Date Run On Liq. Fuel Last Water Wash
Mix (HMI) (HMI) inspection changed (from - to )
GT 1 (890137) 90918.3 544 31042.2 64478.8 192 4603 59876 26440 4878.00 Tuesday, July 5, 2016 Dec.2021 (W to E) 22-Jul-2020
GT 2 (890139) 96027.59 422 18966 80818.7 133 3757 77062 15208.89 8605.39 Thursday, January 21, 2016 Dec.2021 (W to E) 4-Dec-2021
GT 3 (890140) 107183.4 402 12384.3 97547 106 2748 94799 9636.4 13562.60 Thursday, March 5, 2015 Nov.2021 (E to W) 23-Nov-2021
GT 4 (890141) 103296.7 454 14772.4 91041.5 201 2517 88524 12255.2 13397 Monday, July 24, 2017 Jan.2020 (W to E) 17-Jun-2021
GT 5 (890270) 87529.5 268 4785.2 84308.09 109 1564 82744 3221 12309.50 Monday, July 24, 2017 Oct.2021 (S to N) 1-Dec-2020
GT 6 (890271) 78581 246 1758.4 77495.8 79 673 76823 1085.2 12137.50 Friday, May 6, 2016 March.2021 (S to N) 17-Nov-2020
GT 7 (890272) 82199.59 340 8135.4 79122.09 118 5058 74064 3077.5 6314.19 Friday, May 6, 2016 Jul 2021 (N to S) 12-Sep-2021
GT 8 (890276) 76699.59 289 13356.1 66935.5 109 3592 63343 9764 11298.49 Friday, May 6, 2016 Nov 2021 (N to S) 21-Mar-2022

3 - Steam Turbines Data


Number of HP Running HRS from last Condensate Pumps Running Hours
STG Running Hours Last Maintenance on STG Date Last Date ACC Fins Cleaned
Starts Maintenance
Block #1 Block #2

STG #1 51126.08 154 Pump #1 Pump #2 Pump #1 Pump #2

STG #2 53039.78 144 27714 27108 27813 27801

27714 27108 27813 27801

4 - HRSG Data & Boiler Feed Water Pump Data


Boiler Feed Water Pump Run HRSG Boiler Feed Water Pump Run HRS. from Last Insp.
HRSG Total Fired HRSG Fired Hours HRSG Fired Hours
Last Date HRSG Cleaned
Hours On Gas Fuel On Liquid Fuel Pump #1 Pump #2 Pump #3 Pump #1 Pump #2 Pump #3

HRSG #1 22123.21 1318.85


16577 15782 15924 16577 15782 15924
HRSG #2 20191.07 949.73
HRSG #3 39406.01 73.5
25256 25415 24876 25256 25415 24876
HRSG #4 38386.01 754.89
HRSG #5 43462.33 874.44
27225 28033 28850 27225 28033 28850
HRSG #6 35407.44 303.19
HRSG #7 38570.2 762.73
25814 27739 26200 25814 27739 26200
HRSG #8 38545.87 9411
31-12-21

Mass Global For Investment OPERATION DAILY REPORT Erbil Gas Power Station EGPS-OP-2022- 154
M D Y

