5 FF 2 C 38 de 0957043775720

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 92

CAAN : Institutional Profile

Name: Civil Aviation Authority of Nepal (CAAN)


Address: Babarmahal, Kathmandu, Nepal Tel. 4262387, 4262326, 4262518
Fax:977-1-4262516
E-mail: dgca@caanepal.gov.np
URL: caanepal.gov.np

Type : Authority
Date of Establishment: 31 December 1998

Legal Status: Civil Aviation Act, 2015 (1959 AD) - Statutory Regulations
Civil Aviation Authority of Nepal Act, 2053 (1996)- Establishment

Main Functions: Issuance of Operating Certificate to airlines and other aviation business,
Issuance of license and certificates to aviation personnel,
Aviation safety and security oversight,
Regulation of air transport,
Providing Air Navigation Services,
Construction, management and operations of aerodromes,
Implementation of ICAO SARPs, PANS and other Guidance Materials

Affiliation/Institutional Linkages:
Ministry of Culture, Tourism & Civil Aviation, Ministry of Finance, Ministry of Home Affairs, Ministry of
Defense, Ministry of Communication & Information Technology, Department of Hydrology & Meteorology,
ICAO, COSCAP-SA, Airlines, NTB, International Funding Agencies, Public.

Income Resources:
Landing, Parking, Navigation Charges, Security Charges, Housing, Flight Catering Charges, Passenger
Service Charges, ADF, Concessionaries; Vehicle Entry & Parking Charges, Advertisement Charges,
Oil Throughput Charges, Terminal Rent, Land Rent, Royalty, Cargo Charges, Regulatory fees, Ground
Handling Charges, etc.

CAAN Report 2019-20 1


Board of Directors
Chairperson Mr. Bhanubhakta Dhakal

Hon’ble Minister, Ministry of Culture, Tourism and Civil Aviation

Member Joint Secretary, Ministry of Culture, Tourism & Civil Aviation

Member Mr. Suman Dahal

Director General, Department of Customs, Ministry of Finance

Member Mr. Lekh Nath Bhandari

Managing Director, Ample Travels Pvt. Ltd. (From among the Private
Entrepreneurs involved in Tourism Industry)

Member Mr. Mahesh Kumar Guragain

From among the Aviation Experts

Member From among the Female Aviation Experts

Member Secretary Mr. Rajan Pokhrel

Director General, CAAN

2 CAAN Report 2019-20


National Civil Aviation Security Committee

Chairperson Minister or Minister for State of Ministry of Culture, Tourism and


Civil Aviation.

Member Attorney General or a Deputy Attorney General appointed

Member Secretary, Ministry of Finance

Member Secretary, Ministry of Law, Justice and Parliamentary Affairs

Member Secretary, Ministry of Home Affairs

Member Secretary, Ministry of Defense

Member Secretary, Ministry of Culture, Tourism and Civil Aviation

Member Operations Head, Nepal Army, Army Headquarters

Member Inspector General, Nepal Police

Member Inspector General, Armed Police Force Nepal

Member Chief Investigation Director, National Investigation Department

Member Secretary Director General, Civil Aviation Authority of Nepal

CAAN Report 2019-20 3


4 CAAN Report 2019-20
Director General’s Review

T he year 2019 was an excellent year for the


civil aviation sector in Nepal. However, year
2020 encountered one of the worst crises
in the history of aviation due to global contagion
of Corona Virus. The Nepali civil aviation sector
had to face its consequences in the form of flight
restrictions imposed for about six months.
Before the pandemic, significant growth in air
highlighting Nepal’s endeavors to provide better
traffic had been expected with target of two
air transportation service to its people and
million foreign tourists since the Government activities carried out to enhance safety of aviation
of Nepal had declared Year 2020 as Visit Nepal operation in the country.
Year. After about six months of lock-down and
prohibitory order, Nepal resumed its international This report concisely incorporates activities and
and domestic flights in September 2020 with plans of CAAN setting the milestone for future.
certain restrictions and following strict health Some of the key features of the report have
safety measures. Till November 2020, we have been summarized under following sub-headings.
lost about 65 percent of passengers in domestic Air Traffic Scenario
sector and about 72 percent of passengers in
international sector compared to those in the During this period, CAAN delivered safe and
year 2019. This pandemic has also heavily affected effective air traffic control services. In 2020
our major infrastructure projects and other International Aircraft Movement and Passenger
development works. Movement decreased by 74.08% and 68.85%
respectively whereas Cargo Movement increased
Against the backdrop of the pandemic, our priority by 11.36% compared to those in 2019. On the other
today is to ensure safety of travelling public and side, Domestic Aircraft Movement, Passenger
personnel involved in aviation operations to the Movement and Cargo Movement decreased by
extent possible. So far, we have fared well in 65.71%, 67.36% and 68.31% respectively.
safeguarding the public maintaining operational
safety and the aviation business has begun to gear Air Transportation
up to achieve the normal pace of growth. Nepal signed Bilateral Air Services Agreement
Year 2019 was remarkable indeed as the with Australia on 1st October 2019. Since 1963,
Civil Aviation Authority of Nepal left its mark Nepal has signed ASAs with 40 countries, with
vehemently in the international forums of the civil Australia being the latest signatory.
aviation sector. Firstly, the 56th conference of 30 International Airlines (including Nepali
the Directors General of Civil Aviation Authorities Companies) from 14 countries operate
(DGCA) of Asia Pacific Region was successfully international flights to/ from Tribhuvan
organized at Kathmandu from 19 to 23 August International Airport. Meanwhile, in the domestic
2019 registering Nepal as the third time organizer sector, 19 Domestic Airlines have valid AOC.
of DGCA conference since its commencement in Aviation Safety and Security
1963. Secondly, The Director General of the Civil
Aviation Authority of Nepal was unanimously Through out the year Nepal has moved
elected as the Co- Chair of Asia Pacific Air significantly ahead regarding SSP implementation.
Navigation Planning and Implementation Regional Second edition of SSP Nepal, in congruence with
Group (APANPIRG) of ICAO by its 30th meeting Annex 19, second edition, has been issued in
held in APAC Office Bangkok, Thailand from 4 to January 2020. CAAN has completed 77.31% of
6 November 2019. Similarly, Nepal participated in total required SSP foundation (as per ICAO iSTARs
the 40th session of the ICAO Assembly with Hon. SSP Implementation Dashboard). Pursuant to the
Minister Mr. Bhattarai addressing the meeting three phased SSP Implementation Plan, CAAN

