Location : No 21, Jalan Ekoflora 3/6

Date : 21/06/2022
Outstanding Material

Refer to the SNP - Fourth Schedule ( Clause


14) Building Description.
Sanitary Fittings - Kitchen Sink (1 no)
Issue : No Kitchen Sink has installed and placed.
Defect List

No Location Section Description Remarks Photo

1 Living Area Floor Tiles Hollow Refer marked on site

2 Living Area Wall Hair-line Crack Refer to marked on site


3 Living Area Rough Surface Refer to marked on site

The corner not leveling well and


4 Living Area
bulging

Wool pile peel off - Poor


5 Living Area Sliding Door Replace the damage wool pile
Workmanship
Poor wokmanship on painting -
6 Living Area
Flashing

7 Living Area Main Door Damaged

8 Living Area Sliding Door Lock loose and damaged


Poor workmanship - Joint Sealant
9 Living Area Wall
sweatches area

10 Living Area Floor Tiles Hollow Refer to marked on site

Floor and
11 Kitchen Tiles Hollow Refer to marked on site
Wall
12 Bath 3 Accessories Tissue holder loose

13 Bath 3 Wall Dirt and end of edge tiles not leveling

The paint film should be opaque


14 Bath 3 Frame Door Poor workmanship - Grinning enough to cover the background
surface.
A few tiles in the toilet got sticker
15 Bath 3 Wall Hollow
hollow "H"

16 Bath 3 Frame Door Hollow

Untidy joints between door frame and


17 Bath 3
floor
18 Bedroom 4 Wall Crack and rough surface Marked on site

19 Bedroom 4 Door Uneven edge of Door On site was marked 'U'

20 Bedroom 4 Floor Tiles Hollow Marked on site


Baluster Physical damage and scratches on
21 Staircase
Railing baluster railing

Baluster
22 Staircase Poor workmanship - Joint not proper
Railing

Please check Method of


Poor workmanship of cutting tiles due
23 Staircase Statement for Staircase
to bad look
Installation
Hall 1st
24 Wall Hair-line Crack
Floor

Hall 1st Round of Exposed pipe improper


25 Wall
Floor touch up

26 Bedroom 2 Floor Tiles Hollow Stickers marked on site


27 Bedroom2 Frame Door Hollow

Poor workmanship - Grinning at edge


28 Bedroom 2
of corner

Frame , Hollow and imporoper paint at jointing


29 Bedroom 2
Floor frame and floor
Window
30 Bedroom 2 Poor workmanship during installation
frame

Window Untidy joints between window frame


31 Bedroom 2
frame and wall

Window
32 Bedroom 2 Improperly installed joint sealeant
frame
window Mortar droppings and paint drips on
33 Bedroom 2
frame frame

Window
34 Bedroom 2 External wall crack
Frame

35 Bedroom 2 Window Paint peeling


Poor workmanship - Wrinkling and
36 Bedroom 2 Window
rough surface

Window Untidy and improper paint betwwen


37 Bedroom 2
Frame sealeant and wall

Edge of Corner - Untidy, Poor


38 Bedroom 2 Window
workmanship finishes paint
Inadequate protection during
Window Damage and small scratches on
39 Bedroom 2 fabrication, delivery, storage and
frame frame.
installation