Date : 6-3-2022 From 0:00:00 to 23:59:59 SITE Erbil Gas Power Station
5 - Daily Fuel Consumption
Daily
6:00 a.m
00:00 h 01:00 h 02:00 h 03:00 h 04:00 h
Yesterday
6:00 AM Today 07:00 h 08:00 h 09:00 h 10:00 h 11:00 h 12:00 h 13:00 h 14:00 h 15:00 h 16:00 h 17:00 h 18:00 h 19:00 h 20:00 h 21:00 h 22:00 h 23:00 h 24:00 h Total by
GT
5 Gas 1212133553 1212133553 1212133553 1212133553 1212133553 1212133553 1212133553 1212133553 -
GT 1 (890137)
Liquid 0 0 0 0 0 0 0 0 -
Gas 1726818264 1726695756 1726919870 1726919870 1726919870 1726919870 1727223760 1727320374 23.85
GT 2 (890139)
Liquid 0 0 0 0 0 0 0 0 -
Gas 2093903251 2093903251 2093903251 2093903251 2093903251 2093903251 2093903251 2093903251 -
GT 3 (890140)
Liquid 0 0 0 0 0 0 0 0 -
Gas 1921601793 1921272007 1921747874 1921795948 1921887568 1921887568 1922084394 1922181936 27.56
GT 4 (890141)
Liquid 0 0 0 0 0 0 0 0 -
Gas 2031339489 2030909839 2031489983 2031538986 2031633973 2031633973 2031835328 2031935890 28.33
GT 5 (890270)
Liquid 113252435 113252435 113252435 113252435 113252435 113252435 113252435 113252435 -
Gas 1817748674 1817329127 1817748674 1817748674 1817748674 1817748674 1817748674 1817748674 -
GT 6 (890271)
Liquid 39977534 39977534 39977534 39977534 39977534 39977534 39977534 39977534 -
Gas 1763877427 1763455092 1764026643 1764075994 1764170401 1764170401 1764372685 1764472898 28.29
GT 7 (890272)
Liquid 159745346 159745346 159745346 159745346 159745346 159745346 159745346 159745346 -
Gas 1480581487 1480230452 1480733491 1480783307 1480879455 1480879455 1481052361 1481152573 27.13
GT 8 (890276)
Liquid 343397371 343397371 343397371 343397371 343397371 343397371 343397371 343397371 -
14048703339 Total Daily Gas Fuel Consumption per MMScf 135.1510 MMScf
Total Liquid Fuel Consumption 0.00 M³
Natural Gas Specific Gravity 0.6193 Total Daily Gas Fuel Consumption per KG 14050849149 KG
9443.00 K.Cal/NM3
Natural Gas Low Heat Value
39535.95 Kj/m3

6 - Liquid Fuel Treatment and Storage Tanks


Total Untreated Fuel Daily Treated Fuel
Untreated Tanks 06:00 h 07:00 h 18:00 h 00:00 h
Available (liters)
Separator A Separator B Separator C Separator D Separator E Separator F
Production
Tank 2 ( meters) 0 0 0 0 - From 00:00 h to 06:00 h 0.00 0.00 0.00 0.00 0.00 0.00

Tank 5 ( meters) 0 0 0 0 - From 06:00 h to 18:00 h 0.00 0.00 0.00 0.00 0.00 0.00

Tank 6 (meters) 0 0 0 0 - From 18:00 h to 00:00 h 0.00 0.00 0.00 0.00 0.00 0.00
Total Daily Treated Fuel
0.00 M³
Production
Total Treated Fuel Available
Treated Tanks 06:00 h 07:00 h 18:00 h 00:00 h
(liters)

Tank 1 ( meters) 0 0 0 0 -
Tank 3 (meters) 0 0 0 0 - Total Untreated Fuel Available - liters
Tank 4 (meters) 0 0 0 0 - Total Treated Fuel Available - liters
Tank 7 (meters) 0 0 0 0 -
Tank 8 (meters) 0 0 0 0 -
Tank 9 (meters) 0 0 0 0 -
7 - Operation Equipments Times
Hours out of Service Station Total Stopped
Hours in Operation Hours in Stand by
(forced stop)
Equipment Availability Lost Load % Station % Effeciency
Availability % hrs
Gas Turbine 1 (890137) 0 24 0 100 %
Gas Turbine 2 (890139)
Gas Turbine 3 (890140)
24
0
0 0
24
100
0
% 80 24.00 12.50 39.36
0 %
Gas Turbine 4 (890141) 24 0 0 100 %
Gas Turbine 5 (890270) 24 0 0 100 %
Gas Turbine 6 (890271) 0 24 0 100 %
Gas Turbine 7 (890272) 24 0 0 100 %
Gas Turbine 8 (890276) 24 0 0 100 %
Steam Turbine 1 0 0 24 0 %
Steam Turbine 2 24 0 0 100 %
Fuel Treatment Separator A 0 24 0 100 %
Fuel Treatment Separator B 0 24 0 100 %
Fuel Treatment Separator C 0 24 0 100 %
Fuel Treatment Separator D 0 24 0 100 %
Fuel Treatment Separator E 0 24 0 100 %
Fuel Treatment Separator F 0 24 0 100 %
RO Water Treatment System 0 24 0 100 %
31-12-21

Mass Global For Investment OPERATION DAILY REPORT Erbil Gas Power Station EGPS-OP-2022- 154
M D Y

