Project Title: APBM Construction of Waste Water

PR No.: MBC-PROD-17-042, MBC-PROD-17-043


Participating Suppliers : GOSHU, BAUER, LARS, MAST/CUSS, CAG, ECONVERT/AWE
Final Suppliers : GOSHU, BAUER, ECONVERT/AWE
Evaluated by: John Kenneth C. Tugade
Date:
(WITH EQUIPMENT) Kindly score the supplier based on the following criteria and definition. Scores will be from 1 to 5 with 5 being the best.

ECONVERT/IWE (MODULAR) - GOSHU (2 STEPS AERATION) -


GOSHU (UASB + AS) - OPTION 1
Criteria Description OPTION 1 OPTION 2 Comments
Weighted Weighted Weighted
Offer Score Offer Score Offer Score
Score Score Score

MAST/CUSS - Proposal too high in old


5: With major additional specs
req = 64M
4: With minor additional specs
Functional Equipment Non-submittal of scope of works and Compliant to scope of works and Compliant to scope of works and LARS - Indian company, no local
Specifications 3: Compliant 30% 0 0.00 3 0.90 3 0.90
Specification & Capacity specifications specifications specifications office in Myanmar
2: With 1 minor non- compliant
CAG - System not good
1: With more than 2 minor non-compliant
BAUER - no revised proposal

5: With Lowest Losses than Specs Will meet effluent quality Will meet effluent quality
4: With Lower Losses than Specs PH = 6 – 9 PH = 6 – 9
Meet Effluent Quality 3: Compliant 5% No data provided 0 0.00 COD = 250 ppm 3 0.15 COD = 250 ppm 3 0.15
Acceptance Criteria 2: with 1 non-compliant BOD = 50 ppm BOD = 50 ppm
1: with 2 non-compliant TSS = 50 ppm TSS = 50 ppm

Operating Cost The lower the better 5% No data provided 0 0.00 No data provided 0 0.00 No data provided 0 0.00
(Maintenance + Power) / 350 (per cu.m)
Overall gantt chart
Project Timeline The shortest time the better 15% 40 weeks 5 0.75 56 weeks 3 0.45 56 weeks 3 0.45
from PO/DP/NTP to completion
5 : Training (classroom and actual both)
Training for 1 day (classroom and Training for 4 days (classroom and Training for 4 days (classroom and
Training 3 : Training (classroom or actual only) 10% 0 0.00 5 0.50 5 0.50
actual) actual) actual)
1 : No training

Training and Warranty 5: 30 months and above


4: 24 to 29 months
12 months from the date of 12 months from the date of 12 months from the date of
Warranty 3: 18 to 23 months 10% 0 0.00 2 0.20 2 0.20
commissioning and acceptance acceptance acceptance
2: 12 to 17 months
1: less than 12 months

5: With reference installation in Myanmar


New supplier with Reference New supplier with Reference
Supplier Performance Evaluation Score will be based on the SPE 3: With reference installation within SEA or no
25% No data provided 0 0.00 Installation 3 0.75 Installation 5 1.25
(SPE) or Reference Installation Rating or Reference Installation company name
1. Singha Beer - Thailand 1. Aji-no-moto - Myanmar
1: No reference installation

TOTAL SCORES 100% 0.75 2.95 3.45


Project Title: APBM Construction of Waste Water
PR No.: MBC-PROD-17-042, MBC-PROD-17-043
Participating Suppliers : GOSHU, BAUER, LARS, MAST/CUSS, CAG, ECONVERT/AWE
Final Suppliers : GOSHU, BAUER, ECONVERT/AWE
Evaluated by: John Kenneth C. Tugade
Date: July 17, 2018
(WITH EQUIPMENT) Kindly score the supplier based on the following criteria and definition. Scores will be from 1 to 5 with 5 being the best.

