Professional Documents
Culture Documents
Presentation of Atelier 292, May 2007
Presentation of Atelier 292, May 2007
Corridor Upgrades
May 2007
• Financial (budget)
• Some existing finishes are permanent and may be costly to
remove or modify
• Coordination with other repairs in the building
STAIR
STAIR
ELEV. N0 3 ELEV. N0 4
STAIR STAIR
Lounge Lobby
STAIR
Area
GARBAGE
ROOM
Main Corridors *
LOBBY
CORRIDOR
Lobby
Mail
Boxes
Main Corridors
STAIR
CORRIDOR STAIR
ELEV. N0 3 ELEV. N0 4
STAIR
LOBBY
310
311
Typical Floor Plan (corridors on each floor are actually different)
BALCONY
BALCONY
Existing Conditions – Corridors:
• Pendant fixture
• New artwork
• New flower
boxes
• New lobby
funiture
• New counter
with storage
underneath
• New flower
boxes
Recessed Downlights
Counterpoint 489-94 Look Twice 471-94 Cyclone AC 66770-1 Sublime AC 67472-3 Abacus AC66853-4
LOBBY
Flooring Suggestions:
OPTION 1 & 2
Acrylic paint
Easy to maintain
Cost–effective