Walls Measurement
Walls Measurement
Walls Measurement
Measurement I
Student declaration
I / We confirm that the works submitted for this assignment are my /our own work
Lakshan M.A.N
Pathirana T.P.P.D
Taking off Quantities for the Proposed House of Mr. Ranasinghe in Homagama
Objectives
▪ To strengthen the knowledge and skills of taking off and measurement of
Substructure, Walls, Roof, Doors and Windows.
▪ To improve knowledge and skills of basic principles of taking off and writing item
descriptions.
▪ To improve the ability to use and interpret NRM 2 for building works.
Tasks
Take off quantities of the following items for the construction of Proposed House of Mr.
Ranasinghe in Homagama as shown on Drawing numbers BE1601/CW/01, BE1601/CW/02
and BE1601/CW/03 and attached specifications.
▪ Substructure
▪ Walls in Ground Floor including adjustments for openings
▪ Roof and Doors & Windows in Ground Floor.
All taking off shall be strictly in accordance with the New Rules of Measurement (NRM2).
Where any information is missing, specification is inadequate or exact nature of the
construction is unclear, you are required to make sensible assumptions. All assumptions
made shall be entered on a Query Sheet.
Methodology
▪ Students shall work in-groups of three (3) to accomplish the given tasks
▪ Students can take photographs or scan the taking off document and upload it to Moodle
in PDF format
Submission 03: Roof and Doors & Windows in - 5th January 2021
Ground Floor
Individual Viva - 6th January 2021
Group Basis
Compliance to General
Evaluation of
Total
1st Submission: Assessment Criteria
Presentation of the
Taking off quantities for
Substructure T.O. Check List
Assumptions
format
Rules
Maximum marks 15 20 25 15 15 10 100
Student(s) names(s) / Reg. No.
Prasad R.A.W
Lakshan M.A.N
Pathirana T.P.P.D
Comments on report
[
Assessment Criteria
Group Basis
Evaluation of
Compliance to General
Accuracy of Quantities
2nd Submission:
Total
Taking off quantities for
Presentation of the
Walls in Ground Floor
Assumptions
openings
format
Rules
Maximum marks 15 20 25 15 15 10 100
Student(s) names(s) / Reg. No.
Prasad R.A.W
Lakshan M.A.N
Pathirana T.P.P.D
Comments on report
[
Assessment Criteria
Group Basis
Quality of Descriptions
Accuracy of Quantities
Compliance to General
Query Sheet / Logical
3rd Submission:
Total
Presentation of the
Taking off quantities for
Assumptions
Windows in Ground Floor
format
Rules
Maximum marks 15 20 25 15 15 10 100
Student(s) names(s) / Reg. No.
Prasad R.A.W
Lakshan M.A.N
Pathirana T.P.P.D
Comments on report
[
Assessment Criteria
Individual Basis
Confidence of answering to
Individual contribution
Total
Individual Viva Evaluation
Use of NRM 2
questions
Maximum marks 40 20 20 20 100
Total
1st 2nd 3rd Viva
Reg. No. Student name CW
35% 20% 30 % 15% marks
100%
192706U Prasad R.A.W
192644C Lakshan M.A.N
192720G Pathirana T.P.P.D
Note: Late course works are subjected to a penalty of five (5) marks for the first delayed 24 hours.
Thereafter, coursework submissions will not be accepted, and zero marks will be given.
Assessed by (name/s)
(Examiner/s / Lecturer/s)
Signature Date