START-UP CHECKING ON PCBA SUMMARY: Conveyor Width

Mounter 1
QR Code Etching 1 AND 2 Program Name
Program Number Table A Table B
PCB Lot No. Head nozzle Qty
PCB Line No. Assigned Feeder Qty
Metal Mask Alternative Feeder Qty
Nidec Drawing No. Conveyor Width

Sensor must be funtioning Mounter 2

Receiving Jig must set properly; not wiggled Program Name

QR Code must be readable by QR scanner

Loader Head nozzle Qty

Pitch 1 Assigned Feeder Qty

PCB Guide must be fitted to PCB Alternative Feeder Qty

Conveyor Width
Pusher must be center of PCB
Visual Inspection after Mounting
Mode Auto
Magnifier Good lighting
Cleaner
Reflow
Vacuum Cleaner must be funtioning (sound)
Program Name
ESD Brush must have contact with PCB
Conveyor Width
Ionizer must be ON (green LED)
Support Width
PCB support must be activated
Conveyor Speed
Conveyor Speed 70 cm/min
Temp. Settings Top Bottom
Mode Auto
Z1 160 °C 160 °C
Conveyor Width
Z2 175 °C 175 °C
Printer
Z3 175 °C 175 °C
Program Name
Z4 175 °C 175 °C
Metal Mask Z5 195 °C 195 °C
must be in proper loading position Z6 215 °C 215 °C
no solder adhesion or foreign material/
Z7 250 °C 250 °C
no dent/ not damaged
Z8 258 °C 258 °C
Support Block O2 Concentration 500~1500 ppm
no foreign material/ no movement/
Blower Fan Freq. 20 Hz
no dent/ not damaged or worn out
Cooling Fan Freq. 30 Hz
Squeegee Chiller Water Level must be within normal range
must be clean; not contaminated Ionizer must be functioning (paper check)
with remained solder KIC Profile Name
Check squeegee conditions Profile Result PWI Must be 0% - 100%
(not wear,no scratches, no damage, AOI
cleanliness, no dent) Program Name

Pressure 60 N Master Board Good sample

Angle 55 deg NG sample

Speed 70 mm/sec Conveyor Width

Cleaning Method WET NG Stacker

Pitch 1
Conveyor Width
Mode Auto
Check Items Requirements
Pusher must be center of PCB
Rolling solder paste Must be proportional supplied on metal mask
Ionizer must be functioning (paper check)
Test Print Result is Good to SPI

SPI

Program Name

Inspection mode Auto

QR Code Scanner must be functioning

CKD real data must be collected


for ASIDE only

Check Items Requirements

PCB Guide must be fitted to PCB

Conveyor Width

Unloader

Pitch 1

Mode Auto

Pusher must be center of PCB

Fan must be functioning (paper check)