CAAN Report 2019-20 5


is almost at the end of its second phase of SSP route surveillance (EMSSR) coverage up to 250
Implementation. First round of exclusive SMS nautical miles.
audit of the airline operators (fixed plus rotor) has
Four ADS-B sensors have been installed at major
been completed and the audit has been running
domestic hub airports and are being brought into
for the second consecutive year now. During
operation soon.
2019, CAAN performed various activities for safety
enhancement including a “Safety Campaign” in PBN implementation plan has been developed as
collaboration with Airlines Operator Association per the guidelines of ICAO’s Regional as well as
of Nepal (AOAN) and World Food Programme Global PBN Implementation Plans. RNAV terminal
(WFP) organizing various trainings, workshops application have been implemented at TIA
and seminars throughout the year. (VNKT), Biratnagar (VNVT), Dhangadi(VNDH) and
Chandragadi (VNCG). ATS automation has been
The diversity of weather patterns together with
introduced at TIA.
hostile topography are the main challenges
surrounding domestic aircraft operations in Nepal. Airport Development and Facilitation Expansion
The topographical complexity of remote Nepal The physical and financial progress of Gautam
allows only altiports that can serve small aircraft. Buddha international Airport (GBIA), as of
In the past, the rate of accident relating to the November 2020, is about 93% and 63%
small passenger aircraft with 19 seats or less was respectively despite notable obstructions like
comparatively high. With joint initiative of CAAN COVID-19 pandemic and Earthquake of 2015.
and airline operators, number of accident and Similarly, Pokhara regional International Airport
fatalities in STOL operations has been reduced has achieved physical and financial progress
significantly now. of 66% and 50.27% respectively. As for Nijgadh
From 16 to 25 October 2019, International Civil International Airport, the first phase development
Aviation Organization (ICAO) conducted aviation works such as acquisition of land, fencing work,
security audit of Nepal under its Universal tree and pole enumeration in the project site have
Security Audit Program, Continuous Monitoring been accomplished partially.
Approach (USAP-CMA) to evaluate aviation Rehabilitation of Runway and Taxiways of
security system and degree of compliance with Tribhuvan International Airport (TIA) was
annex 17 standards and security related provision completed in December 2019. The scope of the
of annex 9 after second cycle audit of 2010. The rehabilitation project was to upgrade the Runway
36th Meeting of National Civil Aviation Security and most of the Taxiways to replace the existing
Committee was also convened in 13 August 2019 deteriorated asphalt pavement with new polymer
which approved sixth edition of National Civil modified bitumen asphalt pavement including full
Aviation Security Program, second edition of reconstruction of Exit taxiway-B and taxiway-E.
National Civil Aviation Quality Control Program Morever, existing runway of TIA has been extended
and the Second edition of National Civil Aviation towards south (02) by 300 meters and additional
Training Program. 300 meters including 60 meters Runway Strip
Air Navigation Services and 240 meters Runway End Safety Area (RESA).
The extension work also included construction
Modernization of Air Navigation Services has
of internal perimeter road, drainage system,
been a key priority for CAAN. VHF air-ground
placement of airfield ground lights and approach
communication coverage has been significantly
lights. Construction relating to ITB expansion
expanded with the commissioning of RCAG-
including of new gate lounge, arrival bus station,
West and RCAG-East stations at Nepalgunj and
additional baggage claim area and reconfiguration
Biratnagar airports respectively in the recent past.
of existing ITB check in area have been completed.
Of the two MSSR-Mode-S Radar Systems that The capacity of International Apron has been
have was commissioned on 1st February 2018, increased along with construction of two new
one has been installed at Tribhuvan International bays for A333 and similar types of aircraft. High
Airport (TIA) for the Terminal Surveillance (TMSSR) Mast LED flood lights in international & domestic
providing coverage up to 200 nautical miles, while apron and helipad area have been installed.
the other standing atop Mount Bhattedanda Runway periphery road from domestic Apron to
(south of Kathmandu) provides extended En- radar station has been illuminated by LED street

6 CAAN Report 2019-20


lights with frangible poles. Baggage Handling was called on 26th April, 2020. The tender has
System installation at Domestic terminal building been awarded and agreement process is ongoing.
and Remote Parking Bay have been completed. Similarly, CAAN has initiated the process of Multi-
Construction of new police barrack building has Airport Common Use Passenger Processing System
been recently completed in order to facilitate (CUPPS) and Baggage Reconciliation System (BRS)
aviation security personnel of TIA. through e-bidding.
Construction of new terminal building, aerodrome Likewise, Centralized Payroll System is in effect
control tower and associated infrastructures whereas Document Digitization Management
have been completed at Janakpur and Rajbiraj System, Fixed Assets Management System,
airports. Runway and taxiway overlay works at Intranet System, Budget Software, Centralized
Bharatpur, Chandragadi, Dhangadi and Simikot Accounting Software etc. have been established
airports together with the apron expansion work and arranged to be accessed from more than 30
of Nepalgunj Airport have been completed. offices and airports through either VPN connection
Civil Aviation Authority of Nepal has prepared or SSL connection.
the master-plans of Biratnagar, Nepalgunj and
Chandragadhi airports to develop these airports Analyzing the financial aspects of CAAN, a
on a systematic and sustainable manner. progressive trend can be observed. The Office of
the Auditor General has certified the Financial
Human Resource Development statement of CAAN for FY 2074/75 which was
As per CAAN Employee’s Regulation 2056, based on the Nepal Financial Reporting Standard
vacancies were announced for 280 positions of (NFRS). Similarly, the irregularity amount (beruju)
different levels. Among those,96 vacant positions has been targeted to be reduced significantly. In
have been replenished through work performance the last fiscal year due to the COVID-19 pandemic
evaluation. Similarly, written examinations have situation, targeted revenue of Rs. 8.33 billion was
been held with results awaited for 22 internal reduced by 45.25%. In addition, targeted Airport
competitions and 140 open/inclusive competitions Development Fund of Rs. 2.21 billion was reduced
in 2019. by 37.55%.
CAA conducted Aviation Security Instructor Closing Remarks
certification course for the first time in Nepali Finally, on behalf of CAAN, i would like to express
aviation history. All 13 participants successfully sincere gratitude to the Goverment of the Nepal,
completed the course. Similarly, CAA conducted ICAO, International and Industry partners and
Security related training course to foreign stakeholders for their contribution to the aviation
nationals for the first time in its history. sector of Nepal. We are confident that this report
In 2020, due to the global contagion of Corona will prove to be resourceful to all concerned and
Virus, all national and international trainings, would like to thank the members of the publication
meetings, seminars, workshops were participated committee for the preparation on and publication
through virtual means by 983 employees. In 2019, of this report.
419 employees attended different seminars,
workshops, induction and field-based domestic
trainings whereas 398 employees participated in
international training, seminar, workshops and
conferences organized by International Institutes
and organizations including ICAO and CANSO.
Similarly, 200 employees attended online training
course in various topics.
Corporate and Institutional Strengthening
CAAN has initiated the process of Data Center
through e-bidding. The invitation for bids for
Supply, Installation and Commissioning of
Modular Data Center, Networking and Data
Security Infrastructure (NCB-01-CPMD-2076/77)

