Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

8 7 6 5 4 3 2 1 0 -1 -2 -3 -4 -5 -6 -7

13.000
9.900

D-44
Roof Detail
A.03.1
+9.150
F F
Gipsum dan
Rockwool 150

B-01
Bata Ringat Lantai Plank
A.03.7 150
3.850

dan Plester 20

3.450
4.570
3.150
Plat Beton
120

B-02 +0.200
A.03.7 ±0.000 +0.020
+5.300
E E
3.100

Bata Ringat
150 dan Plester
D-47 Plat Beton
100

4.70
+2.200
D D

D-50 B-11
A.03.7
2.200

Bata Ringat
Plat Beton 150 dan Plester
400
250
±0.000 -0.100 ±0.000 Revision History
±0.000
C C
RevID ChID Change Name Date

1.450
Fill ≈ 208 m3

1.700
Ruang
2.650

Pompa

B-03 D-49

4.000
A.03.7

2.300
Fill ≈ 208 m3
1.600

7.050
Company Title
-4.000
B B
Excavation ≈ 11 m3 C=0.04
Backfill ≈ 6 m3
4.000 to ±0.000

-6.000
A Excavation ≈ 290 m3 A
Backfill ≈ 200 m3 Fill ≈ 617 m3

C=0.04
RTX Studios
Jl. Gili Layar
Mataram
7.050 to ±0.000
Indonesia
83117
Excavation ≈ 350 m3
Backfill ≈ 230 m3 Kuta Hills Remodel
Jl. Mawun
C=0.04 Kuta
Indonesia
83573

Drawing Name
Intersection - E-02
Drawing Status

Modified by Date
2.300 4.850

2.200 845 1.550 4.090 3.375 2.170 1.000 1.055 670 1.900 2.700 730 1.850 1.750 2.000
Checked by Date

8 7 6 5 4 3 2 1 0 -1 -2 -3 -4 -5 -6 -7 Drawing Scale
1:100
Layout ID Revision
A.05.2
GSPublisherVersion 0.0.100.100

You might also like