Description of work activities / RA Title: Welding & Repairing of Sub DB-4 on X1- Well
IS THERE A SAFER WAY TO COMPLETE THE JOB? ARE THERE ALTERNATIVES WITH LESS RISK?
Inherent Risk Inherent Risk
Rating Rating Action Due
No. Activity Hazard Consequences Control Measures / Actions Needed to Lower Risk Responsible Person Status
Date
L S R L S R
Pre Job Safety HSE Officer
Meeting (Standard 1. Effective Communication & Discussion of Procedures
1
Procedures to be
Non compliance with standard procedures Personnel Injury 2 4 M
2. Continuous Monitoring by Job Supervisor
2 2 L Maintenance Engineer
discussed) Job Performer
1. Check LEL
2. Depressurize the vessel
3. Purge with nitrogen
Hot Surface
1. Skin Burns 4. Wear proper welder PPE's
Flying Debris Maintenance Engineer
4 Prepare for Hot Job 2. Gas Leakage 2 8 H 5. Use canopies 2 2 L
Fumes Job Performer
3. Fire 6. Avoid welding in confined spaces
Flammable mixture
7. Use Fire Blanket
8. One should not be exposed to welding fumes for more
than 8 hours per day
Very High
12 12 24 36 48 60
(VH)
High (H) 8 8 16 24 32 40
Medium (M) 4 4 8 12 16 20
Low (L) 2 2 4 6 8 10
Very Low
1 1 2 3 4 5
(VL)
1 2 3 4 5
LIKELIHOOD/PROBABILITY
Negligible
0-1 Very Low Existing measure(s) are acceptable. Manage by routine procedures.
HSE Conseq
(one or more consequ
Consequence
description -
Consequence Consequence monetary
Severity summary
Consequence description
summary assessment
(primary assessment
aspect)
- Severe environmental
damage
- Major asset damage/loss - The company is required to
- Unit is out of operation take extensive measures to
- Major impact on other unit restore the contaminated
operation, or has impact on Major environment to its original National
operation of several units and/or effect state impact
other production site - Extended breaches of
- Temporary effect on market statutory or prescribed limits
supply. - Major actions for
remediation/ restoration are
required
- Persistent severe
environmental damage
- Severe disruption extending
- Extensive asset damage/loss
over a large area
- Unit is out of operation
- Severe effect on areas of
- Extensive impact on operation of
Massive recreational use or nature International
more units and/or other
effect conservancy impact
production site
- Constant breaching of
- Permanent/medium term effect
statutory or prescribed limits
on market supply.
- Extensive actions for
remediation/ restoration are
required
Reputation/Community Impact/Social-
Cultural Heritage
Consequence description
- Local Awareness
- there is no concern among the local
community
-No reportable legal case
-No media coverage
- National concern
- Restricted license to operate
- Substantial fines (compare with
financial loss)
-National media coverage
- International public attention.
- Adverse international media
coverage
- Restricted license to operate
- Substantial fines (compare with
financial loss)
Probability Rating
Quantitative:
Frequency (Time Less than 1*10-7 per year 1*10-5 to 1*10-7 1*10-4 to 1*10-5
related)
Approved by:
_______________________
Site Incharge
Name & Signature
Note / Comments (if any):____________________________________________________________