Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20 Y21 Y22 Y23 Y24

Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20 Y21 Y22 Y23 Y24 Y25 Y 26 Y27 Y28
LEGEND
B
3

X0 W36 W37 W37 W36

W44 W45 W45 W44

X1
VERIFY

X2
W38 W38
W35 W35

X3

X4
B
W39 W39

W34 W34

X5

2 4
WAREHOUSE BUILDING -1 WAREHOUSE BUILDING -2
PRODUCTION AREA PRODUCTION AREA
X6 OPEN BELOW OPEN BELOW

W33 W40 W40 W33

X7

X8
W41 W41
W32 W32

STAIR-2 STAIR-4

X9 C W22
SHE
W23 W24 D17 W25 W26 W27

F.E.-1 F.E.-10
W27 W26 W25 D17 W24 W23
SHE W22
D18 D18
D19 D19
OFFICE OFFICE OFFICE OFFICE
D21 AREA AREA W28 W28 AREA AREA D21
D20 D20
W21 W21

HE HE
X10 33
32
31
30
29
33
32
31
30
29
28 28
27 27
26 26

D OPEN
25
24
25
24
OPEN
OFFICE OFFICE OFFICE OFFICE
W20 AREA BELOW 23
22
AREA W29 W29 AREA 23
22
BELOW AREA W20
21 21
20 20
19 19

W18 18
17
18
17
W18

STAIR-3
1 16 16 1

W19
2
3
4
STAIR-1 15
14

13
W31 W30 W30 W31
15
14

13
2
3
4
W19

X11
6 7 8 9 10 11 11 10 9 8 7 6
5 12 12 5

CANOPY CANOPY
1

B MEZZANINE FLOOR PLAN


AS-BUILT

DESIGNER: IN-CHARGE OF CONSTRUCTION: PROJECT TITLE: OWNER: SHEET CONTENT: REVISIONS DESIGN DEVELOPMENT SHEET CODE

ILO O IO I JGC/JL
Civil Engineers Builders
ENRICO TAN PENAFLOR, UAP JOVANNE T. BERNARDINO PROPOSED LOGISTIC EZP DEVELOPMENT JOY CANOY/RODOLFO MAPE

WAREHOUSE DEVELOPMENT INC. RICKY BAUTISTA


APRIL 2022
AR-1.1
WELLINGTON S. LIM AR-1.1 PROPOSED MEZZANINE FLOOR PLAN_R2
R.A. 545 - THIS DRAWING IS AN INSTRUMENT OF SERVICE AND A PROPERTY OF ILO CONSTRUCTION INC. UNAUTHORIZED REPRODUCTION IN PART OR IN WHOLE IS PROHIBITED UNLESS WITH WRITTEN PERMISSION.
X:\@@DESIGN TEAM\ILO PROJECTS (SCHEME-FPD-FCD)\EZP_DAIICHI\AS BUILT\ARCHITECTURAL\AR-1.1 PROPOSED MEZZANINE FLOOR PLAN_R2.dwg
June 27, 2018

You might also like