Welding Inspection Report
Welding Type:- GMAW /SMAW / GTAW WPS No:- Date:-...............................
Before Welding During Welding After Final Stage Welding

Wire Size Required Parameter Observation


Job Welding
Welder Name / Welding (mm) & Welding
M/C No. Welding Job/Job ID Thickness Thickness Remark
Welder ID No. Position Make and Current Voltage Gas Flow Current Voltage Gas Flow Status
(mm) (mm)
Batch No. (Amp) (Volts) (LPM) (Amp) (Volts) (LPM)

Note:- P: Porosity, C: Crack, CP: Clustered Porosity, S: Slag, IP: Incomplete Penetration, LF: Lack of fusion, UC: Undercut

Checked By Approved By

RS/WELD/01 ISSUE No. 3


R.S. Infraprojects Pvt Ltd
Welding Inspection Report
Welding Type:- GMAM (MIG) Date:-.......................................
Job Machine Parameter Welding
Welding Welding
M/C No. Welding Job/Job ID Welder Name Thickness Thickness Remark
Position Wire Size Current Voltage CO2 Status
(mm) (mm)
(mm) (Amp) (Volts) (LPM)

Note:- P: Porosity, C: Crack, CP: Clustered Porosity, S: Slag, IP: Incomplete Penetration, LF: Lack of fusion, UC: Undercut

Checked By Approved By

RS/WELD/01 ISSUE No. 2


Required Welding
Welding Classification Weld Joint No.
Parameters
वेल्डिंग वर्गीकरण वेल्ड जोड़ नम्बर
आवश्यक वेल्डिंग पैरामीटर
MIG/MAG Wire Make Current
मिग/मैग वायर मेक करेंट
Wire Diameter Voltage
तार की मोटाई वोल्टेज
Batch No. Gas Flow
बैच नम्बर गैस का प्रवाह
Machine No. Current
मशीन संख्या करेंट
Voltage
वोल्टेज
Gas Flow
गैस का प्रवाह
Observed Welding Quality Observed Remark
निरीक्षण में पाया गया वेल्डिंग गुणवत्ता निरीक्षण में पाया गया टिप्पणी