ACTIVITY PROPOSAL FOR FIELD PRACTICE
PHASES ACTIVITY OBJECTIVE EXPECTED DURATION VERIFIABLE REMARKS
OUTPUT INDICATOR
1. Writing of To prepare Approved One week Submitted Accomplished
activity an activity activity
proposal activity proposal proposal
proposal
2. Presentation To present Presented One day Draft of Accomplished
of activity the and approved
proposal proposed approved activity
activities activity proposal
in the proposal
Pre-internship activity
proposal
3. Preparation To allow Complete One week Documents Accomplished
and student documents submitted
submission interns to submitted
of required procure
documents the
necessary
documents
required
in the
field
practice
4. Orientation To prepare One day Accomplished
before the
fielding students
for their
field
practice

Table 1.b
ACTIVITY PROPOSAL FOR FIELD PRACTICE
PHASES ACTIVITY OBJECTIVE EXPECTED DURATIO VERIFIABL REMARKS
OUTPUT N E
INDICATOR

1. Preparation of farm To prepare Farm 5 days Submitted Accomplishe


layout a farm layout report d
layout to prepared
be and
familiarize submitte
with the d
SALT area
2. Land preparation and To clean 5 days Photo Accomplishe
cleaning of the SALT and prepare documents d
area the site
Internshi for
p planting
3. Construction of To 10 days Photo Accomplishe
vegetative/engineerin construct documents d
g SWC measures soil and
water
conservatio
n measures
in the area
4. Planting of fruit- To plant 5 days Photo Accomplishe
bearing trees and agroforestr documents d
agroforestry related y crops
crops (fruit-
bearing
trees and
vegetable
crops) in
the area
Table 1.C
ACTIVITY PROPOSAL FOR FIELD PRACTICE
PHASES ACTIVITY OBJECTIVE EXPECTED DURATION VERIFIABLE REMARKS
OUTPUT INDICATOR

1. Care andTo apply Photo Accomplished


maintenance proper care documents
of theand
planted management
crops in the on the
SALT area established
crops in
the area
2. Preparation To prepare Approved One Submitted Accomplished
Post-internship of narrative the narrative month narrative
report required report after report
narrative the
report of field
the field practice
practice
3. Presentation
for review

4. Finalization
of the
report
5. Submission
of the final
report
APPENDIX B
ACTIVITY PROPOSAL FOR FIELD PRACTICE

PHASES ACTIVITY OBJECTIVE EXPECTED DURATIO VERIFIABL REMARKS


OUTPUT N E
INDICATOR
1. Writing of activity To prepare Approved One Submitted Accomplishe
proposal an activity week activity d
activity proposal proposal
proposal
2. Presentation of To present Presente One day Draft of Accomplishe
activity proposal the d and approved d
proposed approved activity
activities activity proposal
in the proposal
Pre- activity
internship proposal
3. Preparation and To allow Complete One Documents Accomplishe
submission of required student document week submitted d
documents interns to s
procure submitte
the d
necessary
documents
required
in the
field
practice
4. Orientation before To prepare One day Accomplishe
fielding the d
students
for their
field
practice
1. Preparation of farm To prepare Farm 5 days Submitted Accomplishe
layout a farm layout report d
layout to prepared
be and
familiariz submitte
e with the d
SALT area
2. Land preparation and To clean 5 days Photo Accomplishe
cleaning of the area and documents d
prepare
Internship the site
for
planting
3. Construction of To 10 days Photo Accomplishe
vegetative/engineeri construct documents d
ng SWC measures SWC
measures
in the
area
4. Planting of fruit- To plant 5 days Photo Accomplishe
bearing trees and AF related documents d
crops crops in
the area
1. Care and To apply One Photo Accomplishe
maintenance of proper month documents d
the established care and after
crops in the area management the
on the field
establishe practic
d crops in e
Post- the area
internship 2. Preparation of To prepare Submitted Accomplishe
narrative report the narrative d
required report
narrative
report of
the field
practice
3. Presentation for Accomplishe
review d
4. Finalization of
the report
5. Submission of the
final report

PREPARED BY:
BELINDA SJ. ABAD
MARIEL C. ABO
JEAN DIMPLES E. ALBAY
MAY Z. ORDEVIZA
RONNALYN O. SIBULO
BSAF Students

APPROVED:

MARVI MYNELL P. CID


Adviser

CELERINO B. LLESOL JR. PH.D.


Member

EDLYNNE KAITH R. MANLANGIT


Member
APPENDIX C
GANTT CHART OF ACTIVITIES
PROPOSED ACTIVITIES WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7
Feb 20- Feb 27- March 6- March March March April
24 March 3 10 13-17 20-24 27-30 onwards
Preparation of farm
layout
Land preparation and
cleaning of the area
Construction of
vegetative/engineering
SWC measures in the
area
Planting of fruit-
bearing trees and
vegetable crops in the
area
Care and maintenance
of the established
crops and SWC measures
in the area (removing
weeds, watering of
crops daily morning
and afternoon)
Preparation of
narrative report
NOTE: Care and
maintenance will
continue until the end
of the 2nd semester SY
2022-2023.