Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

7 6 5 4 3 2 1

800KN.m 900KN.m 900KN.m


800KN.m
300KN.m

800KN.m 400KN.m 400KN.m 200KN.m


700KN.m

B 1650KN.m

TENDER DRAWING
1000KN.m

2400KN.m

900KN.m
OWNER:

C
DESIGN AND BUILD CONTRACTOR:

1000KN.m

ARCHITECT:

800KN.m 700KN.m 400KN.m 400KN.m 200KN.m


ENGINEER'S / CONSULTANT:

PT SPECIALIST:

800KN.m 300KN.m
800KN.m 900KN.m 900KN.m
PPI ENGINEERING SYSTEMS PTE LTD.

PROJECT TITLE:

(3-6) STOREY PLAN DRAWING TITLE:

LIVE LOAD TABULATION:-


1. CARPARK - 5.0 kN/m2
2. DRIVEWAY - 5.0 kN/m2
3. STAIRCASE - 2.5 kN/m2 DRAWN BY: CHECKED BY: APPROVED BY: SCALE: 1 : 150
4. PRODUCTION - 10 kN/m2 J.B B.Z PT DATE: NOV 2021
DEAD LOAD TABULATION:-
DRAWING NO: 21--/T/(3_6)-PLN REV. 0
1. ALL AREA - 3.2 kN/m2
DRAWING FILE LOCATION:

THIS DRAWING IS COPYRIGHT:

CONTRACTORS SHALL WORK FROM FIGURED


DIMENSIONS ONLY.
CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE.
DISCREPANCIES MUST BE REPORTED IMMEDIATELY
TO THE ARCHITECT.

You might also like