UEPL Production Tornado - 17th May 2023

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Power BI Desktop

UEPL Production Tornado Date: May 17, 2023

Year to Date Performance Badin


▼ -0.52
▲ 0.41 Mboed against YTD E Target
6.61
YTD Average
Mboed against E Target
8.00
50.00 7.06
MTD Average
6.00

Mboed
Mboed Net -0.87
4.00
E Target Monthly Prod V/s E Plan
Mboed

40.00 YTD
2.00
FY E Target -1.35
44.94 44.53 Monthly Prod V/s LE
0.00
Jan 2023 Mar 2023 May 2023

30.00
Mirpurkhas & Khipro
0.12
Mboed against YTD E Target ▲ 0.92 30.88
Mboed against YTD E Target YTD Average
44.28
30.00
Required production rate for FY days remaining 29.95
MTD Average
20.00
0.77
Mboed

Mboed Net
Month to Date Performance E-Target
Monthly Prod V/s E Plan
10.00
0.19
Monthly Prod V/s LE
▼ -0.69 0.00
Jan 2023 Mar 2023 May 2023
Mboed against LE E Target
50.00
Middle Indus & Mehar

Actual
▼ -0.28 5.71
Mboed

40.00 Mboed against YTD E Target YTD Average


LE E Target
44.72 45.41 43.96 Plan E Target 6.00 5.98
MTD Average
4.00
Mboed

Mboed Net 0.86


30.00
Monthly Prod V/s E Plan
E-Target
2.00

0.76 0.47
Mboed against Plan E Target Monthly Prod V/s LE
0.00
Jan 2023 Mar 2023 May 2023

46.25
Required production rate for the remaining month
Power BI Desktop
Concession Time period
Production Tornado Summary Badin MIM MKK 5/1/2023  5/17/2023 

Oil (BOPD)
Badin Ten Best Performing Fields Ten Worst Performing Fields
Production V/s forecast Field Delta Field Delta
   

Total Fields KHASKELI DOWN THROWN 240 TAJ -365


UMAR 228 KUMBH -196
Baqa 118 Dabhi South Deep -93

3,217
3,342 18
Producing Low V/s Forecast
KAMAL NORTH
ZAUR
NAIMAT WEST
101
83
80
Naimat West Down Thrown
Mehar
SAKHI
-91
-88
-52
RAHIM 72 MAZARI -40
BUZDAR SOUTH DEEP 36 Khaskheli -30
MKK SOUTH MAZARI 35 Bhatti North -25
Production V/s forecast TURK DEEP 27 Sofiya -25
Total Fields
Oil Production Trend
Production V/s forecast

7724
7591
5
Producing Low V/s Forecast
Oil Production BOPD
10,000

MIM
Production V/s forecast
Total Fields
5,000

628
723 2
Producing Low V/s Forecast
0
May 01 May 03 May 05 May 07 May 09 May 11 May 13 May 15 May 17
Criteria: Variance > 5 BOPD
Oil Production Oil Forecast

GAS SALES (MMscfd)


Badin Ten Best Performing Fields Ten Worst Performing Fields
Production V/s forecast Field Delta Field Delta
   
Total Fields Jugan 10.2 Latif -4.8
RANJHO 2.5 KUMBH -4.5

8
Mohar 1.3 RAJANI -3.9
SOHRAB DEEP 0.5 MULAKI -2.9
34.8
24.4
Khaskheli 0.4 Miano -2.4
Producing Low V/s Forecast BUKHARI DEEP 0.4 Mehar -1.7
Fazil 0.4 NAIMAT WEST -1.6
KAMAL NORTH 0.4 Bhatti North -1.5
MKK Saqib 0.3 SUTIARI DEEP -1.5
Production V/s forecast Turk Deep North 0.3 Kandiari -1.2

Total Fields
Gas Sales Trend
Production V/s forecast

181.7
191.6 7
Producing Low V/s Forecast
300

MIM
Gas Sales MMscfd

Production V/s forecast 200

Total Fields

99.1
97.3
6
Producing Low V/s Forecast
100

0
Criteria: Variance > 0.1 MMscfd May 01 May 03 May 05 May 07 May 09 May 11 May 13 May 15 May 17
Daily Total Gas Sales Gas Forecast
Power BI Desktop
Month
Production Tornado Against Forecast 2023 (Year) + May (Month) 

