13-Request For Painting

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

F - ABCD - 43FLBLDG - 13

ABC Construction Corporation Project :


TYPE YOUR PROJECT NAME

REQUEST FOR PAINTING Date Prepared RFP No.

INTERIOR
EXTERIOR

REQUESTED BY : Name/ Designation :


Contractor : Signature :

Note : All signatories should print their name and sign.

AREA (Pls. enclose key plan) GRIDLINE/LOCATION LEVEL STRUCTURE

PREPARED BY CHECKED BY INSPECTED BY


CHECK ITEMS DATE DATE
CONTRACTOR PROJECT SUPERVISOR QC

Surface Preparation
• Neutralizer
• Primer & Putty

Application
• First Coating
• 2nd Coating
• 3rd Coating
• 4th Coating
• Final Coating

MECHANICAL

ELECTRICAL

PLUMBING

FIRE PROTECTION

ARCHITECTURAL

OTHERS

REMARKS :

CHECKED BY : INSPECTED BY :

PROJECT SUPERVISOR QC

APPROVED BY : NOTED BY:

VP-CONSTRUCTION OPERATIONS

NOTE : This form must be submitted to The QC TEAM, duly accomplished and signed by the corresponding
Contractor's Personnel-in-charge at least 24 hours before actual work execution.

Rev. 0 August 27, 2019

You might also like