DATE:-11.05.

2023

FOUNDATION
JOINT NOTE FOR SPECIAL OHE PORTAL

NAME OF WORK:- Extension OF PF NO 10,11 &12,13 at CSMT.


(Construction of OHE Special Portal foundation at CSMT Yard Old Carnac ROB to Shunting
Neck no.2 buffer End.) side & painted on track on HB line.
7h line
Location of special foundation painted on wall
*****

The following observations are jointly pointed out as under


1. A. Foundation no 1 along 7th line.
a) 0.5 m spacing shifted fromn original CL of portal.
b) Find out S & T cables with location box.
c) 2 NOS CIWater supply pipeline.
d) lno 185 SQ MM LT ALUMINIUM CABLE.
e) 1 no anchor mast loc csmt/1847 to be relocated.

B. Foundation no 1along harbor line line.


a) boundary wall to be broken for machine working.
b) 3 nos electric cable on boundary wall to be relocate.
c) piling machine to be placed by crane from top of carmac bridge.
d) culvert to be filled to for temporary working of machine after work pipe to be
provided for drain.

2. A. FOUNDATION NO 2-7th line


a) 0.5 m spacing shifted from original C/L of portal.
b) Find out S & T cables/Electrical cable 22KV HT cable 2 nos & Ino LT Cable.
c) 2NOS CIWater supply pipeline.
d) Vacantabundant hutment.
e) OFC cable to be relocate

B. FOUNDATION NO.2 HB side


a) boundary wall to be broken for machine working.
b) 3 nos electric cable on boundary wall to be relocate.
) piling machine to be placed by crane from top of carnac bridge.
d) culvert to be filled to for temporary working of machine after work pipe to be
provided for drain.

3. A. FOUNDATION NO 3-7th line


a) 0.5 mspacing shifted from original C/L of portal.
b) Ino 185 SQ MM LT ALUMINIUM CABLE& S &T CABLE
c) 2 NOS CI Water supply pipeline.
d) Occupied hutment.
e) OFC cable to be relocate
f) Ino DP 165 & 1NO JB 355 to be relocate.

B. FOUNDATION NO.3 HB side


a) boundary wall to be broken for machine working.
b) 3 nos electric cable on boundary wall to be relocate.
c) piling machine to be placed by crane from top of Carnac bridge.
d) culvert to be filled to for temporary working of
provided for drain.
machine after work pipe to be
4. A. FOUNDATION NO 4-7th line
a) 0.5 m spacing shifted from original CL of portal.
b) 1no 185 SQ MM LT ALUMINIUM CABLE& S &T CABLE
c) 2 NOSCI Water supply pipeline.
d) Occupied hutment. 2 nos
e) INo OHE portal loc CSMT/1857 to be relocate
) OFC cable to be relocate
B. FOUNADTION HB side
a) a) boundary wall to be broken for machine working.
b) b) OFC cable to be relocate
c) c) for working piling machine permission will be taken from PVT society.
d) d) culvert to be filled to for temporary working of machine after work pipe to
be provided for drain. soil wastage from building to be choked during
execution of work.

NOTE: - Meeting with private hutment owners as per them the land belongs to Mumbai port
trust. Before any mnodification they required permission from Port trust.
After that permission from port trust hutment owners allow to start the work with some
conditions. (like hutment to be made as like before, Rent for relocation till completion of
work, Charges for shifting of material, other expenses.)

Copy to: - for your kind information and necessary action please and early removal of
infringement for starting of work.
SSE/C/DR

2 SSE/GS/CSMT

3 SSE/S&T/C/DR

4 SSE/OHE/C/DR
SSE/CABLE/KURLA(TD)
6 SSE/SIGNAUCSMT

7 SSE/TELE/CSMT
8 SSE/WDI/CSMT
9 SSE/TELEPAREL

10 SSE/OHE/CSMT
SSE/TELE/EXCHANGE/CSMT
M-3150
CHT-5T6-4620MM
210MM

1849 1847
LOC E5B
tutWA1