Date : 6-3-2022 From 0:00:00 to 23:59:59 SITE Erbil Gas Power Station
8 - Daily Trip Records
Internal Fault External Fault
Equipments Event Trip Time Back on Line time Description of Event
(EGPS) (Electrical Grid)

9 - Generator Power Output, Power Import & Export


ENERGY METER
Generator Power Output Max Available ENERGY METER AT
00:00 h 06:00 h 24:00 h Total MW Day MW Average by Hour GT's AT 6:00 AM
(MWh) power 6:00 AM (TODAY)
(YESTERDAY)
GT 1 (890137) 8374767 8374767 8374767 0.00 0.00 29356.00 GT1 8374767 8374767
GT 2 (890139) 9176110 9176549 9178217 2,107.00 87.79 capacity factor % GT2 9175710 9176549
GT 3 (890140) 436740 436740 436740 0.00 0.00 56.36 GT3 436740 436740
GT 4 (890141) 348014 348729 350685 2,671.00 111.29 GT4 346637 348729
GT 5 (890270) 9713617 9714367 9716268 2,651.00 110.46 GT5 9711730 9714367
GT 6 (890271) 8367327 8367327 8367327 0.00 0.00 GT6 8365495 8367327
GT 7 (890272) 8469581 8470323 8472236 2,655.00 110.63 GT7 8467752 8470323
GT 8 (890276) 8112982 8113724 8115450 2,468.00 102.83 GT8 8111599 8113724
STG 1 (270T863) 5156609 5156609 5156609 0.00 0.00 STG-1 5156609 5156609
STG 2 (270T864) 5934560 5935634 5938554 3,994.00 166.42 STG-2 5932829 5935634

Gross Internal Consumption


Power Export (MWh) 00:00 h 24:00 h Daily Power Generation 132 KV Daily Power Export 132 KV
with Transformer Loses 132KV
Erbil Center1 (Export) 5288283.00 5288283.00

Erbil Center1 (Import) 273908.00 273908.00 12552.00 MWh 12,449.00 MWh 103.00 MWh
Erbil Center2 (Export) 506261.00 506261.00

Erbil Center2 (Import) 225952.00 225952.00

Erbil Center3 (Export) 2387678.00 2387678.00

Erbil Center3 (Import) 1460479.00 1460479.00 Daily Power Import


Erbil Center4 (Export) 5505518.00 5505518.00 132 KV
Erbil Center4 (Import) 968818.00 968818.00
0.00 MWh
TL South Erbil1 (Export) 12478146.00 12479524.00

TL South Erbil1 (Import) 825.00 825.00

TL South Erbil2 (Export) 12208345.00 12209724.00

TL South Erbil2 (Import) 838.00 838.00 Gross Internal Consumption with


Daily Power Generation 400 KV Daily Power Export 400 KV
TL Grd Malla1 (Export) 5803162.00 5804518.00 Transformer Loses 400KV
TL Grd Malla1 (Import) 443.00 443.00

TL Grd Malla2 (Export) 4240862.00 4242255.00 3994.00 MWh 3,705.00 MWh 289.00 MWh
TL Grd Malla2 (Import) 863.00 863.00

TL Kawrgosk1 (Export) 8414197.00 8417408.00

TL Kawrgosk1 (Import) 508.00 508.00

TL Kawrgosk2 (Export) 6921783.00 6924891.00

TL Kawrgosk2 (Import) 345.20 345.20 Daily Power Import


TL Makhmur1 (Export) 4931556.00 4932180.00 400 KV
TL Makhmur1 (Import) 254.90 254.90
0.00 MWh
TL Makhmur2 (Export) 2855352.00 2855352.00

TL Makhmur2 (Import) 448.00 448.00

400 KV Erbil center#1 (Export) 13285070.00 13288775.00

400 KV Erbil center#1 (Import) 14169.90 14169.90

400KV Erbil center#2 (Export) 2172469.00 2172469.00

400 KV Erbil center#2 (Import) 1146.40 1146.40


31-12-21

Mass Global For Investment OPERATION DAILY REPORT Erbil Gas Power Station EGPS-OP-2022- 154
M D Y