CAAN Report 2019-20 7


8
Organization Structure

Civil Aviation Authority of Nepal

National Civil Aviation Board of Directors


Security Committee
Audit Committee

CAAN Report 2019-20


Director General
Experts Group Board/DGCA Secretariat

Aviation Safety & Gautam Buddha TribhuvanInternational


Aviation Services Civil Aviation
Security Regulation Corporate Directorate International Airport Airport Civil Aviation
Directorate Academy
Directorate Civil Aviation Office Office

Air Navigation
ANS Safety Standards Corporate Planning Division Flight Operations ATS Faculty
ATM Department
Department and Monitoring Department
Department Engineering Faculty
Airport Operations
Com & Nav. Aid Airport Operations
Flight Safety Standards Division RFF Faculty
Department Department
Department
Civil Engineering AVSEC Faculty
Aerodrome Safety CNS Department Division Technical Service
Human Resource Department Course Development
Standards Department Division
Department
AIM Department Electro Mechanical
Civil Engineering Flight Safety
Aviation Security Division
Division Training
Department
Aerodrome Engineering
Department Management Services Quality Assurance
Corporate Division
ICAO, Int'l Affairs and Division
Legal Electro-Mechanical Administration
Department Department Administration Section
Division
Safety Management Rescue and Firefighting
Division Department Finance Section
Finance Division
Domestic Airport
Air Transport Division
Facilitation Department

Administration Internal Audit


Finance Department Major Projects
Department Department
Abbreviations
AC Asphalt Concrete
AGL Airfield Ground Lighting
AIP Aeronautical Information Publication
AMHS Automatic Message Handling System
AMSL Above Mean Sea Level
ANS Air Navigation Services
AOC Air Operator Certificate
ASA Air Services Agreement
ATCEP Air Transport Capacity Enhancement Project
ATM Air Traffic Management
ATS Air Traffic Services
AVSEC Aviation Security
BASA Bilateral Air Services Agreement
CAA Civil Aviation Academy
CAAN Civil Aviation Authority of Nepal
CANSO Civil Air Navigation Services Organization
CASP Civil Aviation Security Program
CNS Communication Navigation Surveillance
COSCAP Cooperative Development of Operational Safety and
Continuing Airworthiness Program
DME Distance Measuring Equipment
DVOR Doppler Very High Frequency Omni Directional Radio Range
EU European Union
FDP Flight Data Processor
GAUC Gautam Buddha Airport Upgrading Components
IAP Instrument Approach Procedure
ICAO International Civil Aviation Organization
ICVM ICAO Coordinated Validation Mission
MIS Management Information System
MSDPS Multi Sensor Surveillance Data Processor
NCAR Nepalese Civil Airworthiness Requirements
NDB Non Directional Beacon
NFRS Nepal Financial Reporting Standards
OLS Obstacle Limitation Surface
PAPI Precision Approach Path Indicator
PELR Personnel Licensing Requirement
RCAG Remote Control Air Ground
RFF Rescue and Fire Fighting
RWY Run Way
TMSSR Terminal Monopulse Secondary Surveillance Radar
SARPS Standards and Recommended Practices
SATIDP South Asia Tourism Infrastructure Development Project
SCM Steering Committee Meeting
SID Standard Instrument Departure
SMS Safety Management System
SSC Significant Safety Concern
STAR Standard Terminal Arrival Route
USOAP Universal Safety Oversight Audit Program

CAAN Report 2019-20 9


CAAN Report 2019-20 Publication Committee

Patron
Mr. Rajan Pokhrel
Director General

Editor-in-Chief
Ms. Ritcha Sharma
Deputy Director

Editors
Mr. Gyanendra Bhul, Dy. Manager
Mr. Prajwal Dhungana, Dy. Manager
Mr. Bishal Paudel, Officer

Publisher
Civil Aviation Authority of Nepal (CAAN)
Babarmahal, Kathmandu Phone: 01-4262416
Fax: 977-1-4262516
Email: dgca@caanepal.gov.np
misprpd@caanepal.gov.np
Website: www.caanepal.gov.np

Layout:
Touch Creation Pvt. Ltd.
Bagbazar, Kathmandu,
Tel: 01-4215448, 9841386218

Printed By:
Manakamana Enterprises
Kathmandu
Contact: 01-4218567, 9851102967

10 CAAN Report 2019-20


Contents

International Activities 1
National Activities 9
Aviation Safety and Security 25
Airport Status 29
Air Transport 42
Projects 49
Financial Information 55
Statistics 60

CAAN Report 2019-20 11


12 CAAN Report 2019-20
International
Activities

CAAN Report 2019-20 1


56th DGCA Conference Inaugurated by Rt. Hon’ble PM

T he 56th Conference of the Directors General


of Civil Aviation Authorities (DGCA) of Asia
Pacific Region was successfully organized
at Kathmandu from 19 to 23 August 2019 with
The opening of the conference, held on 19 August
2019, was inaugurated by Rt. Honorable Prime
Minister of Nepal Mr. K. P. Sharma Oli. Honourable
Minister for Culture, Tourism and Civil Aviation Mr.
Yogesh Bhattarai and Honourable State Minister
the theme of "Harmonizing Efforts to Meet the
Capacity Constraints." International Civil Aviation for Culture, Tourism and Civil Aviation Mr. Dhan
Organization, Asia Pacific Office (ICAO, APAC Office) Bahadur Budha together with the President of the
has been organizing this conference annually ICAO Council Dr. Olumuyiwa Benard Aliu, Regional
since 1963 in various countries of this region Director of Asia APAC Office Mr. Arun Mishra were
with an objective of maintaining cooperation also present in the ceremony.
and harmonization among countries of the Asia On the occasion, the ICAO flag commemorating its
Pacific region to ensure safe, secure, efficient and 75th anniversary that had been hoisted atop Mount
economically sustainable development of civil Everest on 23rd March 2019 was handed over to
aviation. This was the third time Nepal hosted ICAO Council President Dr. Aliu by Honourable
such conference after hosting the 14th and 34th Minister for Culture, Tourism and Civil Aviation
conferences in 1978 and in 1998 respectively. Mr. Yogesh Bhattarai. The ICAO TRAINAIR-PLUS
All together 411 Guests and Delegates (including full membership certificate that the Civil Aviation
Exhibitors and Accompanying Persons) from Academy had received this year on 17 January was
different States and Organizations participated handed over to the Director General of CAAN Mr.
in the conference with delegates from 35 States/ Rajan Pokhrel by Dr. Aliu.
Administrations of this Region, and one State, The technical Session of the Conference was
UAE, from Middle East. 57 delegates from various chaired by Mr. Rajan Pokhrel, Director General of
organizations including ICAO also participated in the Civil Aviation Authority of Nepal whereas the
the conference. vice-chairman was Air Vice Marshal M. Mafidur