GOSHU (2 STEPS AERATION) - ECONVERT/IWE (MODULAR) -


GOSHU (UASB + AS) - OPTION 1
Criteria OPTION 2 OPTION 1 Comments
Weighted Weighted Weighted
Offer Score Offer Score Offer Score
Score Score Score

MAST/CUSS - Proposal too high in old


req = 64M
Compliant to scope of works and Compliant to scope of works and Compliant to scope of works and LARS - Indian company, no local
Specifications 30% 3 0.90 3 0.90 3 0.90
specifications specifications specifications office in Myanmar
CAG - System not good
BAUER - no revised proposal

Will meet effluent quality Will meet effluent quality Will meet effluent quality
PH = 6 – 9 PH = 6 – 9 PH = 6 – 9
5% COD = 250 ppm 3 0.15 COD = 250 ppm 3 0.15 COD = 250 ppm 3 0.15
Acceptance Criteria BOD = 50 ppm BOD = 50 ppm BOD = 50 ppm
TSS = 50 ppm TSS = 50 ppm TSS = 50 ppm

5% PHP 25 / m3 5 0.25 PHP 38 / m3 4 0.20 PHP 37 / m3 3 0.15

Project Timeline 15% 52 weeks 4 0.60 60 weeks 3 0.45 34 weeks 5 0.75

Training for 4 days (classroom and Training for 4 days (classroom and Training for 1 day (classroom and
10% 5 0.50 5 0.50 5 0.50
actual) actual) actual)

Training and Warranty


10% 12 months 2 0.20 12 months 2 0.20 12 months 2 0.20

New supplier with Reference


New supplier with Reference New supplier with Reference
Supplier Performance Evaluation Installation
25% Installation 5 1.25 Installation 3 0.75 1 0.25
(SPE) or Reference Installation 1. Food & Beverage - The
1. Aji-no-moto - Myanmar 1. Singha Beer - Thailand
Netherlands

TOTAL SCORES 100% 3.85 3.15 2.90


Scope of works r1 Scope of works r2

Layout

Responsibilities Plant Utilities


Maintenance Cost Utilities Requirement
Functional Specifications

Plant and Product Data


Requirement
RFP r1 RFP r2
Project Title: Handle Applicator @ WRC and OMW
PR No.: WR- MP-16-0026 and AB-MP-16-4022
Participating Suppliers : PIC, PTI and NPI
Final Suppliers : PIC, PTI (Note: non submission of Signed scope of work from NPI)
Evaluated by: Elson Geron
Date: 10.25.17
(WITH EQUIPMENT) Kindly score the supplier based on the following criteria and definition. Scores will be from 1 to 5 with 5 being the best.

AND&OR / PIC TWINPACK/PTI SUPPLIER- NON


Criteria Description Comments
Offer Score
Weighted
Offer Score
Weighted COMPLIANT
Score Score
NPI - NON SUBMISSION
5: With major additional specs OF SIGNED SCOPE OF
4: With minor additional specs WORK
Functional Equipment
Specifications 3: Compliant 30% Compliant 3 0.90 PLC is S7 300 instead of S71500 3 0.90
Specification & Capacity
2: With 1 minor non- compliant
1: With more than 2 minor non-compliant

5: With Lowest Losses than Specs


Handle Losses during operation 4: With Lower Losses than Specs
3: Compliant 5% 0.2% Losses 2 0.10 1 0.05
Acceptance Criteria 0.1% Losses
2: with 1 non-compliant
1: with 2 non-compliant
Target Handle Losses = 0.02%
(Operating Cost) The lower the better 5% (Php 0.20/bottle) 5 0.25 (Php 0.34/bottle) 4 0.20

Overall gantt chart


Project Timeline The shortest time the better 15% 18 weeks 5 0.75 26 weeks 3 0.45
from PO/DP/NTP to completion

5 : Academy, FAT, Onsite Training


(Field & Classroom)
FAT -Spain
3 : FAT & Onsite Training
Training 10% Onsite Training(Field and 3 0.30 No Training 0 0.00
(Field & Classroom)
Classroom)
1 : FAT & Onsite Training
(Field)
Training and Warranty