Oil Tornado
Fields Average of Average Oil Delta Remarks
Oil Forecast Production
 
TAJ -365
TAJ 2806 2441 -365 - Taj - 2 downtime due to JP puller stuck during JP recirculation
- Taj - 4 downtime for CM KUMBH -196
- Taj - 6 downtime for PJP hook up, CM & PM
- Taj compressor C-6802 downtime for CM Dabhi South Deep -93
- Taj field is producing below the forecasted rate
KUMBH 204 8 -196 - Kumbh - 4 & 5 are producing below the forecasted rate Naimat West Down Thrown -91
Dabhi South Deep 100 7 -93 - Dabhi South Deep - 1 is producing below the forecasted rate
Mehar -88
Naimat West Down Thrown 212 121 -91 - Naimat West DT - 1 downtime for CM
- Naimat West DT - 1 is producing below the forecasted rate
SAKHI -52
Mehar 389 301 -88 - Mehar - 4 well choked back during Mehar Plant shutdown
- Mehar Field is producing below the forecasted rate
MAZARI -40
SAKHI 52 0 -52 - Sakhi-1 & 6 wells are still shut in due to flow line leakage
MAZARI 377 337 -40 - Mazari - 15 downtime for CM, PM and water handling constraint Khaskheli -30
- Mazari - 17 downtime for CM
- Mazari - 20 downtime for CM
Bhatti North -25
- Mazari - 16 production reduced due to down hole issue
- Mazari - 20 well remained offline for pressure build up
Sofiya -25
Khaskheli 128 98 -30 - Khaskheli field is producing below the forecasted rate
Bhatti North 56 31 -25 - Bhatti North - 1 is producing below the forecasted rate Turk South -22
Sofiya 290 265 -25 - Sofiya - 3 choked back during Mehar plant shutdown

Field
- Sofiya field is producing below the forecasted rate Latif 23
Turk South 34 12 -22 - Turk South - 1 is producing below the forecasted rate
Latif 32 55 23 - Latif field is producing higher than the forecasted rate RAJANI 24
RAJANI 392 416 24 - Rajani field is producing higher than the forecasted rate
TURK DEEP 27
TURK DEEP 0 27 27 - Turk Deep field is producing higher than the forecasted rate
SOUTH MAZARI 212 247 35 - South Mazari field is producing higher than the forecasted rate SOUTH MAZARI 35
BUZDAR SOUTH DEEP 62 98 36 - Buzdar South Deep field is producing higher than the forecasted
rate BUZDAR SOUTH DEEP 36
RAHIM 197 269 72 - Rahim field is producing higher than the forecasted rate
NAIMAT WEST 536 616 80 - Naimat West field is producing higher than the forecasted rate RAHIM 72
ZAUR 194 277 83 - Zaur field is producing higher than the forecasted rate
NAIMAT WEST 80
KAMAL NORTH 83 184 101 - Kamal North field is producing higher than the forecasted rate
Baqa 1281 1399 118 - Baqa field is producing higher than the forecasted rate ZAUR 83
UMAR 615 843 228 - Umar - 5 is producing higher than the forecasted rate
KAMAL NORTH 101
KHASKELI DOWN THROWN 611 851 240 - Khaskheli DT - 4 is producing higher than the forecasted rate
Baqa 118

UMAR 228

KHASKELI DOWN THROWN 240


Power BI Desktop
Month
Production Tornado Against Forecast 2023 (Year) + May (Month) 

