Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

Company management records

Year Month Change Point Management Account


Serial Area of Change Production department Quality Control Department
Time of occurrence Change Point Content Disposal measures Complete
number occurrence Point Type Signature Result confirmation Signature
time
1703026-0819, the injection molding machine is
1 2017/9/27 8:00 B4 Machine down during production Repair equipment 9/27/2017 Zhang San Product appearance size OK Li Si

10

11

12

13

14

15

16

17

18
Fill in the items:
1. After receiving the ECN, fill in the account according to the EC implementation time as the time of occurrence; other changes are filled in the account after the quality control is confirmed;
2. After the change point disposal measures are completed, the production department foreman fills in the completion time and signs it, and then the quality control department foreman confirms and signs.

FM-C0902-04-03,Retention Period: 20 years

You might also like