2 CAAN Report 2019-20


Rahman, Chairman, Civil Aviation Authority only.
of Bangladesh. The ICAO team led by Dr. Aliu The five-day Conference adopted 35 Action
included Regional Director of ICAO APAC Office, Items (Decisions) of common interest of the
Members of ICAO Council, Directors of different States/Organization of APAC Region relating to
Divisions of ICAO Headquarters and Officials from international civil aviation..
ICAO Regional Office. Besides the regular technical session, the
All together 59 Discussion Papers and 61 conference also provided platform for many side
Information papers were presented in the meetings which were held between different
conference. Nepal presented discussion on the States and Organizations. CAA Nepal held
Theme Topic entitled "Constraints in Safety talks with the Federal Aviation Administration
Oversight to Cope Growing Aviation Activities". (FAA), Executive Director of European Aviation
Nepal also presented two more discussion papers Safety Agency (EASA), Airport Authority of India
and one information paper on the contemporary (AAI), Civil Air Navigation Services Organization
issues of international civil aviation. (CANSO), the Director General of Republic of
The conference conducted a panel- Korea, the Deputy Administrator of Civil Aviation
discussionon"Harmonizing Efforts to Meet the Administration of China to mention a few. The side
Capacity Constraints – Role of Industry Partners". meetings covered topics related to safety, security
During the conference two separate workshops and mutual cooperation.
were conducted on the topics - The conference was concluded on 23rd August
1)  Human Resource Development Commitment 2019 with formal proceedings that included
and 2) Beijing Declaration – Report Card on turnover of ICAO flag to the host of 57th Conference
Beijing Declaration Commitments. Similarly, (Civil Aviation Authority of Bangladesh) by the
DGCA’s Round Table discussion on Second APAC Director General of the Civil Aviation Authority of
Civil Aviation Ministerial Conference - What next? Nepal and cultural shows to mark the closure of
was also conducted exclusively among the DGCAs the conference.

CAAN Report 2019-20 3


4 CAAN Report 2019-20
Nepal Participates in the 40th Session of ICAO Assembly

A six-member delegation headed by Hon.


Minister for Culture, Tourism and Civil
Aviation Mr. Yogesh Bhattarai attended the
40 Session of ICAO Assembly held in Montreal,
th
During Assembly Sessions, ICAO’s complete work
programme in these fields is reviewed in detail
through these papers.
During the Assembly, election for the ICAO Council
Canada on 24 Sep- 04 Oct 2019. Other members for next three year term was held.  The Council is
in the delegation were H.E. Mr. Bhrigu Dhungana, composed of 36 member states.
Ambassador, Embassy of Nepal, Canada, DG CAAN During the Assembly, Nepali delegation had
Mr. Rajan Pokhrel, Joint Secretary, MoCTCA, Mr. sideline meetings with India, China and Myanmar.
Suresh Acharya, Joint Secretary, Ministry of Law, Memorandum of Understandings with ICAO TCB
Justice and Parliamentary Affairs, Mr. Dhanaraj and ASA with UAE and Australia were concluded
Gyanwali and DDG CAAN Mr. Narendra Bahadur during the Assembly.
Thapa. Similarly, Director Mr. Deepak Baral, CAAN
and Dy. Director Mr. Suwarn Raj Upadhyay, CAAN USAP- CMA Conducted in Nepal

I
also participated in the Assembly meeting in the
capacity of Advisor. nternational Civil Aviation Organization (ICAO)
conducted aviation security audit of Nepal
The ICAO Assembly​ is the sovereign body which under its Universal Security Audit Program,
meets at least once every three years. ICAO's Continuous Monitoring Approach (USAP-CMA)
193 Member States and a large number of from 16 to 25 October 2019 to evaluate aviation
international organizations are invited to the security system and degree of compliance with
Assembly. 2015 delegates from 184 member annex 17 standards and security related provision
states and 387 observer delegates from different of annex 9 after second cycle audit of 2010. The
international organizations participated in this audit team was composed of 4 members in the
session of the Assembly. leadership of Mr. David Wilkinson from ICAO
On the first day of the plenary meeting, the head office, Montreal, CANADA. The USAP-CMA
president of the Assembly was elected. Hon. audit covered 9 audit areas. During the audit, the
Minister Mr. Bhattarai addressed the 40th team visited Tribhuvan International Airport, Civil
Assembly meeting in which he highlighted Nepal's Aviation Academy and other concerned offices of
endeavors to provide better air transportation Nepal government. The team convened pre-audit
service to its people and activities carried out briefing (entry) meeting at the beginning and post-
to enhance safety of aviation operation in the
country.

 Hon. Minister Yogesh Bhattarai addressing the


ICAO Assembly
There were around 500 assembly papers related
to Administrative Commission, Economic audit briefing (exit) meeting at end of audit with
Commission, Executive Committee, Legal all major stakeholders of national level associated
Commission, Plenary, and Technical Commission. with the aviation security in Nepal.

CAAN Report 2019-20 5


Director General of CAAN Elected Bhattarai, and Finance Minister of UAE, Sultan bin
Saeed Al Mansoori, signed the agreement.
as the Co- Chairperson of APANPIRG

T
On the Occasion, Minister Bhattarai stated that
he Director General of the Civil Aviation
Authority of Nepal, Mr. Rajan Pokhrel, has
unanimously been elected as the Co- Chairperson
of Asia Pacific Air Navigation Planning and
Implementation Regional Group (APANPIRG)
of ICAO by its 30th meeting held in APAC Office
Bangkok, Thailand from 4 to 6 November 2019.
The meeting was attended by 151 participants
from 22 Member States, 2 Special Administrative
Regions of China, 8 International Organizations
(AAPA, CANSO, EUROCONTROL, IATA, ICAO,
ICCAIA, IFAIMA and IFALPA).

the agreement has created an environment of


mutual co-operation between two countries and
as well as promote the Visit Nepal 2020 campaign.
Similarly, Nepal and Australia signed an air service
agreement in Montreal, Canada on 30 September
2019. The agreement was signed by Mr. Suresh
Acharya, Joint Secretary of Ministry of Culture,
Tourism and Civil Aviation from Nepal and Mr.
Jim Wolfe, Executive Director of the Ministry
of Federal Infrastructure, Transport, Urban and
Regional Affairs on behalf of Australia.

