CHAPTER II

REVIEW ON RELATED LITERATURE


2.1 LOCAL ( ANG REVIEW ON RELATED LITERATURE AY STUDY ,
SYSTEM O RESEARCH NA MAY PAGKA PAREHO SA SYSTEM NINYO
DITO SA PILIPINAS)

2.1.1 TITLE

1ST PARAGRAPH – SUMMARY NG KANILANG STUDY.

2ND PARAGRAPH- SA ANONG PARTE NG SYSTEM OR STUDY NILA


ANG MAGKA PAREHAS KAYO?

2.1.2 TITLE

1ST PARAGRAPH – SUMMARY NG KANILANG STUDY.

2ND PARAGRAPH- SA ANONG PARTE NG SYSTEM OR STUDY NILA


ANG MAGKA PAREHAS KAYO?

2.2 GLOBAL ( ANG REVIEW ON RELATED LITERATURE AY STUDY ,


SYSTEM O RESEARCH NA MAY PAGKA PAREHO SA SYSTEM NINYO
SA IBANG BANSA OR INTERNANIONALLY)

2.2. TITLE

1ST PARAGRAPH – SUMMARY NG KANILANG STUDY.

2ND PARAGRAPH- SA ANONG PARTE NG SYSTEM OR STUDY NILA


ANG MAGKA PAREHAS KAYO?
2.2.2 TITLE

1ST PARAGRAPH – SUMMARY NG KANILANG STUDY.

2ND PARAGRAPH- SA ANONG PARTE NG SYSTEM OR STUDY NILA


ANG MAGKA PAREHAS KAYO?
CHAPTER III
DESIGN AND METHODOLOGY

3.1 SYSTEM DEVELOPMENT LIFE CYCLE METHOD

Figure 1: SDLC(Rapid Application Development)

Rapid application development is a form of Agile software development


methodology. Unlike Waterfall methods, RAD emphasizes working software and user
feedback over strict planning and requirements recording. While RAD de-emphasizes
strict planning, there are still a handful of steps or phases each development project
goes through when using the rapid application development methodology.

(IN SHORT PO, ANG SDLC OR RAD APPLICATION METHODOLOGY AY ANG


PROSESO PO SA PAG GAWA NG SYSTEM AND DOCU. NINYO. SA CHAPTER NA
ITO I EXPLAIN NYO KUNG ANO GINAWA NINYO PARA MATAPOS ANG SYSTEM
BASE PO SA FIGURE OR PICTURE NA NASA TAAS)

3.1.1 ANALYSIS AND DESIGN


After the title was approved, the researchers ( ANONG GINAWA NINYO
PARA MAKUHA ANG MGA DATA NA KAILANGAN NINYO PARA SA PAG
GAWA NG DOCU AND SYSTEM NINYO? AT PAANO NYO NASIMULAN I
DESIG ANG SYSTEM NINYO?)
3.1.2 BUILD
After getting all the needed informations, the developer created the design
( AFTER NYO NAKUHA LAHAT NG DATA NA KAILANGAN NINYO ANONG
GINAWA NINYO PARA MAKA PAG START NA ANG DEVELOPER SA PAG
GAWA NG SYSTEM NINYO?)
3.1.3 DEMOSTRATE
After building the proposed system, the researchers demonstrated the
system and one of users responded that the design is not appropriate to the
convenience of the user and there are some malfunctioning buttons.
Furthermore, the objectives of the proposed system was neither reached nor
accomplished.
3.1.4 REFINE
Using the feedback gained, both programmer and developer corrected
and improved the design and all the lacking processes of the system.
3.1.5 TESTING
Every components of the system were tested to ensure that they were
fully functional. In this testing stage, computers are being tested: first, the
proponents tested the CPU to ensure that it was in good condition and the
running capacity can handle the entire system without defect and will run
perfectly. The input devices were also tested such as the keyboard and mouse to
ensure that every key were functioning well. Lastly, the monitor to secure that it
can display the system the way it was designed.