Date : 6-3-2022 From 0:00:00 to 23:59:59 SITE Erbil Gas Power Station
10 - Gas Turbines Operation Conditions
Gas Turbine 1 Gas Turbine 2 Gas Turbine 3 Gas Turbine 4 STG#1 GRS #1 GRID
Outlet
Exh. Inlet Inlet Exh. Inlet CPD Exh. Inlet CPD Inlet Gas
Hours MW
Temp °C Temp. °C
CPD (Bar) Vars KV MW Exh. Temp °C
Temp. °C
CPD (Bar) Vars KV MW
Temp °C Temp. °C (Bar)
Vars KV MW
Temp °C Temp. °C (Bar)
Vars KV MW GasTemp.
press.(bar)
132 KV
5 (H.E)°C
1:00 0 0 0 0 0 0 55 399 32 9 28.5 14.44 0 0 0 0 0 0 115 548 17 10.7 66.1 14.41 0 44.84 29.79 129
2:00 0 0 0 0 0 0 76 452 31.3 9.4 34.3 14.44 0 0 0 0 0 0 115 549 16.9 10.6 71.2 14.41 0 44.45 29.76 129
3:00 0 0 0 0 0 0 75 455 30.7 9.4 39.9 14.44 0 0 0 0 0 0 115 548 16.8 10.7 73.2 14.41 0 46.30 29.64 127
4:00 0 0 0 0 0 0 77 465 31 9.4 12.7 14.44 0 0 0 0 0 0 114 550 17 10.6 55 14.41 0 43.81 29.35 128
5:00 0 0 0 0 0 0 87 498 32.9 9.6 13.7 14.44 0 0 0 0 0 0 115 549 17.5 10.7 53.9 14.41 0 45.57 29.38 128
6:00 0 0 0 0 0 0 75 461 32.3 9.4 12.9 14.44 0 0 0 0 0 0 114 550 17.8 10.6 54.8 14.39 0 46.01 29.23 128
7:00 0 0 0 0 0 0 86 507 35.4 9.5 13.6 14.44 0 0 0 0 0 0 114 550 18.6 10.6 53.7 14.41 0 45.28 30.02 130
8:00 0 0 0 0 0 0 99 561 36 10 46 14.45 0 0 0 0 0 0 115 548 19 10.7 48 14.42 0 46.69 29.97 130
9:00 0 0 0 0 0 0 98 559 41 9.9 48 14.45 0 0 0 0 0 0 112 548 21 10.7 40 14.41 0 45.38 29.59 131
10:00 0 0 0 0 0 0 98 561 42 9.8 44 14.44 0 0 0 0 0 0 111 550 21 10.6 42 14.41 0 45.72 29.59 131
11:00 0 0 0 0 0 0 94 565 43 9.5 54 14.41 0 0 0 0 0 0 109 552 21 10.4 53 14.544 0 43.96 29.59 129
12:00 0 0 0 0 0 0 92 562 44 9.5 51 14.51 0 0 0 0 0 0 109 549 22 10.5 50 14.39 0 45.62 29.53 130
13:00 0 0 0 0 0 0 96 561 44 9.8 46 14.44 0 0 0 0 0 0 112 548 21 10.6 45 14.39 0 44.35 29.47 130
14:00 0 0 0 0 0 0 95 563 44 9.7 59 14.44 0 0 0 0 0 0 111 550 21 10.58 58 14.54 0 44.65 29.44 129
15:00 0 0 0 0 0 0 95 562 45 9.7 50 14.44 0 0 0 0 0 0 111 549 21 10.6 48 14.41 0 43.23 29.47 128
16:00 0 0 0 0 0 0 96 561 44 9.7 38 14.44 0 0 0 0 0 0 111 548 21 10.6 38 14.45 0 45.23 29.50 129
17:00 0 0 0 0 0 0 94 564 44 9.6 45 14.45 0 0 0 0 0 0 110 550 21 10.5 42 14.41 0 44.79 29.61 132
18:00 0 0 0 0 0 0 94 564 44 9.6 58 14.44 0 0 0 0 0 0 110 550 21 10.5 56 14.45 0 44.50 29.56 130
19:00 0 0 0 0 0 0 97 561 41 9.8 62 14.44 0 0 0 0 0 0 111 549 20 10.6 60 14.39 0 44.20 29.52 128
20:00 0 0 0 0 0 0 97 563 40.2 9.7 60.7 14.32 0 0 0 0 0 0 112 551 19.3 10.5 69.1 14.39 0 44.79 29.53 126
21:00 0 0 0 0 0 0 102 557 36.9 10.1 61.5 14.35 0 0 0 0 0 0 114 547 18.4 10.7 66.9 14.39 0 44.11 29.18 126
22:00 0 0 0 0 0 0 103 556 36.1 10.1 64.1 14.35 0 0 0 0 0 0 114 548 18 10.7 68.4 14.39 0 45.67 28.79 126
23:00 0 0 0 0 0 0 117 543 19.1 10.9 72 14.39 0 0 0 0 0 0 116 546 16.9 10.8 70.1 14.39 0 45.28 28.00 126
0:00 0 0 0 0 0 0 118 543 17.4 10.9 61.1 14.39 0 0 0 0 0 0 116 546 17.6 10.8 61.6 14.39 0 43.96 28.03 126
Gas Turbine 5 Gas Turbine 6 Gas Turbine 7 Gas Turbine 8 STG#2 GRS #2 GRID
Outlet
Exh. Inlet Inlet Exh. Inlet CPD Exh. Inlet CPD Inlet Gas
Hours MW