40 Bedroom 2 Wall Spotted Hair-line crack Stickers marked on site

41 Bedroom 2 Wall Crack and rough surface


Poor finishing of paint on jointing
42 Bedroom 2
socket

Spotted crack, rough surface and


43 Bedroom 2 Wall
wrinkling

Spotted crack, rough surface and


44 Bedroom 2 Wall
wrinkling
45 Bedroom 3 Floor Tiles Hollow Stickers marked on site

Not Functioning and spotted paint on


46 Bedroom 3 Socket
the socket

Chipped cement wall. Improperly


47 Bedroom 3 Wall
painted
48 Bedroom 3 Wall Wall crack

49 Bedroom 3 Floor Improperly sealed the jointing skirting

Surface crack and poor workmanship


50 Bedroom 3 Door Frame
paint
51 Bedroom 3 Wall Crack and rough surface

52 Bedroom 3 Wall Wrinkling paint

53 Bedroom 3 Wall Corner Edge Grinning


Master
54 Window Improperly installed joint sealeant
Bedroom

Master
55 Wall Hairline Wall Creacked
Bedroom

Master Poor workmanship on touch up corner


56 Wall
Bedroom wall and hairline crack
Master
57 Wall Hair-line Crack
Bedroom

Master
58 Wall Hair-line Crack Stickers marked on site
Bedroom

Master Untidy window frame and improperly


59 Window
Bedroom applied sealant
Master
60 Wall Hair line crack
Bedroom

Inadequate protection during


Master Frame
61 Physical rust and stain on frame fabrication, delivery, storage and
Bedroom Window
installation

Master
62 Wall Hair-line crack , wringkling Stickers marked on site
Bedroom
Master Not Functioning and spotted paint on
63 Plug Socket
Bedroom the socket

Master
64 window Hair line crack
Bedroom

Master Not Functioning and spotted paint on


65 Plug Socket
Bedroom the socket
Master
66 Wall Crack and rough surface
Bedroom

Master
67 wall Hair line crack , wringkling
Bedroom

Master
68 wall frame Crack and rough surface
Bedroom
Untidy and improperly installed
Master
69 Wall socket socket. The cement mortar was
Bedroom
damage

Master
70 wall frame Blistering and peeling.
Bedroom

71 Bath 2 Wall tiles Tiles Hollow


Tiles Hollow and untidy touch up
72 Bath 2 Wall tiles
corner cap

73 Bath 2 Wall tiles Spotted Tiles Hollw

74 Bath 2 Wall tiles Untidy joint and improper touch up


75 Bath 2 Wall tiles Hollow

Untidy touch up paint between


76 Bath 2 Window
window frame and wall

Wash Hand Poor Installation on wash hand basin.


77 Mater Bath
Basin Not leveling and tilted
78 Mater Bath Door Frame Hollow

Untidy touch up paint between door


79 Master Bath Door Frame
frame and wall

Improperly applied water proofing


80 Water Tank Roof around the pipe and water tank
scratch.
Ceiling
81 Internal Roof Conduit not fully cover wiring.
Roof

Ceiling
82 Internal Roof Conduit not fully cover wiring.
Roof

External
83 Floor Skirting tiles Hollow
Front
External
84 Floor Tiles hollow
Front

External
85 Floor Chipped Tiles
Front

External
86 Tiles Hollow
Front
External Untidy joints and paint drips on
87
Front skirting tiles

External
88 Untidy finish paint and wrinkling paint
Front

External
89 Door Frame Grinning
Front
Poor workmanship and improperly
External
90 installed door frame. The frame out of
Front
tiles and not in level.

External
91 Untidy paint and poor workmanship
Front

External
92 No joint filler
Front
External
93 Door Frame Poor workmanship on finishing paint
Front

External
94 Edge of Corner wall bulging
Front

External Rough surface and wrinkling wall


95
Front paint
External
96 Hair-line crack and wrinkling
Front

External
97 Wringkling and Grinning finish paint
Front

External
98 No joint filler
Right
External
99 Hollow and imporoper tiles joint
Right

External
100 Blistering and peeling.
Right

External Master
101 Blistering and peeling.
Right Bedroom
External Identify caused from RWDP or
102 Wall Damping
Right weather

External
103 Chalking and grinning paint
Right

External Untidy and improperly touch up jpint


104
Right paint
External
105 Wall crack
Right

External
106 Suspended slab crack
Right

External
107 Blistering and peeling
Right
External
108 Hair line crack
Right

External
109 crack
Right

External
110 Brush mark and 2 tones colour paint
Right
External
111 Peeling paint
Right

External
112 Dirty and Untidy touch up paint
rear

Improperly installed between roof and


External
113 wall. Can see the gap and crack on
rear
edge V shape of the roof
External
114 Dirty and Untidy touch up paint
rear

You might also like