5: 30 months and above


4: 24 to 29 months
Warranty 3: 18 to 23 months 10% 2 years warranty 3 0.30 1 year warranty 2 0.20
2: 12 to 17 months
1: less than 12 months

5: With SPE Rating of 91 to 100%


4: With SPE Rating of 81 to 90%
3: With SPE Rating of 71 to 80% New Supplier with reference
Supplier Performance Evaluation Score will be based on the SPE New Supplier w/out reference
2: New supplier with Reference Installation or 25% installation 2 0.50 1 0.25
(SPE) or Reference Installation Rating or Reference Installation installation
with SPE Rating of 61 to 70% Spain and France
1: New supplier w/o Reference Installation or
with SPE Rating of less than 60%

TOTAL SCORES 100% 3.10 2.05


Proposal Scope of works

Flow Diagram

Responsibilities Plant Utilities


Maintenance Cost Utilities Requirement

Gantt Chart
Functional Specifications

Plant and Product Data


Requirement RFP
Proposal Scope of works

Flow Diagram

Responsibilities Plant Utilities


Maintenance Cost Utilities Requirement

Gantt Chart
Functional Specifications

Plant and Product Data


Requirement RFP
Proposal Scope of works

Flow Diagram

Responsibilities Plant Utilities


Maintenance Cost Utilities Requirement

Gantt Chart
Functional Specifications

Plant and Product Data


Requirement RFP
OPTION 1 - 135 m3/hr and 10,00
EQUIPMENT
ECONVERT/IWE - MODULAR USD / PHP
Submersible Pump for Production Sump Pit $ 17,900
Bar Screen $ 10,700
Sump pit / collection tank $ -
Equalization Tank $ 14,300
Neutralization tank $ -
Biological Conditioning and Control Reactor $ 20,700
Methane Reactor (UASB) $ 416,800
Sequencing batch reactor (Aeration system) $ -
Sedimentation tank / Clarifier $ -
Collection sump for recycle / waste sludge $ 13,900
Laboratory office and equipment $ 102,800
Diversion of container rinse water waste directly to existing
drainage system $ 3,100
Water supply for WWTP (from Filtered Water Tank) $ 1,200
Excess sludge pump $ -
Mechanical de-Watering System $ 22,100
Measuring Meter $ 47,300
Modification, adaptation, and installation of existing WWTP
equipment (if applicable) $ -
Electrical power and Control System $ 33,700
Recommended Spare-parts (6000hrs: Same delivery date with
the equipment the proposal part list need to provide latest one
month before delivery, plant has to decide accept or change
within 2 weeks) $ 10,700
Perimeter Fence with gate, minimum height 3 meter from road
level $ 15,900
Civil works and testing (FDT @ 95%, Concrete and Rebar
testing) necessary for the waste water treatment plant with
stairs, platforms and hand rails. $ 171,500
One-year service agreement $ -
All engineering related materials $ 38,800
TOTAL EQUIPMENT EX-WORK $ 941,400

Design and Engineering $ 6,400


Seaworthy Packing $ 5,100
Freight, DDP Plants $ 16,600
Installation, Including traveling, Hotel, Local Transport, etc. $ 156,700
Start up
Training $ -
Hand Labor (if applicable) $ -
Taxes, Risk Insurance, Performance Bond $ 32,000
TOTAL COST $ 1,158,200
OPTION 1 - 135 m3/hr and 10,000 ppm COD OPTION 2 - 400 m3/hr and 3,500 ppm COD
RT/IWE - MODULAR USD / PHP GOSHU USD / PHP GOSHU USD / PHP
₱ 930,800.00 $ 1,970 ₱ 102,440.00 $ 3,480
₱ 556,400.00 $ 150 ₱ 7,800.00 $ 150
₱ - $ - ₱ - $ -
₱ 743,600.00 $ 22,800 ₱ 1,185,600.00 $ 21,760
₱ - $ - ₱ - $ -
₱ 1,076,400.00 $ 12,080 ₱ 628,160.00 $ 48,460
₱ 21,673,600.00 $ 80,740 ₱ 4,198,480.00 $ -
₱ - $ - ₱ - $ -
₱ - $ 11,430 ₱ 594,360.00 $ 16,790
₱ 722,800.00 $ 1,630 ₱ 84,760.00 $ 1,510
₱ 5,345,600.00 $ 44,670 ₱ 2,322,840.00 $ 44,670