Temp °C Temp. °C
CPD (Bar) Vars KV MW Exh. Temp °C
Temp. °C
CPD (Bar) Vars KV MW
Temp °C Temp. °C (Bar)
Vars KV MW
Temp °C Temp. °C (Bar)
Vars KV MW GasTemp.
press.(bar)
400 KV
(H.E)°C
1:00 114 553 18.2 10.7 66.6 14.4 0 0 0 0 0 0 114 548 16.9 11 67.5 14.41 114 556 16.8 10.6 66.3 14.41 174 49.58 29.94 387
2:00 114 554 17.6 10.6 72 14.4 0 0 0 0 0 0 114 549 16.4 10.9 73.2 14.41 114 558 16.4 10.5 71.4 14.41 178 50.41 29.82 386
3:00 114 550 17.5 10.8 73.1 14.4 0 0 0 0 0 0 114 547 17.2 11 73.2 14.41 114 556 17.4 10.6 71.9 14.41 177 51.43 29.73 383
4:00 114 553 17.3 10.7 55.2 14.4 0 0 0 0 0 0 114 549 17 10.9 56.2 14.41 114 558 16.7 10.5 54.3 14.41 175 51.14 29.56 385
5:00 115 553 18 10.7 54.3 14.4 0 0 0 0 0 0 113 549 17.2 10.9 56.4 14.41 113 560 16.7 10.4 55.3 14.41 175 50.65 29.41 386
6:00 113 554 18.2 10.6 54.7 14.4 0 0 0 0 0 0 113 549 17.5 10.9 56.3 14.41 114 559 17.1 10.5 54.9 14.41 176 50.50 29.44 386
7:00 113 554 19.3 10.6 53.7 14.4 0 0 0 0 0 0 113 549 18.5 10.9 54.6 14.41 113 559 18.2 10.5 53.3 14.41 173 50.99 30.35 386
8:00 113 553 19 10.6 50 14.4 0 0 0 0 0 0 111 550 18 10.8 52 14.41 112 559 18 10.4 51 14.41 170 50.90 30.26 386
9:00 112 552 22 10.7 40 14.41 0 0 0 0 0 0 112 548 20 11 41 14.41 111 557 20 10.5 40 14.37 161 49.58 29.94 385
10:00 111 550 21 10.6 43 14.41 0 0 0 0 0 0 111 554 22 10.6 44 14.4 112 559 20 10.4 44 14.37 160 50.85 29.35 387
11:00 109 557 22 10.4 54 14.4 0 0 0 0 0 0 109 553 20 10.7 56 14.41 109 561 21 10.2 54 14.41 161 51.68 29.97 386
12:00 109 555 23 10.5 50 14.4 0 0 0 0 0 0 110 550 21 10.8 51 14.41 110 559 21 10.4 50 14.41 161 49.75 29.54 388
13:00 111 552 23 10.7 44 14.4 0 0 0 0 0 0 112 547 20 11 45 14.42 112 556 20 10.6 44 14.41 162 51.63 29.85 390
14:00 110 555 23 10.5 59 14.4 0 0 0 0 0 0 110 549 20 10.8 60 14.41 70 586 20 10.4 40 14.41 155 49.23 29.58 387
15:00 111 553 24 10.6 48 14.4 0 0 0 0 0 0 111 548 20 10.9 52 14.44 80 587 46 8.4 49 14.41 156 51.50 30.00 385
16:00 111 553 24 10.6 38 14.4 0 0 0 0 0 0 112 548 20 10.9 41 14.44 80 548 45 8.4 13 14.4 156 49.28 30.02 385
17:00 111 555 24 10.5 44 14.4 0 0 0 0 0 0 111 549 20 10.8 48 14.41 80 587 45 8.3 31 14.54 156 52.22 30.02 389
18:00 109 556 23 10.4 57 14.4 0 0 0 0 0 0 111 555 20 10.8 60 14.44 90 574 45 8.3 60 14.5 156 50.94 29.90 389
19:00 110 553 22 10.6 62 14.4 0 0 0 0 0 0 111 547 20 10.9 65 14.44 80 589 43 8.2 64 14.44 158 49.78 29.79 384
20:00 111 556 21.6 10.4 69.4 14.4 0 0 0 0 0 0 111 552 19.2 10.7 68.5 14.41 91 575 39.6 9.1 60.7 14.44 163 50.70 29.76 385
21:00 114 552 20.4 10.7 67.9 14.4 0 0 0 0 0 0 113 547 17.9 11 65.8 14.39 115 556 18.2 10.6 67 14.41 174 50.75 29.38 385
22:00 114 549 19.3 10.8 68.1 14.4 0 0 0 0 0 0 115 545 17.3 11.1 66.6 14.39 116 554 16.9 10.8 67.4 14.41 173 50.50 28.94 386
23:00 116 549 17.1 10.9 71.5 14.4 0 0 0 0 0 0 115 545 16.3 11.1 70.8 14.39 117 555 16.7 10.7 71.5 14.41 175 52.75 28.18 384
0:00 115 549 18.3 10.8 62.2 14.4 0 0 0 0 0 0 115 545 17.6 11.1 61.4 14.39 117 554 17 10.7 62.3 14.41 172 51.04 28.18 384
31-12-21

