Cut of level

600
NOTE FOR PILE:

2. YIELD STRENGTH OF STEEL, fy = ( 60,000 psi)


3. 100% COARSE SAND (F.M = 2.5) SHALL BE USED
AS FINE AGGREGATE.
4. 20mm DOWN WELL GRADED SHINGLES CHIPS
SHALL BE USED AS COARSE AGGREGATE.
X X 5. THE LAPPING PORTION OF MAIN REINFORCEMENT
OF PILE SHALL BE JOINT WELDED.
6. TREMIE CONCRETING IS TO BE ADOPTED
WHENEVER WATER IS PRESENT.
7. WHEN CONCRETING TOP LAYER, ALLOW OVERFLOW
OF SCUM AND EXCESS WATER AND GROUT.
8. ADJACENT PILES SHALL BE CAST AFTER 3DAYS.

800 typ.
Concrete blocks shall be placed
for maintaing clear cover
75 CLEAR COVER(TYP.)

Y Y
L = 31200

500
SEC. ON (X-X)
800 typ.

Concrete blocks shall be placed


for maintaing clear cover

75 CLEAR COVER(TYP.)

500
SEC. ON (Y-Y)
600

ENGINEER :
CONSULTANT:
PROJECT NAME:

500
DRAWING TITLE:

LONG SEC. OF PILE


MEPS
1.

8.

9.
7.
6.
5.
3.

4.
2.

12.
11.
10.

STRUCTURE NAME: Barge UNLOADER

PILE LONG SECTION


Dead Load
Wind Speed

Soil Pressure
Seismic Zone

Water Pressure
Wind Exposure

Live Load (At Silo)


Vehicle Impact Load

SHOYEB KAMAL (MIEB-30555).


Live Load (Over Shed)

SHAH CEMENT (KHULNA GHAT)


Response Modification Factor, R

Live Load (Over Barge Unloader)

Live Load (Over Pneumatic Unloader)


LOAD CONSIDERATION

3
2
C

30 Psf.
88 KN/m

90 KN/m

100 Tons.
150 Tons.

400 Tons.
238 Km/h

264 KN/m

Self Weight

SHEET NO: -