₱ 161,200.00 $ - ₱ - $ -
₱ 62,400.00 $ 23,030 ₱ 1,197,560.00 $ 23,030
₱ - $ 2,000 ₱ 104,000.00 $ 1,880
₱ 1,149,200.00 $ 32,630 ₱ 1,696,760.00 $ 77,650
₱ 2,459,600.00 $ 22,020 ₱ 1,145,040.00 $ 6,040

₱ - $ - ₱ - $ -
₱ 1,752,400.00 $ 77,230 ₱ 4,015,960.00 $ 60,230

₱ 556,400.00 $ 14,900 ₱ 774,800.00 $ 19,600

₱ 826,800.00 ₱ -

₱ 8,918,000.00 $ 424,430 ₱ 22,070,360.00 $ 395,430


₱ - $ - ₱ - $ -
₱ 2,017,600.00 $ 16,180 ₱ 841,360.00 $ 37,060
₱ 48,952,800.00 $ 787,890 ₱ 40,970,280.00 $ 757,740
₱ - ₱ -
₱ 332,800.00 $ 79,170 ₱ 4,116,840.00 $ 58,210
₱ 265,200.00 $ 11,370 ₱ 591,240.00 $ 8,370
₱ 863,200.00 $ 48,610 ₱ 2,527,720.00 $ 17,170
₱ 8,148,400.00 $ 40,350 ₱ 2,098,200.00 $ 23,140
₱ - ₱ 3,830,840.00
₱ - $ 73,670 ₱ - $ 19,130
₱ - $ - ₱ - $ -
₱ 1,664,000.00 $ 450 ₱ 23,400.00 $ 450
₱ 60,226,400.00 $ 1,041,510 ₱ 54,158,520.00 $ 884,210
- 400 m3/hr and 3,500 ppm COD
GOSHU USD / PHP
₱ 180,960.00
₱ 7,800.00
₱ -
₱ 1,131,520.00
₱ -
₱ 2,519,920.00
₱ -
₱ -
₱ 873,080.00
₱ 78,520.00
₱ 2,322,840.00

₱ -
₱ 1,197,560.00
₱ 97,760.00
₱ 4,037,800.00
₱ 314,080.00

₱ -
₱ 3,131,960.00

₱ 1,019,200.00

₱ -

₱ 20,562,360.00
₱ -
₱ 1,927,120.00
₱ 39,402,480.00
₱ -
₱ 3,026,920.00
₱ 435,240.00
₱ 892,840.00
₱ 1,203,280.00
₱ 994,760.00
₱ -
₱ -
₱ 23,400.00
₱ 45,978,920.00
Supplier/Maintenance Yr 1 Yr 2 Yr 3

ECONVERT/IWE $ 800 $ 800 $ 800


GOSHU 1 $ 24,370 $ 6,507 $ 25,370
GOSHU 2 $ 24,570 $ 6,518 $ 25,570

Total Operating Cost (Maintenance +


Cost / m3
Utilities) / yr
ECONVERT/IWE ₱ 1,537,589 ₱ 36.50
GOSHU 1 ₱ 1,599,644 ₱ 37.98
GOSHU 2 ₱ 3,120,503 ₱ 25

1 USD =
1 php =
1 EUR =
Average/yr Average/yr
Yr 4 Yr 5
(USD/EUR) (PHP)
$ 800 $ 800 $ 800.00 ₱ 41,600
$ 6,507 $ 30,150 $ 18,580.80 ₱ 966,202
$ 6,518 $ 30,350 $ 18,705.20 ₱ 972,670