Conveyor Width Auto

ICT

Program Name N/A

MPX Cables Must be inserted properly

Upper and Lower Fixture Must be properly aligned the accordingly

Self Check Measurement board value must be passed

Master Board Good sample

NG sample

Singulation

Program Number N/A

Dust collector vacuum Must be working/functional

Carrier Jig and Cover


No scratches,deformation and pin bending

Cutting Board Must no excess cut, over cut & burr cut

and damage of circuit pattern

`
Check the pressure measurement at
QR LASER Pressure the main air pressure gauge of the
Machine if within specification.
Check the communication cable if
Cable properly inserted to PC (must not
loose,no open wire ).
Check the Jig condition,screw must
Jig
be tight fixed ( not rattle & moving).
Must be working/functional properly (
Satefy sensor
not broken &damage ).
Must be working/functional properly (
Detection sensor
not broken & damaged ).
Must be working/functional properly (
Switch bottons
not broken & damaged ).
Must see clearly ( not blurred screen
Monitor
& wiggled display )
Must be working/functional properly (
Buzzer
not broken & damaged ).
LOADER
Check the pressure measurement of
the main air pressure supply of the
Machine if within specification.
Air Pressure
Check the filter regulator, remove the
moisture accumulated inside by
discharging.
Check the limit sensor condition,
there must be contact in magazine
rack and sensor roller must not
broken & damage.
Check the PCB pusher belt
Load/Unload
condition; not wear and tear/damage
Conveyor
Load/Unload surface must be free
from foreign material and dust.
Check if Transmission chains are
good functions;( not broken
&damage ).
Check if there is no abnormalities
when operation;( no unusual noise).
Check platforms condition,no
obstacle and free from substrate
waste.
Check if magazine rack is properly
Elevator units
locked when operation.
Check up/down platform if there is no
abnormalities when operation; ( no
unusual noise ).
Must be working properly &
Patlite functional when operation; ( not
busted lights )
Must be working/functional properly (
Buzzer
not broken & damaged ).
Must working properly; ( not broken
Emergency Stop
& damage )

PCB CLEANER
Air Pressure Check the pressure measurement of
the main air pressure supply of the
Machine if within specification. Check that cleaner gauze is filled
Check the pressure measurement of with cleaning alcohol.
the vacuum air pressure supply if Must be working properly &
within specification. Patlite functional when operation; ( not
Check the conveyor speed if within busted lights )
the stardard speed specification. Must see clearly ( not blurred screen
Check the conveyor belt condition; Monitor & wiggled display )
Conveyor not wear and tear/damage Check touch screen function
Check the conveyor roller/s condition
when operation; must not Must be working/functional properly (
Keyboard/Mouse
wiggled,rattle & no unusual noise. not broken & damaged ).
Make sure ESD brush are enabled in Must be working/functional properly (
Buzzer
operational display; ( not in by pass not broken & damaged ).
mode ) Emergency Must working properly; ( not broken
Check if the ESD brush if functional Stop/Switch buttons & damage )
and touches PCB board when
Vacuum Units
normal operation. SOLDER PRINTER INSPECTION
Vacuum must be working/functional
when operation (via sound) Check the loaded program name in
Ionizer must be "ON" when operation the machine( use start-up
(Green LED is ON) Program
checksheet for model program name
Must be working properly & checking reference )
Patlite functional when operation; ( not Check the free storage of realdata in
busted lights ) Storage
the Drive D. (20GB)
Must be working/functional properly ( There must no
Buzzer
not broken & damaged ). Conveyors abnormalities/abnormal noise when
Must working properly; ( not broken operations
Emergency stop
& damage ) Must be working properly &
Patlite functional when operation; ( not
PRINTER busted lights )
Emergency Must working properly; ( not broken
Check the loaded program name in Stop/Push buttons & damage )
the machine( use start-up Must see clearly ( not blurred screen
Program & wiggled display )
checksheet for model program name Monitor
checking reference ) Check touch screen function
Check the pressure measurement of