EASA 7TH ICF- 2019

E uropean Aviation Safety Agency (EASA)


organized 7th International Cooperation Forum
(ICF) in Montenegro from 10th to 12th September
All ICAO Contracting States, who are service 2019. At an invitation extended by Executive
providers in an air navigation region and part of Director of EASA, CAA Nepal was represented by
that region’s ANP, are included in the membership DG of CAAN and Mr. Raju Shrestha, chief of Flight
of that region’s PIRG. Furthermore, user States are Safety Standard Department.
entitled to participate in any other PIRG Meetings
as a non-member. International Organizations The programme was attended by various aviation
recognized by the Council may be invited as authorities from Asia, Africa and South America
necessary to attend PIRG meetings as observers. apart from Regional Safety Oversight Agencies.
The Forum focused on International cooperation
Nepal signs ASA with UAE and for the better safety oversight, Regional and
Australia sub-regional cooperation for safety oversight,
emerging risks and opportunities in aviation,
T he Government of Nepal and the Government
of UAE signed a revised Air Service Agreement
on 28th September 2019 during the sideline
meeting the environment challenge, leadership
within the aviation sector, common challenges
of regulators and other burning issues such as
meeting of 40th General Assembly of the Drones and Cyber security.
International Civil Aviation Organisation. Minister
for Culture, Tourism and Civil Aviation, Mr. Yogesh CAA Nepal availed the 7th EASA ICF on various
sideline meetings. The meetings were held with

6 CAAN Report 2019-20


Nepal Signed MoU with ICAO for
Technical Cooperation Project

various agencies including EASA and EC apart


from various authorities. The major points have
been discussed below:
a. Meeting with EASA
The Nepalese team headed by Director
General of CAA Nepal held discussions with
EASA team headed by Executive Director Mr.
N epal signed a Memorandum of Understanding
(MoU) with ICAO for a Technical Cooperation
Project that will assist in the separation of regulator
Patrick Ky. The major issues of discussion were and service provider functions of CAAN. The
as following. project is entitled "Assistance in the separation
· Cooperation from EASA in forms of SARI of Air Navigation Service Provider Functions from
· Future harmonization of regulation in OPS civil aviation regulatory functions in Nepal."
and FCL As per the MoU, two ICAO experts, i.e.
· Service of CAA International for the Organization/Civil Aviation Advisory Expert and
conduct of FCL examination from 1 January Human Resources Management Expert shall be
2020. provided by ICAO, TCB for technical assistance.
· Both sides agreed to sign an MOU on the The MoU was signed by DG, CAAN Mr. Rajan
mutual cooperation during 40th Assembly Pokhrel and ICAO Secretary General Ms. Fang Liu.
of ICAO. A sample MOU has been prepared
and will be signed between two parties Sixth Steering Committee Meeting
during A40 in ICAO. between CAAN and DGAC France
· Nepal’s progress toward flight safety and
possibility of lifting out from air safety list
of European Commission.
I n accordance with provision of technical MOU
signed between CAAN and DGAC France in
September 2017, the 6th SCM meeting was held
b. Meeting with European Commission online on 14 December 2020. The objective of the
· Director General of CAA Nepal and head of steering committee was to review the progress
Nepali delegation raised issue of possible of action items agreed in 5th SCM held in June
removal of Nepal from air safety list of 2020, define roadmap for ongoing existing action
European Commission. The European items and propose new action items to support
Commission side was headed by Mr. the fundamental safety principles outlined in the
Joachim Luecking. Nepali side presented MOU. The Nepali delegation comprised of high
recent progress in flight safety urging the level officials headed by the Deputy Director
Commission to send a technical mission to General of Civil Aviation Safety Regulations
Nepal. The Commission noted the progress Directorate (CASRD). The action items agreed
of Nepal and indicated positively the during the meeting are in implementation phase
possibility of sending a mission in Nepal in and it is believed to support in safety oversight
suitable time. capacity building efforts of Nepal.

CAAN Report 2019-20 7


6th ICAO Global Training and TRAINAIR PLUS Symposium

6 th ICAO Global Aviation Training and TRAINAIR PLUS Symposium was held in New Delhi, India in 4-6
December 2019. A three member delegation led by Mr. Devananda Upadhyay, Chief of Civil Aviation
Academy participated in the Symposium. The Symposium brought together over 400 delegates from
the civil aviation training field to exchange ideas and insights on the importance of innovation for the
training of civil aviation professionals worldwide.

Twenty-four new or upgraded TRAINAIR PLUS Members from 22 States and two International
Organizations were recognized at the Opening Ceremony. Nepal is among ICAO's TRAINAIR PLUS
Members.

36th IFATCA Asia Pacific Regional Meeting 2019

C ivil Aviation Authority of Nepal officially sponsored the 36th IFATCA Asia Pacific Regional Meeting
2019 organized in Kathmandu, Nepal by Nepal Air Traffic Controllers’ Association from Nov.21-
23,2019. With the theme ‘Human and Technology’ Nepal hosted this type of IFATCA event for the third
time, post successful hosting of the 21st IFATCA APRM in 2004 and 51st IFATCA Annual conference
in 2012. It was a vital and illustrious gathering of the high level aviation professionals, Directors and
delegates from 19 Asia and the Pacific Regional countries, IFATCA members and representatives from
international aviation industries.

