Professional Documents
Culture Documents
Dua Lima
Dua Lima
Database Name : Above Water Riser Calibration Block : STEPWEDGE & V2 Access Tech. : RAT
Criteria Type : External Inspection Sensitivity Level : 56.4 Db 80% FSH Client : PERTAMINA PHE OSES
Project Name : Above Water Riser Inspection Epoch 650 s/n. : 190835504 Report No. : UT/RSS/OSES-AWRI/06/21/025
Line / Item Name : 12.75" 3P NE INTAN - A TO Probe : 0° / 5 MM / 5Mhz Date : June 8, 2021
INTAN - B (OUT GOING) Couplant : CMC Inspector Id : Dedi F / Seto P
Survey Date : June 8, 2021 Client Reps
:-
Platform Name : INTAN NE A Year of Survey : 2021
Previous Inspection Data Reason of Modification Last / Previous Anomaly
Inspection Date : N/A N/A
Year of inspection : N/A
Full Sleeve due to Leak
Modification between Last Inspection Replacement
Sectional Anomaly Location
Part no. Modification
Yes No Replacement N/A
Additional Parts
2 P2 - 12.75 12.7 11.32 11.95 11.95 11.32 11.62 11.92 250 mm From W3
5 P5 - 12.75 12.7 11.65 12.69 12.69 11.65 11.7 12.15 100 mm From W4
12.75" 3P NE INTAN - A TO INTAN - B (OUT GOING)
Inspection Note :
Legend :
Inspected By :
PT RIRE SANJAYA SAKTI PHE OSES INSPECTION ENGINEER
ASNT LEVEL II UT
W1
P2
W3
W4
P5
Support
Rubber
MSL
668447021.xlsx