1. The document is a transmittal from a consultant to the main contractor regarding final as-built drawings for infrastructure works on a new chalet project in Abu Dhabi.
2. It includes two structural drawing titles and details for fiber optic pull boxes and splicing manholes.
3. The contractor is asked to acknowledge receipt of the information by signing and returning to the consultant.
1. The document is a transmittal from a consultant to the main contractor regarding final as-built drawings for infrastructure works on a new chalet project in Abu Dhabi.
2. It includes two structural drawing titles and details for fiber optic pull boxes and splicing manholes.
3. The contractor is asked to acknowledge receipt of the information by signing and returning to the consultant.
1. The document is a transmittal from a consultant to the main contractor regarding final as-built drawings for infrastructure works on a new chalet project in Abu Dhabi.
2. It includes two structural drawing titles and details for fiber optic pull boxes and splicing manholes.
3. The contractor is asked to acknowledge receipt of the information by signing and returning to the consultant.
Department of Client Municipalities and Transport Consultant Parsons International Limited Contractor Noor Al Sahara Gen. Cont. LLC Construction of the Infrastructure Works for the New Chalets in Al Alia Project Island in Abu Dhabi Contract No. DMT-CR-067-2022 Transmittal Ref. P465-NAS-PIL-FAB-0037_R0 Date 30-05-2023 No. Transmittal is Co-ordination Review & Com m ents Approval Issued for your
Doc. Type FINAL AS BUILT
I. Information SN Drawing Title Drawing No. Rev. Status Remarks TYPICAL PULL BOX STRUCTURAL DETAILS FOR FOC MANHOLE 1. (NORMAL PULLING PIT) AB-NAS-P465-ELE-FOC-PB-0001 Z TYPICAL PULL BOX STRUCTURAL DETAILS FOR FOC (SPLICING 2. MANHOLE) AB-NAS-P465-ELE-FOC-SP-0001 Z
II. For the Contractor
Eng. Yaser Diab 30-05-2023
Stamp
Name Signature Date
III. Received By Consultant
Stamp
Name Signature Date
IV. Consultant Review and Comments
Checked By: Date: Time:
A - Approved B – Approve As Noted C - Resubmit D – Not Approved
V. For Consultant
Stamp
Resident Engineer Signature Date
VI. Received by Contractor
Stamp
NAS Representative Signature Date
Note: This Approval does not relieve the contractor from any of his contractual obligations 30-05-2023 30-05-2023 19-05-2023
Internal repairing and protective coating
02 coats 02 coats
Coal tar epoxy 02 coats on blinding Coal tar epoxy 02 coats on blinding