52 php
26 MMK
60 php
Electricity (138.65 MMK/kWH)
Supplier/Utilities
Usage in KWH Cost in MMK Cost in PHP Cost / yr
ECONVERT/IWE 899 MMK 124,666 ₱ 4,795 ₱ 1,495,989
GOSHU 1 381 MMK 52,787 ₱ 2,030 ₱ 633,442
GOSHU 2 1,291 MMK 178,986 ₱ 6,884 ₱ 2,147,833
- -
1st 2nd 3rd

Sump Transfer
OPTION 1 ECONVERT/IWE Equalization Tank EQ Transfer Pump
pump

5.6 m/3hr ₱ 60,226,400


135 m3/day 315 m2
CIF Yangon

2 Transfer pump 60 m3 2 pumps


5.7 m3/hr Holding time? 5.7 m3/hr

Injection of chemicals Injection of chemicals

Anaerobic (EGSB)
115 m3
Holding time?
Injection of anti-foam
Utilities

Why need of
nitrogen? Purpose?
Raw Wastewater
OPTION 1 GOSHU Transfer pump Equalization Tank
Pump
5.6 m/3hr ₱ 51,168,000
135 m3/day 215 m2
DDU Yangon

2 pumps 65 m3 2 pumps
10 m3/hr Holding time? 6 m3/hr
Sequence of
Injection of chemicals
operation?

Filtrate Water

Raw Wastewater
OPTION 2 GOSHU Transfer pump Equalization Tank
Pump
16.7 m/3hr ₱ 42,988,400
400 m3/day 350 m2
DDU Yangon

2 pumps 200 m3 2 pumps


30 m3/hr Holding time? 19 m3/hr
Sequence of
Injection of chemicals
operation?

Sludge Feed Pump


1 pump
3.5 m3/hr

Filtrate Water
4th 5th 6th 7th
Aeration Tank
Stand Pipe (Activated Sludge Degassing Tank
Process)

Injection of chemicals
3.4 m3 200 m3 2 m3
Holding time? Holding time? Holding time?

Recirculation pump
2 pumps
60 m3/hr
Injection of chemicals

Discharge by APBM

Anaerobic Sludge Discharge


Withdrawal Pump (Anaerobic sludge)
2 pumps Sludge collection?
1 m3/hr Volume & frequency?
Accumulation of
sludge?

Filtrate Transfer
Filtrate sump
Pump
1 pump 1 m3
1 m3/hr Holding time?
Reactor Tank
pH Adjust Tank Reactor Feed Pump Aeration 1
(UASB)

5 m3 2 pumps 220 m3 40 m3
Holding time? 15 m3/hr Holding time? Holding time?
Aeration tank 1 is for High loading
Injection of chemicals No anaerobic sludge?
Aeration tank 2 is for Low loading

Sludge Tank
Sludge Feed Pump 5 m3
1 pump Holding time?
1 m3/hr

rate Water
Discharge by APBM

Filter Press Discharge (Aerobic sludge)


6 - 10 kg/hr @ 10,000
Sludge collection? Volume & frequency?
ppm
Accumulation of sludge?

pH Adjust Tank Aeration 1 Aeration 2 Sedimentation Tank

4 m3 180 m3 520 m3 Capacity?


Holding time? Holding time? Holding time?
Aeration tank 1 is for High loading
Injection of chemicals
Aeration tank 2 is for Low loading
Injection of chemicals

Sludge Tank Sludge Control Tank Sludge Settling Tank


25 m3 Capacity? Holding time?
Holding time? Holding time? By air only?
Capacity?

Discharge by APBM
Discharge (Aerobic sludge)
Filter Press Sludge collection? Volume & frequency?
27 - 45 kg/hr @
Accumulation of sludge?
10,000 ppm
8th 9th 10th

Biological Clarifier Discharge

Discharge

25.5 m3
Holding time?
RAS/WAS pump
2 pumps
5.7 m3/hr

Sludge Holding Tank


5 m3
Holding time?

Sludge Transfer
Feed Pump
1 pump
Capacity?

