KUALETIE ENGINEERING AND CONSTRUCTION

PROJECT: TECHNO ROOM

LOCATION: CARLATAN, CITY OF SAN FERNANDO, LA UNION

BILL OF MATERIALS
MATERIALS QUANTITY Unit Unit Price TOTAL PRICE

TILE WORKS

0.6m x 0.6m tiles 56 pc ₱ 259.00 ₱ 14,504.00

0.2m x 1.2m tiles 187 pc ₱ 193.00 ₱ 36,091.00

Cement 16 bag ₱ 240.00 ₱ 3,840.00

Sand 1.5 cu.m ₱ 1,150.00 ₱ 1,725.00

Tile Adhesive 13 bag ₱ 362.00 ₱ 4,706.00

Grout 16 bag ₱ 79.00 ₱ 1,264.00

TOTAL PRICE ₱ 62,130.00

CEILING

Ceiling Board 23 pc ₱ 425.00 ₱ 9,775.00

W-clip 138 pc ₱ 6.00 ₱ 828.00

Double Furring 63 pc ₱ 78.00 ₱ 4,914.00

Carrying Channel 120 pc ₱ 70.00 ₱ 8,400.00

Wall Angle 11 pc ₱ 31.00 ₱ 341.00

TOTAL PRICE ₱ 24,258.00

PAINTING WORKS

Concrete Neutralizer 3 liters ₱ 135.00 ₱ 405.00

Arcrylic Concrete Sealer 7 gal ₱ 675.00 ₱ 4,725.00


Arcrylic Gloss Latex Paint 7 gal ₱ 863.00 ₱ 6,041.00

TOTAL PRICE ₱ 11,171.00

WALL PARTITIONS

Railing with 12mm thk Clear Tempered Glass x 0.8m H 11.2 sq.m ₱ 1,008.50 ₱ 11,295.20

2" x 3" x 10' Mahogany wood 8 pc ₱ 900.00 ₱ 7,200.00

TOTAL PRICE ₱ 18,495.20

FURNITURES

Sofa 2 set ₱ 2,813.00 ₱ 5,626.00

Table @ Simulation Room 24 pc ₱ 680.00 ₱ 16,320.00

Chairs 70 pc ₱ 548.00 ₱ 38,360.00

Computer Set 24 set ₱ 10,459.00 ₱ 251,016.00

Wooden Door 2 pc ₱ 1,198.00 ₱ 2,396.00

Sliding Door 1 pc ₱ 4,989.72 ₱ 4,989.72

White Board 2 set ₱ 1,191.97 ₱ 2,383.94

Air Conditioning Unit 1 pc ₱ 18,999.00 ₱ 18,999.00

TOTAL PRICE ₱ 340,090.66

TOTAL PRICE OF MATERIALS ₱ 456,144.86


LABOR COST (35% of tile, ceiling,
₱ 40,618.97
painting works, wall partitions)

TOTAL COST OF PROJECT ₱ 496,763.83