8 CAAN Report 2019-20


National
Activities

CAAN Report 2019-20 9


Runway Rehabilitation at TIA taxiway pavement work started on 1st September

R ehabilitation of Runway and Taxiways of 2019 and all civil works were completed on
Tribhuvan International Airport (TIA), planned 15 December 2019. Similarly, AGL works were
under the Air Transport Capacity Enhancement completed on 20 Dec 2019.
Project (ATCEP), was completed in December Runway Extension at TIA

E
2019. The scope of the rehabilitation project was
xisting runway of TIA has been extended
to upgrade the Runway and most of the Taxiways
towards south (02) by 300 meters and additional
to replace the existing deteriorated asphalt
300 meters including 60 meters Runway Strip
pavement with new polymer modified bitumen
and 240 meters Runway End Safety Area (RESA).
asphalt pavement including full reconstruction of
The work was started on January 02, 2019 and
Exit taxiway-B and taxiway-E. Installation of new
final asphalt surface course completed on May
Runway center line light and repair of edge lights
29, 2020. The existing Runway and Threshold
were also in the scope of the project.
Markings and the Airfield Lights were displaced
at temporary position (120-meter north from
Runway End 02) on March 31, 2020 for runway
extension construction works. After completion
of runway pavement works, existing Runway
Threshold Light, and Precision Approach Light at
Runway 02 End were reinstated at their original
position on June 02, 2020 along with pavement

Milling of Existing asphalt pavement in progress


The contract agreement was signed between Civil
Aviation Authority of Nepal and China National
Aero Technology International Engineering
Corporation on 5 November, 2018 to complete
the project in 18 months.

AGL works

The first stage of Runway pavement work and


Airfield Ground Light work was performed from
April 2019 to end of June 2019. During rainy season
of July – August, the sub-surface drainage work,
open channel drain and AGL works were carried
out. The second stage of runway pavement and

10 CAAN Report 2019-20


Expansion and Re- configuration of system, flight information display system and
International Terminal Building at TIA associated MEP works, out of which 85% of the
overall works has been completed till November
T IA expansion project ATSEP/NCB02,
commenced on November 15, 2017, includes
expansion of ITB, reconfiguration of existing ITB
30, 2020 including extension of ITB to include
new gate lounge (departure gates), arrival bus
station,installation of new baggage handling
at airlines check-in area, relocation of check- system at departure area, additional baggage
in security screening area, passenger lounge, claim area and reconfiguration of ITB airlines
immigration and custom area, installation of check-in area.
BHS at departure check-in area, airport security

CAAN Report 2019-20 11


Expansion of International Apron at TIA Installation of Lighting System at TIA

T he expansion work of international apron


that started from 22 December, 2016 has
been completed on 15 July, 2020 along with
T en High mast LED Flood lights have been
installed at the international, domestic
aprons and helipad area of TIA. Similarly,
the construction of two new international bays Runway periphery road from Domestic apron
for A333 and similar type of aircraft. This has to Radar station has been illuminated by the
resulted in the minimization of air hold as well as installation of street lights with frangible poles.
ground delay that used to be caused due to the Moreover, different new light installation works
unavailability of parking bays for international related to airfield and general lighting systems
airliners. have been accomplished at TIA optimizing the
level of security through increase in respective
surveillance coverage.

Construction of RCC Building for


Police Barrack at TIA

O n 23rd November, 2020, Honourable Minister


for Culture, Tourism and Civil Aviation Mr.
Yogesh Bhattarai inaugurated the RCC building
of Police Barrack at the premises of TIA. The
building has been constructed with an objective
to enhance the security at TIA and consists of all
necessary accommodation facilities for security
personnel working at TIA.

12 CAAN Report 2019-20


Construction of new Terminal
Buildings at Janakpur and Rajbiraj
Airports

O n 8th Dec. 2020, the new terminal


building with steel structure,
aerodrome control tower and associated
infrastructures at Janakpur Airport were
inaugurated by Minister for Culture,
Tourism and Civil Aviation Mr. Yogesh
Bhattarai amidst program attended by high
level government officials and topknots of
Province no. 2. The completion of long time
impended project of this airport is supposed
to enhance the flight movement, passenger
facilitation and the aviation connectivity
to Mithila Region,hence unleashing the
cultural and religious significance of the
land of Janaki. Similarly, construction of
new Terminal building has been completed
at Rajbiraj Airport. New Terminal Building at Rajbiraj Airport

Inauguration of New Terminal Building at Janakpur Airport

Inaugural & Test Flights at different


STOL Airports

W ith the objective of resuming


connectivity to the adjourned remote
airports, inaugural flights on Baitadi, Bajhang
and Doti Airports were successfully carried
out on 3rd October,2020 by the team of
Honorable Minister for Culture, Tourism and
Civil Aviation Mr.Yogesh Bhattarai and Director
General of CAAN ,Mr. Rajan Pokhrel. It has
helped materialize the governmental motive
of enhancing the regional and provincial
inter-air connectivity in Nepal. Similarly,
test landing was successfully conducted at
newly built Khiji-Chandeswori airfield of
Okhaldhunga district on 23rd December 2019 Test flight at Bajhang Airport
by a twin otter aircraft belonging to Tara Air.

CAAN Report 2019-20 13


Other Progress in Domestic Airports

R unway, Taxiway and Apron overlaying works


were carried out at Nepalgunj, Bharatpur,
Chandragadhi, Simikot, Bajhang and Rara airports
during current and last fiscal years among which
most of them were completed before targeted
deadline. Gravel runway construction was
completed and test flight was carried out on 7th
Poush 2076 at Khiji Airport. Terminal building
expansion work in Lukla airport and the fencing
works, construction of security quarter, drainage
works, etc. at different domestic airports have Piling work at Rara Airport
been completed. Piling work at Rara Airport has
been completed whereas River Training work
at Ramechhap Airport, Runway extension plus
obstacle clearance work at Taplejung Airport,
construction of New Rigid Helipad along with
separate Heli-Terminal are being carried out.
Constructions of Terminal buildings at different
airports are in progress and the design & estimation
works for Terminal buildings construction at
Nepalgunj, Biratnagar and Ramechhap have been
completed. The drainage work at Illam Airport
has been completed and its base work is near
completion. Asphalt concrete Pavement works
are undergoing in Baglung, Masinechaur, Kalikot,
Illam Sukilumba and Gulmi Resunga Airports. Runway overlay at Simikot Airport

Data Center for CAAN

A Data Center for CAAN is under construction


at Tribhuvan International Airport, at
the Operation Building next to the Briefing
engineered modules and components to offer
scalable data center capacity with multiple power
and cooling options. Modules can be shipped
Room. The Project for The Supply, Installation to be added, integrated or retrofitted into an
and Commissioning of Modular Data Center, existing data center or combined into a system of
Networking and Data Security Infrastructure modules. Modular data centers typically consist
(NCB-01-CPMD-2076/077) was initiated on 26th of standardized components.
May, 2020. Once the data center for CAAN is completed, it
A data center is a dedicated space used to house will be the central repository for data. This project
computer systems and associated components, is intended to develop the ICT infrastructure with
such as telecommunications and storage systems. proper networking and data security infrastructure
Since IT operations are crucial for business and to integrate into a single infrastructure
continuity, it generally includes redundant or monitoring system. Placed at TIA, the data
backup components and infrastructure for center will connect systems and applications at
power supply, data communication connections, Head Office with all other intended airports and
environmental controls and various security will act as a data repository, backup and central
devices. connection for all other applications and systems
The data center CAAN is building is a modular one. at CAAN.
Modular data center systems consist of purpose-

