SEQUENCING OF WORK
CONTRACTOR IS RESPONSIBLE FOR PROPERLY SEQUENCING THE INSTALLATION
OF THE VARIOUS PART THE PROJECT AND THE TRADES.
INTALLATION OF FINISH MATERIAL TO OCCUR ONLY AFTER ALL PARTS AND
MATERIAL HAVE ARRIVED SITE FOR A COMPLETE JOB OF ANY GIVEN AREA.

PROTECT OF WORK
CONTRACTOR IS RESPONSIBLE FOR PROPERLY PROTECTING ALL FINISH
MATERIAL AS THEY AREA BEING INSTALLED. PROTECTION TO INCLUDE PLASTIC
WATER BARRIERS AS WELL AS ADEGUATE PLYWOOD OR PROTECTION BOARD
TO PROTECT DEMAGE FROM SPILLS OF WORKERS.

GENERAL NOTES
1. ALL CONTRUCTION AND INSTALLATION SHALL CONFORM TO ALL LOCAL CODES
2. THEY CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS OF BUILDING
OF ANY DISPERANCIES BEFORE PROCEEDING WITH CONTRUCTIONS,
BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEDING WITH THE WORK.
3. WRITTEN DIMENSIONS TAKE PRECEDENCE. DO NOT SCALE DRAWINGS.
4. ALL CLEAR DIMENSIONS ARE NOT ADJUSTABLE WITHOUT APPROVAL OF THE
OF THE ARCHITECT.
5. ALL DIMENSIONS TO INTERIOR WALLS ARE CENTERLINE OF WALL NOTED.
6. ALL DIMENSIONS TO EXTERIOR WALLS ARE TO FACE CONCRETE.
7. DETAILS SHOWN ARE TYPICAL SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS
8. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION ARCHITECTURAL
CIVIL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTIONS, EQUIPMENT.
9. ALL GRADES TO MEET EXISTING GRADES AT PROPERTY LINES, STREETS AND,
SITEWALKS, UNLESS OTHERWISE NOTED.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING AND OBTAINING
11. NO DRAINAGE SHALL BE TAKEN TO ADJACENT PROPERTY UNLESS OTHERWISE.
12. ANY SURVEY MONUMENTS WITHIN THE AREA OF CONTRUCTION SHALL BE
PRESERVED OR RESET BY A REGISTERED CIVIL ENGINEER OR A LICENSED.

!