the main air pressure supply of the Must be working properly & function
Buzzer
Machine if within specification when when operation: ( not damage )
Air Pressure operation.
Check the filter regulator, remove the LINKING CONVEYOR 1 AND 2
moisture accumulated inside by
discharging. Check the conveyor roller/s condition
Check the Attack angle (deg) when operation; must not
settings if in standart setting. Conveyor unit wiggled,rattle & no unusual noise.
Check the squeegee speed ( Back Check the conveyor belt condition;
and Front ) settings if in startard not wear and tear/damage
Parameters
setting. Check the buttons condition; ( not
Check the squeegee force ( Back broken/damage & not busted lights )
and Front ) settings if in standard Check the conveying belt speed
setting. control if sets in stardard speed
Check the conveyor belt condition; specification.
not wear and tear/damage Check the switching mode control if
Conveyor unit Check the conveyor roller/s condition sets in stardard mode specification.
when operation; must not Check if Auto-vision is working
wiggled,rattle & no unusual noise. properly; ( judgement must be
Check that the mount knobs of the aligned to actual board inspection ).
Squeegee squeegee head are tightened &
completely inserted.
SURFACE MOUNTER 1 AND 2
Cleaning Unit Check that the cleaner gauze roll is
roll correctly.
Check the loaded program name in Check the profile result;Good PWI
Profile
the machine( use start-up (100% below)
Program
checksheet for model program name Check if the lubricant on the chain is
checking reference ) wetting,if not apply lubricant
Check the pressure measurement of automatically for .5 minutes.
the main air pressure supply of the Conveyor system Check the chain tensility
Machine if within specification when
Air Pressure operation. Check the entrance and exit sensor if
Check the filter regulator, remove the functional
moisture accumulated inside by Check the water level in the water
discharging. cooling machine if within the range.
Check the conveyor roller/s condition Cooling System Check the pressure suction
Conveyor when operation; must not ( standing) if within the required
wiggled,rattle & no unusual noise. specification
Check the nozzle tip condition check the discharge pressure
Nozzle Tip through Dirt tip check & measuring (standing) if within required
vacuum level. specification.
Make sure there is no foreign Check the Refrigerant level (running
materials , feeder plate is free from pressure) suction if within the
dust when operation. required specification
Feeder plate Check the volume of lubricant in the
Make sure accumulated carrier tapes Lubricant System
in empty tape box are disposed oil cup,not less than 5mm
regularly. Check if the N2 concentration is in
Check that abnormal sound such a normal condition.
N2 System
metal sound is not heared Check the N2 pressure if within the
Check that the sound of tape cutter required specification.
Tape cutter Make sure the exhaust reflow
moving is not loader than usual.
Check carrier tapes in the empty Exhaust exhaust fan is working
tape box are cut appropriately. properly/operational.
Make sure surfaces are free from
Tape set station
drop parts and carrier tapes LINKING CONVEYOR 3
Check the all QR code scanner
condition; must be working properfly
Check the conveyor roller/s condition
and functional, ( not broken &
when operation; must not
damage ).
Conveyor Unit wiggled,rattle & no unusual noise.
Check all Monitors if working
Check the conveyor belt condition;
properfly & functional; touch screen
not damaged/worn-out.
response, no wiggled displayed &
Must be functional/working properly;
damage screen.
"Green light is ON"
Check all machine emergency/push Cooling fan
Auxiliary Check the cooling fan air filter if
buttons condition must be working
clean , not wear and damage
properly and functional; ( no broken
and busted lights ) Check the ionizer must be function
Ionizer fan
(via paper check )
Make sure all safety interlock
swithces are working & functional Check and verify speed control knob
properly Motor 1 settings if within the required
standard specification
Check all patlite conditions must be
working properly & function; ( no Check and verify speed control knob
broken & busted lights ) settings if within the required
standard specification
Motor 2
REFLOW