3.1.6 IMPLEMENTATION
The researchers gathered response after the system was demonstrated. It
was refined afterwards in order to reach the objectives and was tested to ensure
it’s functionality. The system undergone various important steps and is
completely ready for implementation.

3.2 GANTT CHART ( DITO NAMAN SA GHANTT CHART , DITO NYO


ILAGAY ANG TIME FRAME SA PAG GAWA NYO NG DOCU AND
SYSTEM NINYO FROM DAY 1, BE SPECIFIC! DAPAT MAKITA KUNG
ANONG DATE NYO NATAPOS AND NASIMULAN ANG DOCU AND
SYSTEM NINYO.
TAKE NOTE! EXAMPLE LANG PO ITONG NA SA BABA PARA MAY
BASES KAYO.)

TASK NAME DURATIO START FINISHE DEC. JAN. FEB. MARCH


N D

Data Gathering and 4 days 12/10/201 12/14/201


Facts Collection 8 8

Data Analysis and 20 days 12/17/201 1/5/2019


design 8

Data Flow Diagram 7 days 1/17/2019 1/23/2019

Entity Relationship 8 days 1/18/2019 1/25/2019


Diagram

Database 10 days 1/10/2018 1/20/2019


Management

Coding 25 days 12/20/201 1/13/2019


8

User Validation 3 days 1/24/2019 1/26/2019

Final Coding 15 days 1/27/2019 2/16/2019

Implementation 1 day 2/7/2019 2/7/2019

Start On-Going Finish

Table 2: Gantt Chart of the Study


3.3 BUDGET AND TECHNICAL REQUIREMENTS ( ILISTA SA BABA
ANG EXPENSES NINYO HABANG GUMAGAWA KAYO NG DOCU AND
SYSTEM NINYO)

Physical Expenses
Items Description Qty Price
Computer Set 1 set 25,000
Printer 1 set 5,000
Electric Bill 500/ 1 Month 1,500
TOTAL 31,500
Program Expenses
D Architecture 8,500
Line of Codes 12,000
TOTAL 20,500
GRAND TOTAL 52,000

Table 3: Physical Expenses of the Proposed system

3.4 REQUIREMENTS SPECIFICATION

3.3.1 HARDWARE REQUIREMENTS ( MAGDAGDAG NALANG


KAYO KUNG MAY IBANG HARDWAREREQUIREMENTS PA NA
KAILANGAN PARA GUMANA ANG SYSTEM NINYO.)

Hardware Requirements
Monitor Phillips 14” Casing 705 block 300 w
Printer Epson L360
Keyboard A4 Tech
Processor COREi5
RAM DDR3 4 GH z
Hard Disk 500 GB
SEAGATE 7200 RPM

Table 4: Hardware of the Proposed system

3.4.2 SOFTWARE REQUIREMENTS ( ILISTA SA BABA ANG


SOFTWARES OR APPLICATION NA NEED I INSTALL NG USER PARA
GUMANA ANG SYTEM NINYO. TAKE NOTE! SAMPLE LANG PO ANG
NASA BABA I EDIT LANG NINYO KUNG IBANG SOFTWARE ANG
GAMIT NINYO.)

Software Requirements
Virtual Image Any Browser
Operating System Windows 7 Ultimate or Higher
Language PHP version 7
Server Generator Apache XAMPP

Table 5: Software of the Proposed System

3.5 ARCHITECTURAL DESIGN ( ANG FIGURE OR PICTURE NA NASA


BABA APPLICABLE OR PWEDE LANG PO SA ONLINE NA SYSTEM .
KUNG HINDI ONLINE ANG SYSTEM NINYO KINDLY SEARCH
ARCHITECTURAL DESIGN FOR OFFLINE SYSTEM I CHANGE NINYO
KUNG HINDI ONLINE ANG SYSTEM NINYO. )
Figure 2: Architectural Design of the Proposed system