A 601 Reflected Ceilingplan
A 601 Reflected Ceilingplan
2.292A
ES
NO CEILING
ES IN THIS ROOM
DRY SUPPLY PBK - ARCHITECTS
COOLER STORAGE 11 Greenway Plaza, 22nd Floor
2
Houston, Texas 77046
2.292 IN
NO CEILING 2.292B [P] 713.965.0608
THIS ROOM [F] 713.961.4571
In Assocition With:
MEP Consultant:
TELIOS
CORRIDOR 12946 Dairy Ashford, Suite 130
Sugar Land, Texas 77478
2.209 1 [P] 281.265.1636
[F] 281.265.1608
5
A-620
CLEAN
2.154
AMPLIFIED
STAIRS CLERICAL
2.158
2.244 2.155
AL
OFFICE
IG
2.223 2.157
N
CORRIDOR 2.156
EXISTING CEILING
TO REMAIN 8' - 6" A.F.F. 2.187
Sim
1
SPECIMEN EXISTING CEILING
SR TECH OFFICE A-620 TO REMAIN
PROCESS
2.222 2.199 ELEV. ELEV.
EXISTING CEILING 2.152 2.153
TO REMAIN ELEVATOR LOBBY
2.151
FLOW ELEV ELEV.
CYTROMETRY
2.152 2.153
2.234 CORRIDOR
2.269
CLIENT SERVICES
TELE DATA CYTOLOGY
HOOD 2.197
2.300 2.167
PROCESSING
2.198 Sim
1 NO CEILING TELE DATA
IN THIS ROOM 2.172
EQ
A-620
ES
AL
8' - 6" A.F.F.
4'-4" 13'-0"
IG
NO CEILING IN
EQ
N
4'-4" THIS ROOM
Sim CORRIDOR 8' - 6" A.F.F. ELEC. ALL EXISTING LIGHT
1
CORRIDOR 10 NO2.205
CEILING FIXTURES TO REMAIN
A-620 IN THIS ROOM
2.188 8 ES
EXISTING CEILING
EXISTING CEILING
A-620
OFFICE
TO REAMIN
TO REAMIN
2.219 TECH WORK
S.T. S.T.
8' - 6" A.F.F.
EXISTING CEILING 2.165
2.206 2.207
MICROBIOLOGY
2.220
TO REMAIN
Memorial
OFFICE
Hermann
OFFICE 2.166 Southwest
2.218
6
A-620
2.299
1
0"
2.169B 2.169A
AUDIO/OFFICE 7
Consolidation
EQ
2.216 0"
A-620
AFB - FUNGUS 4'-1
ROOM
EQ OFFICE OFFICE BLOCK ROOM
2.213
2.203 2.202 2.195 FILE ROOM
EQ
TO REMAIN
A-620
4'-
2
EXISTING CEILING
STAIRS TO REMAIN
SCALE: 1/8"=1'-0"
0' 3' 10' Project Number 11154
RCP COORDINATION
1 1' 6' Date 02.14.12
1/8" = 1'-0"
Issue 100% Construction Documents
Drawn By Author
Checked By Checker
Revisions
NO ISSUE DATE
5. THE CONTRACTOR SHALL VERIFY THAT ACCESS PANELS OF TYPE SPECIFIED ARE 8. ALL CEILING GRIDS TO BE CENTERED BETWEEN WALLS U.N.O.
1. THE CONTRACTOR SHALL COMPARE THIS REFLECTED CEILING PLAN WITH 4. SPRINKLER HEADS ARE NOT SHOWN ON ARCHITECTURAL REFLECTED CEILING INSTALLED IN NON-ACCESSIBLE TYPE CEILINGS WHERE SERVICE OR ADJUSTMENT 9.
ELECTRICAL LIGHTING PLANS, MECHANICAL SUPPLY, RETURN, AND EXHAUST PLANS. PLANS. CONTRACTOR TO INSTALL SUFFICIENT HEADS IN ALL SPACES TO PROVIDE TO MECHANICAL, PLUMBING, OR ELECTRICAL ITEMS MAY BE REQUIRED. ACCESS PAINT ALL ELEMENTS AND STRUCTURE EXPOSED ABOVE CEILING
THE CONTRACTOR SHALL REPORT ANY OMISSIONS OR INCONSISTENCIES TO THE ARCHITECT. PANELS SHALL BE EQUAL TO THE RATING OF THE WALL OR CEILING IN WHICH THEY IN OCCUPIED SPACES, INCLUDING STORAGE ROOMS, WORKSHOP
100% COVERAGE AS REQUIRED UNDER NFPA 13 AND OWNERS' INSURANCE AND NEW SERVER ROOM. DO NOT PAINT EXISTING TELE DATA ROOM.
2. SEE ELECTRICAL DRAWINGS FOR THE LOCATIONS OF CEILING MOUNTED SMOKE COMPANIES' REQUIREMENTS. CENTER ALL SPRINKLER HEADS IN CEILING TILES OCCUR.
10. CONTRACTOR SHALL PAINT ALL ITEMS ABOVE THE CELING AT ANY PARTICULAR
DETECTORS, SPEAKERS, EXIT SIGNAGE, AND FIRE ALARM DEVICES, ETC. AND GYPSUM BOARD CEILINGS. REFER TO A-620 FOR MOUNTING DETAILS AT 6. 18" MINIMUM VERTICAL CLEARANCE SHALL BE MAINTAINED BETWEEN THE BOTTOM LOCATION WHERE ANY ITEMS ABOVE CEILING ARE EXPOSED, SUCH AS PERIMETER
ALSO SEE ELECTRICAL FOR LOCATIONS OF WALL MOUNTED EXIT LIGHTS. MONUMENTAL STAIR. REFER TO REFLECTED CEILING PLANS FOR MOUNTING OF THE EXTENDED SPRINKLER HEADS AND THE TOP OF ANY FILES, SHELVING, CEILING CONDITIONS.
LOCATIONS AT ATRIUM BALCONIES AND MONUMENTAL STAIR LANDINGS. LOCKERS, ETC.
3. FOR FURTHER DIMENSIONS SEE LARGE SCALE PLANS, SECTIONS, ELEVATIONS, AND DETAILS. 11. ALL CEILING HEIGHTS ARE 9'-0" U.N.O.
7. ALL CEILING ELEMENTS TO BE PLACED IN THE CENTER OF CEILING TILE OR CENTER
OF GYP. BOARD CEILING AREA U.N.O.
RCP LEGEND
SUSPENDED 2' X 2' ACOUSTICAL SUPPLY AIR GRILLE CJ SOFFIT/GYP
BD/PLASTER CONTROL
CEILING TYPE
9'-0" AFF
CEILING HEIGHT DESIGNATION PER AREA.
WHERE NO HEIGHT IS DESIGNATED, 9'-0".
RECESSED CAN LIGHT FIXTURE GYP. BOARD CEILING A-601
4/5/2012 4:40:59 PM