Professional Documents
Culture Documents
Smart Car Parking Lot
Smart Car Parking Lot
PROJECT ON
SMART CAR PARKING LOT
Submitted by:
Sr. Name of Students Enrollment No.
1 Kuldeep S Bhanderi 210890131009
2 Kush R Desai 210890131020
3 Akshay S Bhimani 210890131038
4 Meet P Savaliya 210890131050
CERTIFICATE
Date:
This is to certify that the “Smart Parking Lot” has been carried out by Kush
R Desai(210890131020), Kuldeep S Bhanderi(210890131009),Meet P
Savaliya(210890131050),Akshay S Bhimani(2108901310038) under my
guidance in fulfillment of the subject DesignEngineering – 1A in
COMPUTER ENGINEERING (3rd Semester) of Gujarat Technological
University, Ahmedabad during the academic year 2022.
CERTIFICATE
Date:
This is to certify that the “Smart Parking Lot” has been carried out by Kush R
Desai(210890131020) under my guidance in fulfillment of the subject Design Engineering- 1A in
COMPUTER ENGINEERING (3rd Semester) of Gujarat Technological University, Ahmedabad
during the academic year 2022.
SHRILABHUBHAITRIVEDIINSTITUTEOFENGINEERING&TECHNOLOGY
SHRI LABHUBHAI TRIVEDI
CERTIFICATE
Date:
This is to certify that the “Smart Parking Lot” has been carried out by Kuldeep S
Bhanderi(210890131009)under my guidance in fulfillment of the subject Design Engineering-
1A in COMPUTER ENGINEERING (3rd Semester) of Gujarat Technological University,
Ahmedabad during the academic year 2022.
SHRILABHUBHAITRIVEDIINSTITUTEOFENGINEERING&TECHNOLOGY
SHRI LABHUBHAI TRIVEDI
CERTIFICATE
Date:
This is to certify that the “Smart Parking Lot” has been carried out by Meet P
Savaliya(210890131050)under my guidance in fulfillment of the subject Design Engineering-
1A in COMPUTER ENGINEERING (3rd Semester) of Gujarat Technological University,
Ahmedabad during the academic year 2022.
CERTIFICATE
Date:
This is to certify that the “Smart Parking Lot” has been carried out by Akshay S
Bhimani (210890131038)under my guidance in fulfillment of the subject Design 1A in
COMPUTER ENGINEERING (3rd Semester) of Gujarat Technological University,
Ahmedabad during the academic year 2022.
5.1 Prototype 24
Contents
1 Introduction 9
2 Empathy Mapping 11
3 Ideation Canvas 17
4 Product Development 20
5 Prototype 23
6 Conclusion 25
1. Introduction
1.1 Introduction:
The Project Automatic Car Parking System. The project is designed for car
parking. The aim of this project is to atomize the car park for allowing the
cars into the park. LCD is provided to display the information about the
total number of cars that can be parked and the place free for parking.
Two sensors are used in this project to identify the entry or exit of the
cars into out of park. These two sensors are arranged either side of the
gate. Whenever the mains are switched on, the LCD displays the message
parking space for 10 vehicles". The number indicates the maximum
capacity of park in this project. Whenever a car comes in front of the gate,
the IR signal gets disturbed and the controller will open the gate by
rotating the stepper motor. The gate will be closed only after the car
leaves the second sensor pair since the controller should know whether
the car left the gate or not. Now the controller decrements the value of
the count and displays it on LCD. In this way, the controller decrements
the count whenever the car leaves the park and displays it on LCD. If the
count reaches0, i e. if the park is completely filled, the controller will
display NO SPACE FOR PARKING" on LCD. And now if any vehicle tries to
enter the park, the gate will not be opened since there is no space. If any
vehicle leaves the park, the controller will increment the count and allows
the other vehicles for parking..
2. Empathy Mapping
Understanding the problem of socitey it is one of the biggest challenges for engineering student as till now we
were making projects on imaginary ideas. So the first session was based on understanding the domain of the
problem in broader sense with emphasized on interacting with the people of our domain area which includes more
of casual talks than technical section. We were mostly observing what are the major of the basic problems of
the peoples in our domain.
The area our domain was steering system ,as we know there are number of peoples are present for their
different purpose or reasons or duties all of them are from different backgrounds and have to perform different
functions or utilize the space in different way. As in our first Canvas of activities we have observed the following
activities
In this stage, we find the various users which are directly or indirectly related to our project.
for example: Shopping malls, Multiplex, Hospitals, Residential Purpose, Educational
Area, Religious Area
Activities ofusers:
Remotee site Monitering
Control & Electrical
Automatic Adjust the Vechicles wheel base
Environment:
Noice Control
Poluction Control
Rode side parking
Interactions:
Regular Workers
Customers
Businessmen
Shopkeeper
Objects:
Transportation Vechicles
Light Weight Vechicles
Users:
Shopkeeper
Visitors
Customers
Businessmen
2.2 Mind mapping:
Then we had used coggle for our mind mapping. It provides a great platform
to make a mind map which can be used for easy analysis .The snapshot of
our coggle sheet is below.
User :
Shopkeeper
Visitors
Customers
Businessmen
Activities:
Remotee site Monitering Control &
Electrical
Automatic Adjust the Vechicles wheel base
Stakeholder:
Government groups
parking industries
Story boarding:
HAPPY
-Jay is going hospitalin an emergancy & he will park his car at the
automatic parking so he will save his time & safely park his car.
HAPPY
-Achal is going to watch movie & park his car in automatic car parking
so he will save his time & save his money.
SAD
-One day bony is going for some shopping & he want to park his car
safely but parking space is not available at that area. So bony park his
car on footpath & police toing vehicle tow his car & fine to his.
SAD
-When there is no parking space available in any area then the trafic was
generated & everybody stuck in traffic.
3. Ideation canvas
People:
Save Large
Space Safe
Parking Secure
Vehicles Save
Time
Activities:
Remotee site
Monitering Control &
Electrical
Automatic Adjust the Vechicles wheel base
Situation/Context/Location:
School parking
Office
Malls
Hospital
Tourist places
Props:
PEOPLE:
Shopkeeper
Visitors
Customers
Businessmen
Product Functions:
Minimum electricity required
Minimum power consume
Ventilation required
Product Features:
Control management system
Security system
Automatic system
24\7 cctv
Save time & space
Components
Rack & pinion
gears
Dc motors
Spring,roller
Hydraulic system elevator
5. prototype