H362038-210-276-0005 NOTES:

DWG. No.
I E-403A/8
GAS/GAS EXCHANGER
GAS/GAS
AREA
EXCHANGER
107.9 m'
AREA 107.9
1.
1.
2.
DRAINS TO BE LOCATED
DRAINS LOCATED AT
BLOWDOWN AND PSV
BLOWDOWN
AT LOW
LOW POINT
POINT IN
IN THE
PSV VALE TO BE LOCATED
THE SYSTEM.
LOCATED AT
SYSTEM.
AT A
A HIGH
HIGH POINT
POINT IN
IN THE
THE
SHELL DESIGN:
DESIGN: UAP 99.3 BARG 54C/-45.6C MDMT SYSTEM.
TUBE DESIGN:
DESIGN: UAP 99.3 BARG 0 HOLD/-45.6'C MDMT 3.
3. INJECTION QUILL WITH INTEGRAL CHECK VALVE PER MOC-493.
4. RO-4030 HAS BEEN TEMPORARY SIZED AS FULL BORE AS A
DOWNSTREAM RO, RO--4031, HAS BEEN SIZED TO PROTECT THE FLARE
SY'STEM FROM
FROM OVERPRESSURE
OVERPRESSURE DURING
DURING MNUAL
MNUAL VENTING
VENTING AND BLOWDOWN,
BLOWDOWN,

--
DUE TO AN UNDERSIZED EXISTING FLARE HEADER CONNECTION. THE
FLARE TIE--IN ROUTE IS PLANNED TO BE MODIFIED IN
IN A FUTURE

�11
PROJECT.
PROJECT. WHEN THE NEW FLARE CONNECTION IS INSTALLED, RO--4030
SHOULD
SHOULD BE RE-SIZED TO MEET AP1--521 REQUIREMENTS ND RO--4031

;;11
SHOULD
SHOULD BE SIZED AS FULL BORE (SCOPE OF ER-377).

ll---.-----------r---------"
--.-----------r---------"�'--
'--""0--
""11--'
0-- 11 --""_-D'
--' _-D'--11----XX-- "--------------<(
"--------------<(� _.us-""" ''11"""oee3:
_.us-" "oee3:::,, ..-,.202=>---(
::11
-,.202=>---(�

33
_
_
AI--JPJ-3":PJ-x -

33 3~3
P-138-2-D1$-X
P-138-2-D1$-X
ds»
ds» dd 1'0.75°
1'0.75°

PG-130-10-D1$-¥
PG-130-10-D1$-¥
0.75°
0.75° 0.75°
0.75°
Ot
Ot -od

7 0.75'0.5
0.75'0.5 7 0.75'0.5
7 0.75'0.5

PG-1.35-8-D1$--X
PG-1.35-8-D1$--X

)
) US-106631-202
US-106631-202
PG--138-3_p1&_.¥
PG--138-3_p1&_.¥ >
s7Es-soof
-soof w
w
re_12go
re_ PG--132-10-D1S-
PG--132-10-D1S-

ll

$$ si1si1
----
ll

==
== kk

> US-loee31 202_


US-loee31
PG-127-10"-015-i
202_
)IT IC
PG-127-10"-015-i )IT )
) 11 1/2°
1/2°
>------�r------11--------s
>------ r------11--------s�ii�1-----';
II
1-----';.. ;; .. .. ;;==...
PG-127-10"-01S-1
PG-127-10"-01S-1 1/2" ICIC I
...;;..;;;.;... ..""-"'-"'---'-'--""=--;.;;._-11---'----..L......fl
""=--;.;;._-11---'----..L......flww
- H
H ,,' «a!me >
NOTE 11
NOTE NOTE 11
NOTE

PEARL DOCUMENT NUMBER:

(( )I HATCH
THIS DRAWING WAS PREPARED FOR THE EXCLUSIVE USE OF PEARL PETROLEUM "CLIENT") AND IS ISSUED PURSUANT TO
KM500 BASIC ENGINEERING BETWEEN CLIENT AND HATCH PTY LTD - ABU DHABI ("HATCH"). UNLESS OTHERWISE AGREED
IN WRITING WITH CLIENT OR SPECIFIED ON THIS DRAWING, (A) HATCH DOES NOT ACCEPT AND DISCLAIMS ANY AND ALL

Pi:AR';f
LIABILITY OR RESPONSIBILITY ARISING FROM ANY USE OF OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY OR ANY
NAME MODIFICATION OR MISUSE OF THIS DRAWING BY CLIENT, AND (B) THIS DRAWING IS CONFIDENTIAL AND ALL INTELLECTUAL

PETROLEUM
PROPERTY RIGHTS EMBODIED OR REFERENCED IN THIS DRAWING REMAIN THE PROPERTY OF HATCH.

SIGNATURE DRAFTSPERSON
DESIGNER EPF NEW GAS-GAS HEAT EXCHANGERS
CHECKER
ENG REG NUMBER
DESIGN COORD.
RESP. ENG. J.ELVIDGE 16/06/20
REVISION DATE LEAD DISC. ENG. PIPING & INSTRUMENTATION DIAGRAM
ENG. MANAGER GAS-GAS EXCHANGERS E-403A/B
ORIGINAL DATE PROJ. MANAGER D. MACDONALD 16/06/20
0 AS-BUILT ER-285 KH HG 2022.01.06

I
DRAWING No. DRAWING TITLE No. DESCRIPTION BY CHK'D DATE ROLE NAME SIGNATURE DATE SCALE DWG. No. REV

REFERENCE DRAWINGS REG. PROFESSIONAL REVISIONS DRAWING APPROVAL STATUS: CLIENT REVIEW
OR AS NOTED
H362038-210-276-0005 I 0