14 CAAN Report 2019-20


PBN Flight Procedures of Domestic
Airports

G NSS based PBN instrument flight procedures


RNP1 SIDs/STARs and RNP APCH and
associated Missed Approach Procedures have
been Designed for Janakpur, Rajbiraj, Biratnagar
and Bharatpur Airports. These Procedures will
enhance safety and efficiency of the aircraft
operations and also enhance airspace capacity
to materialize the National PBN Implementation
Plan of Nepal. Instrument flight procedures of
Janakpur Airport have been published through
AIP Supplement. Instrument flight procedures
of Rajbiraj and Biratnagar Airports are in the
process of being published in the AIP supplement.
Instrument flight procedures for Bharatpur airport
are in the process of being validated. RNP2 routes
for the domestic operation have been designed
and are in the process of being published.

CAAN Report 2019-20 15


CDM Software in TIA: An Aid for ATC Runway Strengthening work at
Automation Installation of ADS-B Sensors at airports

N ew technologies, digitization and artificial of Nepal

F
intelligence are the major contributors for our Automatic Dependent Surveillance-
enhancing capacity and efficiency of overall air Broadcasting (ADS-B) Sensors have been
traffic control system. In order to achieve supposed installed by CAAN at Phulchoki, Dhangadhi,
competitive advantages, it seems appealing to Bhairahawa and Nepalgunj. The purpose of the
implement new technologies for balancing the system is to extend the surveillance coverage
demand and capacity in air transportation. within the airspace of Nepal. The ADS-B System
Successful Introduction of a prototype web-based installed at Phulchoki Repeater station will
CDM-Software at TIA in Oct. 2019 along with improve surveillance facility in the Kathmandu-
various interaction and familiarization programs Lukla track.
organized between ATCOs and Domestic/
International Operators have facilitated The data collected from various ADS-B sensors
the sharing of accurate, timely and quality are integrated into existing Multi Sensor Data
information between these major stakeholders in Processing System (MSDPS) located at TIA via
order to achieve common situational awareness leased lines so that controlled surveillance
and to improve operational efficiency and traffic extension is achieved. Similarly, monitoring
predictability. The software has supported system at domestic airports are facilitating ATCs
efficient use of resources along with individual of respective airports to monitor aircraft flying in
access, understanding the preferences and the airspace within their jurisdiction.
constraints among stakeholders. It has helped for
coordinated, collaborative and effective execution
Baggage Handling System at Domestic
of flight movement analysis and planning that has Terminal
resulted in significant reduction in ground delays
of the traffics. H onorable Minister for Culture, Tourism and Civil
Aviation Mr. Yogesh Bhattarai inaugurated the
Baggage Handling system at domestic terminal of

The surge of automation efforts started with Tribhuvan International Airport on 6th September
the introduction of DIFLIS- Electronic flight Strip 2019.
System against the use of age-old system of The system facilitates the arriving passengers
paper-strip. This system has supported ATCOs for the smooth collection of their luggage. The
with an enhanced workflow, dramatically installation is a part of the airport upgrading
replacing the relevant information sharing and project.
the coordination works by silent communications. Interaction programme on "Monsoon
Similarly, Infomax- Integrated Information system Operation Safety Preparedness"
with consistent user interface has reduced visual
workload of the controllers by integrating ATC- An interaction programme on "monsoon
related information including meteorological data, operation safety preparedness" was conducted at
AMHS messages & NOTAMS, information from CAAN Head Office on 14 July 2019 in presence of
NavAids& ATIS, access to soft copies of essential the DG of CAAN, Mr. Rajan Pokhrel, Chairman of
documents, integrated airfield lighting monitoring NAC Mr. Madan Kharel, Officials of CAAN and the
& control capabilities, ultimately reducing the CEOs and Operation Directors of Airline Operators
CWP cluttering. of Nepal.

16 CAAN Report 2019-20


On the occasion, safety measures to be adopted
during monsoon, past monsoon circulars, role of
every stakeholder for safety enhancement during Authority of Nepal.
monsoon were reviewed. The preparedness of The programme was successful in imparting
every airline operator and precautions taken by knowledge on information rights and meaningful
them to ensure safe monsoon operations were use of information and also in bringing out an
shared and discussed during the programme. insightful discourse in the issue regarding the
need and proper use of information in modern
Third JCC Meeting Held day context.
The third meeting of the Joint Coordination
Committee (JCC) for the Project for Capacity Nepal Celebrates ICAO Day
Development in operation and maintenance of International Civil Aviation Day was celebrated
aviation safety equipment was held in Kathmandu on December 7, 2020 in Nepal to commemorate
on 27 November 2019. the 76th anniversary of the establishment of ICAO
The meeting was participated by the officials of through the historical Convention on International
the Civil Aviation Authority of Nepal (CAAN) and Civil Aviation on theme ‘Advancing Innovation
the representatives from the Japan International for Global Aviation Development’. To mark the
Cooperation Agency (JICA). day, a brief ceremony was organized at TIA in the
gracious presence of Honourable Minister for
Culture, Tourism and Civil Aviation Mr. Yogesh
Kumar Bhattarai.
Every year, this day is observed by the aviation
fraternity of Nepal with great enthusiasm.
Different events such as talk shows, workshops,
morning processions are organized each year on
this special day. However, this year the programme
was kept short owing to the hazards posed by the
The progress of the activities and the achievements COVID-19 pandemic. Amidst a formal ceremony
of outputs, modifications of the plan of operation, organized at TIA, Honorable Minister for Culture,
upcoming activities and other issues of mutual Tourism and Civil Aviation Mr. Yogesh Bhattarai
interest were discussed during the meeting. Both hoisted the National Flag of Nepal and ICAO Flag.
sides agreed to extend the mutual cooperation in Officials of the Ministry of Culture, Tourism and
the days to come. Civil Aviation (MOCTCA), Civil Aviation Authority
Interaction Programme on Right to of Nepal (CAAN), Airline Operators Association
of Nepal (AOAN), Nepal Army, Nepal Police and
Information media personnel had gathered at TIA on this
An interaction programme on "Right to occasion.
Information" was organized at the Civil Aviation
International Civil Aviation Day is being observed
Authority of Nepal Head Office on 5th September
all over the world on 7th December every year
2019. The programme was attended by the
Chief Commissioner of National Information since 1994. ICAO, through Assembly Resolution
Commission Mr. Krishna Hari Baskota and A29-1, decided to celebrate International Civil
Commissioner Mr. Kiran Kumar Pokhrel and was Aviation Day to mark the 50th anniversary of the
chaired by the Director General of Civil Aviation Organization, created on 7 December 1944.

