Professional Documents
Culture Documents
Hydrotesting Policy Leakage Calculator
Hydrotesting Policy Leakage Calculator
Hydrotesting Policy Leakage Calculator
RESULTS
ALLOWABLE
0.090092
LEAKAGE
ACTUAL
0.080640000000385
LEAKAGE
REMARKS PASSED
NOTES:
1. Input value only on the cells highlighted by yellow
2. Flowmeter reading should be inputed up to the Liters digit
3. Initial Reading of Flowmeter will be the reading after a drop of 7psi in pressure and Final Reading will
be the reading after the pressure reach back to 100psi (repeat if pressure continues to drop by 7psi)
FLOWMETER DATA
FINAL READING
(Increased to VOLUME
100psi)
1023.238 0.0080000000000382
HDPE HYDROTESTING
INITIAL DATA: TIME:
P1= 110
T1= 25 8:13 AM loading time to reach P1
T2= 175 11:08 AM time after P1 to read for P2
P2= 105
T3= 375 2:28 PM time after P1 to read for P3
P3=
TEST NO. 1
F1= 0.9545
REMARKS WITH AIR
TEST NO. 2
F2= 0.0000
REMARKS FAILED
IF TEST NO. 1 AND TEST NO. 2 PASSED, THE PIPELINE PASSED THE HYDROTEST
NOTES:
1. Input value only on the cells highlighted by yellow
2. Make sure to read P2 and P3 based on the given T2 and T3
3. T1, T2, & T3 are time in Minutes