Professional Documents
Culture Documents
BS7671
BS7671
Initial verification
1. Visual inspection: it is part of initial verification is the process of assessing the installation prior
to testing.
electric motor
indoor DB , outdoor DB
2.1.continuity testing
Ring continuity testing
There are a few methods, and all of the following are acceptable:
multimeters
2.4.Earth fault loop impedance (ELI) testing – fluke 1664FC Multifunction Tester