Sludge Conditioning
Tank

4 m3

Holding time?

Injection of chemicals

Filter Press Feed


Pump
1 pump
Capacity?

Discharge by APBM

Filter Press Discharge (Aerobic sludge)


200 L Sludge collection? Volume & frequency?
kg solids/hr? Accumulation of sludge?
Aeration 2 Sedimentation Tank Discharge

Discharge

100 m3 Capacity?
Holding time? Holding time?
ion tank 1 is for High loading
tion tank 2 is for Low loading
Injection of chemicals

Sludge Control Tank Sludge Settling Tank


Capacity? Holding time?
Holding time? By air only?
6 m3/hr

Discharge by APBM

scharge (Aerobic sludge)


ollection? Volume & frequency?
Accumulation of sludge?

Discharge

Discharge
Flowrate @ cu.m/hr
30 m3/cycle/basin
(6 cycles/day)

1 pump
1st 2nd 3rd
GOSHU Transfer pump Equalization Tank Pump
15 m3/hr ₱ 35,118,000
350 m3/day 316 sq.m
DDU Yangon
16 m3

2 Transfer pump 200 m3 2 pump


30 m3/hr 13 hrs 17 m3/hr

No Injection of
Continuous
chemicals

Sump pump
1 sump pump
10 m3/hr
why do sludge return
to eq tank? Because
this waste should be
treated again

Sump pit Screw press

From Naoh Tank Dripping water


From Polymer Tank
in case of chemical
leak

1 m3
Discharge
by APBM
12kg/d (Expect Actual Capacity is

BAUER Transfer pump Clarifier Pump


15 m3/hr ₱ 33,870,115
350 m3/day 316 sq.m
CIF Yangon
16 m3
2 Transfer pump 45 m3 1 pump
24 m3/hr 4.88 m3/day - sludge 3.6 m3/hr

Capacity 24 m3/hr?
Why? It is sized
Sequence of
24m3/hr to 3 hrs
operation?
accommodate the
peak flow.

Purpose and
Objective? The
pH adjustment prior to
purpose of the clarifier
clarifier because pH
is to reduce the
affects the function of
suspended solids as
metabolic enzyme
well as the BOD and
COD influent level

What kind of sludge


can be accumulated in
this section? Primary
sludge (around 6-9%
DS)
Clarifier Sludge pump

1 pump

3.6 m3/hr
To pump the primary
sludge to the aerobic
digester

Discharge
by APBM
Sludge collection?
Volume and
Frequency?
0.79m3/day @ 25%
Dryness
187.65 kg/d
LARS Transfer pump Equalization Tank Pump
15 m3/hr ₱ 39,431,000
350 m3/day 390 sq.m
CIF Yangon
16 m3

2 Transfer pump 116 m3 2 Transfer pump

15 m3/hr 8 hrs 15 m3/hr


4th 5th 6th 7th
Aeration 1 Aeration 2 Sedimentation Discharge

Discharge

100 m3 300 m3 4000 x 2 sets


17 m3/hr
For solid-liquid
(23hr) Aeration Tank separation, to control
Aeration tank 1 is for High loading MLSS, sludge will be
Aeration tank 2 is for Low loading returned to aeration
tank

Sludge Tank
15 m3

Sludge pump

1 sludge pump
2.5 m3/hr

Screw press

Discharge
by APBM
Expect Actual Capacity is 60%)

Pre-react Chamber
Equalization Tank SBR 1/2 Chlorine Contact Tank
1/2
22 m3 60 m3 258 m3 35 m3
23.64 m3/day - sludge

Holding Time?
1.5 hrs 1.9 days 0.5 hr
Purpose?