Check the loaded program name in


the machine( use start-up
Program AOI
checksheet for model program name
checking reference )
Check if the PV and SV temperature Check the loaded program name in
are closely match the machine( use start-up
Parameter Settings Program
Check the conveyor speed if in checksheet for model program name
required standard specification. checking reference )
Air Pressure Check the pressure measurement of
the main air pressure supply of the
Machine if within specification when UNLOADER
operation.
Check the filter regulator, remove the
moisture accumulated inside by Check the pressure measurement of
discharging. the main air pressure supply of the
Must be working properly & Machine if within specification.
Air Pressure
Patlite functional when operation; ( not Check the filter regulator, remove the
busted lights ) moisture accumulated inside by
Must be working properly & function discharging.
Keyboards/Mouse when operation: ( not broken & Check the limit sensor condition,
damage ) there must be contact in magazine
Emergency Must working properly; ( not broken rack and sensor roller must not
Stop/Push buttons & damage ) broken & damage.
Must see clearly ( not blurred screen Conveyor Load/Unload surface must be free
& wiggled display ) from foreign material and dust.
Monitor Check if Transmission chains are
Check touch screen function
good functions;( not broken
Must be working properly & function &damage ).
Buzzer Check if there is no abnormalities
when operation: ( not damage )
when operation;( no unusual noise).
Check the conveyor belt condition;
NG STACKER
not wear and tear/damage
Check the PCB push sensor
Check the pressure measurement of condition, including
the main air pressure supply of the functionality and sensor wire.
Machine if within specification. Check platforms condition,no
Air Pressure
Check the filter regulator, remove the obstacle and free from substrate
moisture accumulated inside by waste.
discharging. Check if magazine rack is properly
Check the limit sensor condition, Elevator units
locked when operation.
there must be contact in magazine Check up/down platform if there is no
rack and sensor roller must not abnormalities when operation; ( no
Conveyor
broken & damage. unusual noise ).
Load/Unload surface must be free Check the fan must be functional (via
from foreign material and dust. Cooling fan
paper check ).
Check if Transmission chains are Must be working properly &
good functions;( not broken Patlite functional when operation; ( not
&damage ). busted lights )
Check if there is no abnormalities Must be working properly & function
when operation;( no unusual noise). Buzzer
when operation: ( not damage )
Check the conveyor belt condition;
not wear and tear/damage
IN – CIRCUIT TESTER
Check the PCB push sensor
condition, including
functionality and sensor wire. Check the pressure measurement of
Check platforms condition,no the main air pressure supply of the
obstacle and free from substrate Pressure Machine if within specification.
waste. Check if there is no machine air leak
Check if magazine rack is properly pressure; "no audible air leak noise"
Elevator units Check the machine groundings
locked when operation.
Check up/down platform if there is no connection if connected to earth
abnormalities when operation; ( no groundings.
unusual noise ). Machine Check all NPX cable should be no
Check the ionizer must be function looseness of connection
Ionizer Check if there is no abnormalities
(via paper check )
Must be working properly & when operation;( no unusual noise).
Patlite functional when operation; ( not Check alignment of top ICT jig to
busted lights ) Jig bottom ICT jig. Guide rod must be
Must be working properly & function fit/center to the guide hole.
Buzzer Check the cycle life of the test prove
when operation: ( not damage ) Test probe
on the operation counter
Safety light curtain must be working/functional properly Check if the cleaning solvent is
supplied to the whole area of metal
Reset switch must be working/functional properly Cleaning portion stencil during operations
Check if cleaning nozzle is not
Door switch must be working/functional properly clogged
must be working/functional properly Check if any error is indicated on the
Press switch screen
Must see clearly ( not blurred screen Operation panel Check if the settings value of
Monitor operation time based on program
& wiggled display )
matrix.
SINGULATION Must be working properly &
Patlite functional when operation; ( not
busted lights )
Check the loaded program number in Must be working properly & function
the machine( use matrix for model Buzzer
Program when operation: ( not damage )
program number checking
reference )
Check the water level, to determine
Manometer
dust filter condition if clogged.
Check the pressure measurement of
the main air pressure supply of the
Machine if within specification when
Filter regulator operation.
Check the filter regulator, remove the
moisture accumulated inside by
discharging.
Check the router bit condition; not
broken/damage, clean & free from
Spindle motor any foreign material.
Check if there is no abnormalities
when operation; ( no unusual noise).
must be functional/working properly
Safety sensor
when running
Check the jig condition if inserted
Machine Jig properly & must clean & free from
any foreign material
Dust collector Must be operational & working
vaccuum properly when router is running

METAL MASK STENCIL CLEANER

Check the pressure measurement of


the main air pressure supply of the
Machine if within specification.
Filter regulator
Check the filter regulator, remove the
moisture accumulated inside by
discharging.
Check if there is any clogging in the
pump filter.
Check the running count of the pump
filter
Recycle tank check the running count of the
recycle fiter
Check the amount level of cleaning
solvent height is within the min and
max limit.
Check the amount of liquid in the
Gas neutralizer gas neutralizer If the height is within
the min and max limit.