A. WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH THE SEQUENCING SPECIFIED IN THE BEEN PREPARED TO DEMONSTRATE PRINCIPLES THAT MAY
HS2 SPECIFICATION FOR CIVIL ENGINEERING WORKS SERIES 0600: EARTHWORKS (HS2- BE APPLIED TO THE DETAILING OF EARTHWORKS TO MEET
HS2-CV-SPE-000-010600). HS2 REQUIREMENTS AND THE DESIGN INTENT. THEY
PROVIDE TYPICAL DETAILS OF THE LAYOUT OF
EARTHWORKS AND THE INTERFACE WITH STRUCTURAL,
LEGENDS: CIVIL AND RAIL SYSTEM ELEMENTS OF THE SCHEME AND
IDENTIFY SPECIFIC PARAMETERS THAT MAY BE
STARTER LAYER
LANDSCAPE EARTHWORKS FILL
IT IS NOT INTENDED THAT THESE SEDS SHOULD BE RELIED
TOPSOIL STRIPPING OR ZONE 1
UPON AS STANDALONE CONSTRUCTION DRAWINGS BUT
SUBSOIL STRIPPING LANDSCAPE EARTHWORKS FILL INSTEAD ARE INTENDED TO PROVIDE GUIDANCE TO ACHIEVE
ZONE 2 CONSISTENCY IN THE FORMAT OF EARTHWORKS DESIGNS
UPPER EMBANKMENT FILL TO BE APPLIED TO INDIVIDUAL DESIGN PACKAGES.
LANDSCAPE EARTHWORKS
LOWER EMBANKMENT FILL FILL ZONE 3 (CLASS 4)
WALKWAY
NOTE 11
DRAINAGE APERTURE
HYDRAULICALLY
PROTECTION LAYER BONDED LAYER
WALKWAY EDGING (HBL)
WALKWAY EDGING
TYPE 01 GEOTEXTILE
SEPARATOR WHERE PREPARED SUBGRADE
SPECIFIED - SEE NOTE
6
0 1 2 5 10
METRES
@ 1:100