Injection of Reduction of BOD and


chemicals? To COD? To remove Why do we need this?
homogenized the residual organics and Purpose? For
wastewater and to Injection of suspended solids. To Disinfection. The
handle the fluctuation chemicals? reduce BOD, COD, chlorine will destroy
in both hydraulic and TSS, and other the desease-causing
organic loadings contaminant present microorganisms
in the wastewater

Aerobic Sludge
Digester

To reduce its water


60 m3 and organic content
and to obtain a
48 hrs stabilized product

Filter press feed pump


1 pump
5-10 m3/hr @ 2% DS

Filter press

10 - 15 kg/hr

100-120 kg/cycle
(3 cycles/day)
upto 25% Dryness
Buffer Tank Pump UASB MBBR

58 m3 2 Transfer pump 249 m3 145 m3


17.1 hrs @ 75% COD
4 hrs 22 m3/hr and 85% BOD 10 hrs
reduction

Sludge collection?
Accumulation of
sludge? there is no
Expected volume of
Purpose? To feed sludge generation
methane collection?
consistent neutralised since MBBR
Biogas Volume = 12 -
input to digester and considered, this is
12.5 m3/hr with
to avoid foaming attached growth
methane content 60 ±
inside the digester. system, however drain
5 %.
point shall be provided
at the bottom of
MBBR tank.

Sludge tank Sludge pump

5 m3 2 pump

1 m3/hr
8th 9th 10th

Discharge

Discharge
Flowrate @ cu.m/hr
30 m3/cycle/basin
(6 cycles/day)
Chlorine Contact Tank Multi-Grade Filter Discharge

Discharge

18 m3 2 Pump

2.5 hrs 16 m3/hr

Flowrate @ cu.m/hr
Why do we need this? Why do we need this?
14.80 m3/hr for 23.5
Purpose? Disinfection, Purpose? To remove
hrs operation & Filter
To achieve desired suspended solids at
backwash @ 5
level of Colliform the final treated (TSS
m3/day for 20-30
bacteria at the outlet. - < 50 ppm)
mins.

Filter press Discharge

by APBM
9.7 m3/day

kg solids/hr?
Approx. 4.5 to 5 kg/hr
dry basis.
1st 2nd 3rd

Sump Transfer
OPTION 1 ECONVERT/IWE Equalization Tank EQ Transfer Pump
pump

5.6 m/3hr ₱ 60,226,400


135 m3/day 315 m2
CIF Yangon

Anaerobic (EGSB)
Flare (Methane)

Anaerobic Sludge
Withdrawal Pump

Raw Wastewater
OPTION 1 GOSHU Transfer pump Equalization Tank
Pump
5.6 m/3hr ₱ 51,168,000
135 m3/day 215 m2
DDU Yangon
Filtrate Water

Raw Wastewater
OPTION 2 GOSHU Transfer pump Equalization Tank
Pump
16.7 m/3hr ₱ 42,988,400
400 m3/day 350 m2
DDU Yangon

Sludge Feed Pump

Filtrate Water
4th 5th 6th 7th
Aeration Tank
Stand Pipe (Activated Sludge Degassing Tank
Process)

Discharge by APBM
(Anaerobic sludge)

Filtrate Transfer Filtrate sump


Pump

Reactor Tank
pH Adjust Tank Reactor Feed Pump Aeration 1
(UASB)

Flare (Methane)
Sludge Tank
Sludge Feed Pump

rate Water
Discharge by APBM

Filter Press

pH Adjust Tank Aeration 1 Aeration 2 Sedimentation Tank

Sludge Tank Sludge Control Tank Sludge Settling Tank

Discharge by APBM

Filter Press
8th 9th

Biological Clarifier Discharge

Discharge

RAS/WAS pump

Sludge Holding Tank

Sludge Transfer Feed Pump

Sludge Conditioning Tank

Filter Press Feed Pump

Discharge by APBM

Filter Press Discharge (Aerobic sludge)

Aeration 2 Sedimentation Tank Discharge

Discharge
Sludge Control Tank Sludge Settling Tank

Discharge by APBM

Discharge

Discharge
1 pump
Proposal Scope of works

Flow Diagram

Responsibilities Plant Utilities


Maintenance Cost Utilities Requirement

Gantt Chart
Functional Specifications

Plant and Product Data


Requirement RFP

You might also like