CL

15

CUT =
FILL =4.4855 sq m

0.60 4.25 3.28 5.00

GRAVEL ROAD LEVEL


10

VARIES
COMPACTED
EMBANKMENT

5.2

VARIES
COMPACTED
EMBANKMENT

0.60
5

R I V E R COMPACTED
EMBANKMENT

6.00
5.320 5.920 7.720 7.720 10.250 10.250
-12.000 -8.500 -7.500 -5.000 0.000 3.000

-20 -15 -10 -5 0 5 10 15 20

STA 0+380

CL
15

CUT =
FILL =6.7892 sq m
0.60 4.25 2.95 5.00

GRAVEL ROAD LEVEL


10

VARUES
COMPACTED
EMBANKMENT

0
5.2

VARIES
COMPACTED
EMBANKMENT

0.60
5

COMPACTED
R I V E R EMBANKMENT
6.00

5.070 5.570 7.570 7.570 10.400 10.400


-11.300 -9.300 -7.800 -5.000 0.000 3.200

-20 -15 -10 -5 0 5 10 15 20


STA 0+360
PREPARED : PROJECT & LOCATION : SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

BENJAMIN M. QUIDILLA CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS FC
OWNER
CONSTRUCTION OF SLOPE PROTECTION ALONG ILOILO CITY CROSS SECTION REGIONAL OFFICE VI
ILOILO CITY DISTRICT ENGINEERING OFFICE
MA. ELENA P. DE LOS REYES JONAH S. PALOMA YOLANDA B. PUGNA HAYDEE S. ALUNAN
DATE: FLOODWAY, JARO, ILOILO CITY FORT SAN PEDRO, ILOILO CITY PROJECT ENGINEER OIC, CHIEF CONSTRUCTION SECTION OIC ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 17 29
DATE: DATE: DATE: DATE: