This document contains GMT details for the Bellary-Guntakal section of the South Central Railway between 2019-2023, listing the section, line, from and to locations in kilometers and meters, and GMT (gross metallization track) in kilometers for each year in both the down and up directions. It shows the GMT for the section in the down direction was 28.83 km in 2019-20, 13.94 km in 2020-21, and 25.79 km in 2021-22. In the up direction it was 29.23 km, 19.07 km, and 36.2 km for the same years.
This document contains GMT details for the Bellary-Guntakal section of the South Central Railway between 2019-2023, listing the section, line, from and to locations in kilometers and meters, and GMT (gross metallization track) in kilometers for each year in both the down and up directions. It shows the GMT for the section in the down direction was 28.83 km in 2019-20, 13.94 km in 2020-21, and 25.79 km in 2021-22. In the up direction it was 29.23 km, 19.07 km, and 36.2 km for the same years.
This document contains GMT details for the Bellary-Guntakal section of the South Central Railway between 2019-2023, listing the section, line, from and to locations in kilometers and meters, and GMT (gross metallization track) in kilometers for each year in both the down and up directions. It shows the GMT for the section in the down direction was 28.83 km in 2019-20, 13.94 km in 2020-21, and 25.79 km in 2021-22. In the up direction it was 29.23 km, 19.07 km, and 36.2 km for the same years.
Section: Bellary-Guntakal (BAY-GTL) (208 - 258) Period: 2019-2020 To 2022-2023 As on Date: 30/May/2023 10:40:07 Section Line Location From Location To GMT Year GMT km m km m Bellary-Guntakal DN 2019-20 28.83 Bellary-Guntakal DN 2020-21 13.94 Bellary-Guntakal DN 2021-22 25.79 Bellary-Guntakal DN 2022-23 GMT Not Filled Bellary-Guntakal UP 2019-20 29.23 Bellary-Guntakal UP 2020-21 19.07 Bellary-Guntakal UP 2021-22 36.2 Bellary-Guntakal UP 2022-23 GMT Not Filled