Mass Global For Investment OPERATION DAILY REPORT Erbil Gas Power Station EGPS-OP-2022- 154
M D Y

Date : 6-3-2022 From 0:00:00 to 23:59:59 SITE Erbil Gas Power Station
Comments:
Equipments Work Order Number Fault description Root Cause Analyze Actions

12 - Operation Daily Log Book


Time: Event Description
GT#2 is floating load, GT#4 is base load, GT#5,7,8 are base load (external load) for running of STG#2, GT#1,6 are out of service (standby) due to shortage of gas & liquid fuel, GT#3 is out of service due to CI
0:00 maintenance process, STG#1 is out of service, STG#2 is 174 MW, GT#2,4,5,7,8 are running on gas fuel, over frequency relay protection on GT#4.
GT#2 is floating load, GT#4 is base load, GT#5,7,8 are base load (external load) for running of STG#2, GT#1,6 are out of service (standby) due to shortage of gas & liquid fuel, GT#3 is out of service due to CI
7:00 maintenance process, STG#1 is out of service, STG#2 is 173 MW, GT#2,4,5,7,8 are running on gas fuel, over frequency relay protection on GT#4 ---- (change shift).
7:46 GT#2 returned to base load.
13:38 GT#8 auto shutdown due to high atomizing air temperature & HRSG#8 bypass running.
13:47 GT#8 preselected load command ON due to atomizing air temperature high.
13:50 GT#8 evaporative cooler system OFF due to GT#8 preselected load command ON.
13:58 HRSG#8 merged to STG#2.
14:00 Cold work permit no.1302 provided to CMD. Dept. for GT#6/Inspection turbine by borescope & inspection filter house.
14:44 GT#6 turning gear OFF
GT#2,4 are base load, GT#5,7 are base load (external load) & GT#8 is preselected load 80MW for running of STG#2, GT#1,6 are out of service (standby) due to shortage of gas & liquid fuel, GT#3 is out of
19:00 service due to CI maintenance process, STG#1 is out of service, STG#2 is 158 MW, GT#2,4,5,7,8 are running on gas fuel, over frequency relay protection on GT#4 (change shift).
20:15 GT#2 evaporative cooler system ON.
20:30 GT#8 returned to base load (external load).
20:32 GT#2 evaporative cooler system OFF due to water conductivity reading mismatch.
20:37 GT#8 evaporative cooler system ON.
22:45 GT#2 evaporative cooler system ON.

Shift Charge Engineer: Hawkar Fatih