Gas Tornado
Fields Average of Average Gas Delta Remarks
Gas Forecast Sales
 
Latif 25.1 20.4 -4.8 - Latif well head compressors downtime for CM
- Latif - 21 is producing below the forecasted rate Latif -4.8
KUMBH 12.4 7.8 -4.5 - Kumbh - 5 is producing below the forecasted rate
RAJANI 23.9 20.0 -3.9 - Rajani field compressors downtime for CM and Rajani remote fusible KUMBH -4.5
loop low pressure
- Rajani field gas sales reduced due to partial diversion to POD-2 RAJANI -3.9
MULAKI 6.3 3.4 -2.9 - Mulaki field is producing below the forecasted rate MULAKI -2.9
Miano 14.7 12.3 -2.4 - Miano compressor A-370 downtime for CM
- Miano field is producing below the forecasted rate Miano -2.4
Mehar 9.2 7.6 -1.7 - Mehar field sales gas suspended during Mehar Plant shutdown Mehar -1.7
- Mehar Field is producing below the forecasted rate
NAIMAT WEST 73.3 71.7 -1.6 - Naimat West - 3 compressor downtime for CM NAIMAT WEST -1.6
- Naimat West - 1 & 4 shut in for well head integrity checks and
greasing job Bhatti North -1.5
- Naimat West - 1 flow line pigging carried out SUTIARI DEEP -1.5
- Naimat Phase - IV flow reduced due to hot oil heater tripping
- Naimat phase III & VA flow reduced due to genset tripping Kandiari -1.2
Bhatti North 2.6 1.1 -1.5 - Mulaki compressor C-8302B downtime for CM
- Bhatti North - 1 is producing below the forecasted rate Sawan -1.0
SUTIARI DEEP 73.8 72.3 -1.5 - Sutiari Deep gas sales reduced due to Phase-III REDA pump tripping SALAMAT -0.4
and Phase - IV hot oil heater tripping
Kandiari 1.7 0.5 -1.2 - Kandiari - 1 is producing below the forecasted rate QABUL -0.3
Sawan 16.8 15.8 -1.0 - Sawan field gas sales reduced due to Sawan plant ESD
- Sawan FEC compressors downtime for CM Turk South -0.3
SALAMAT 6.1 5.8 -0.4 - Salamat - 1 well head compressor downtime for CM Latif South -0.3
QABUL 0.3 0.0 -0.3 - Qabul - 2 is producing below the forecasted rate

Field
Turk South 0.6 0.3 -0.3 - Turk South - 1 is producing below the forecasted rate Sofiya -0.3
Latif South 0.5 0.3 -0.3 - Well remained shut in for pressure build up (Cyclic producer) TAJ 0.2
Sofiya 5.2 4.9 -0.3 - Sofiya - 3 gas sales suspended during Mehar plant shutdown
TAJ 1.1 1.3 0.2 - Taj field is producing higher than the forecasted rate BAUDERO 0.2
BAUDERO 0.0 0.2 0.2 - Well recommissioned post pressure build up (Cyclic producer) THEBO 0.2
THEBO 0.2 0.5 0.2 - Thebo - 1 is producing higher than the forecasted rate
NAIMAT BASAL- 0.0 0.2 0.2 - Well recommissioned post pressure build up (Cyclic producer) NAIMAT BASAL-2X 0.2
2X KAUSAR DEEP 0.3
KAUSAR DEEP 0.8 1.1 0.3 - Kausar Deep - 1 is producing higher than the forecasted rate
Turk Deep North 0.1 0.4 0.3 - Cyclic producers Turk Deep North 0.3
Saqib 1.6 2.0 0.3 - Saqib - 1A is producing higher than the forecasted rate Saqib 0.3
KAMAL NORTH 0.5 0.9 0.4 - Kamal North field is producing higher than the forecasted rate
Fazil 1.1 1.4 0.4 - Fazil - 1 is producing higher than the forecasted rate KAMAL NORTH 0.4
BUKHARI DEEP 0.3 0.7 0.4 - Bukhari Deep field is producing higher than the forecasted rate Fazil 0.4
Khaskheli 0.6 1.1 0.4 - Khaskheli - 19 is producing higher than the forecasted rate
SOHRAB DEEP 2.6 3.1 0.5 - Sohrab Deep field gas sales improved post fuel gas switching from BUKHARI DEEP 0.4
POD - 1 to POD - 2
Khaskheli 0.4
Mohar 18.0 19.4 1.3 - Mohar field is producing higher than the forecasted rate
RANJHO 0.1 2.6 2.5 - Ranjho Field is producing higher than the forecasted rate SOHRAB DEEP 0.5
Jugan 4.9 15.2 10.2 - Jugan - 2 is producing higher than the forecasted rate
Mohar 1.3
RANJHO 2.5
Jugan 10.2

You might also like