CAAN Report 2019-20 17


Get Airport Ready for Disasters (GARD)
rolled out to strategic Domestic Airports
Civil Aviation Authority of Nepal (CAAN) carried
out two missions on Get Airports Ready for
Disaster (GARD) in Nepalgunj and Dhangadhi
airports in November 2019, with technical
support from Deutse Post (DP) DHL and United
Nations Development Programme (UNDP) as aeronautical data quality, and the requirements
GARD Local. The initiative was carried out with of data originators.
an aim of strengthening readiness of respective About 65 professionals participated from
domestic airports for disaster response. These two different organizations including CAAN officials,
airports are at strategic locations for emergency international and domestic airline operators,
humanitarian services in case a disaster hits officials from Nepal Army, Nepal Police,
any of the provinces 5, 6 and 7 in the country. and Armed Police Force and official from
Strengthening the preparedness of the airports meteorology. The training course included the
requirements on information management, Data
quality Specification, AIS Automation, Quality
Management System, Formal Arrangement
(Service Level Agreement), issuance of different
AIS products.
Seminar on Domestic Airport Operations
A regional seminar about problems, challenges
and solutions of domestic airports operations
was held at Biratnagar on 2nd and 3rd December
will enable them to provide uninterrupted air by CAAN Domestic Airports & Facilitation
services during a crisis situation, handling highly Department.
increased flow of humanitarian cargo, relief actors
including search and rescuers, medical responders,
as well as maintaining regular service to general
passengers. The GARD exercise was carried out
in Nepalgunj airport on 10-12 November and at
Dhangadhi airport on 13-14 November 2019,
engaging all key actors associated with airport
services which included airport authorities,
airliners, security agencies, fuel and fire services, Director General of CAAN  Mr. Rajan Pokhrel
custodians of forward logistics base and others. 27 inaugurated the seminar, emphasizing in his
officials in Nepalgunj and 23 in Dhangadhi Airport speech the the role of public private partnership
participated in the exercise. for modernization and innovation on Civil Aviation
Sector.He mentioned the necessity of effective
The GARD global mission had an inception meeting management for standard airport operation and
with Director General of CAAN Mr. Rajan Pokhrel improved passenger facilitation.
on 10th November and a final debriefing on 15th There were 7 working papers presented by
of November 2019 at CAAN head office. different departments and offices.
Aeronautical Information Service CAAN Anniversary Sports Activities
Awareness Training Program 2076 This year, due to unprecedented pandemic, the
A one-day Training Program on AIS Awareness continuation of regular sports activities that used
was organized and conducted by Aeronautical to get organized marking the CAAN’s anniversary,
Information Management (AIM) Department at has been halted. However, last year, on the
Kathmandu on 8th November 2019. occasion of 21st Anniversary of Civil Aviation
The objective of the program was to create Authority of Nepal, Civil Aviation Sports Club
awareness to the all aeronautical data originators organized different games and events including
and aeronautical information users on the Badminton, Table Tennis, Athletics, Volleyball,
latest updates made by the ICAO especially on Football, Quiz, Walkathon and Blood Donation.

18 CAAN Report 2019-20


21st CAAN Anniversary
The 21st Anniversary of CAAN was celebrated each, 10 employees were awarded additional
on 31st December, 2019 at Army Officers’ Club, grades while 14 employees were awarded medals
Bhadrakali. The event was inaugurated by Hon’ble for completing 25 years’ of service. Various
Minister for Culture, Tourism and Civil Aviation employees, departments and offices were also
Mr. Yogesh Bhattarai. awarded for their achievements.

During the occasion, various employees & Besides that, Late Mr. Birendra Prasad Shrestha,
departments were rewarded for different ex- Deputy Director General and Late Mr. Dhruba
achievements and their contribution to the office. Das Bhochhibhoya , ex- Director of CAAN were
5 employees were awarded Rs. 20,000 cash awarded posthumously.

Seminar on Financial Administration


The Finance Department of Civil Aviation Authority arrears, and Nepal Financial Reporting Standard
of Nepal (CAAN) organized a seminar on Financial (NFRS) were made at the seminar. The seminar
Administration for staffs working at CAAN with was organized in two phases. The first Seminar
an aim to enhance their capacity on the latest was organized in Nagarkot on 22 and 23 November

financial rules, policies and manuals. 2019 with 37 participants while second seminar
Deliberations and presentations on topics like was organized in Nepalgunj on 29 February and 1
CAAN’s accounting system, taxation, auditing and March 2020 with participation of 26 employees.

CAAN Report 2019-20 19


Construction of Remote Aircraft Parking
at TIA
The construction of remote aircraft parking at TIA
started from 2072/10/01 BS and completed at
2076/01/31. After the completion of the project,
there are now 3 link taxiways –R1 (length 62.35m
and breadth 23m), R2 (length 59.45m and
breadth 23m), R3/R4 (length 57.35m and breadth
11m).The Total RCC paved area is 200*65m^2.The
parking capacity of this bay is for 4 aircraft, two
for Boeing 777-200er series and two for ATR-72
.The main objective of this project is to reduce the
parking congestion at TIA.

Electromechanical works at TIA, GBIA and


Domestic Airports
Supply, delivery and commissioning of digital
announcement system, self-propelled runway
marking machine, pickup vehicle, recording server
with cameras and up graded CCTV system, 40 sets
of digital communication system (Tetra), heavy-duty
hand dryers at ITB & DTB and installation of bird cage
for protection of wind sensor data interruption have
been accomplished at Tribhuvan International Airport. 11/0.4kV Distribution Transformer of Bharatpur
Similarly, 40 KVA diesel generators for Bhattedada Airport
Radar Station has been installed and supply, delivery,
installation and modification of street lights in EOD
Holding Gate, RGB Auto Changer LED Strip at different
gardens, replacement of 2’X2’ PL light by LED Light at
DTB and replacement of old LED Down light at ITB/OA
Complex at TIACAO have been completed. Moreover,
escalators at International Terminal Building have been
replaced by new ones and DoubleT Carosoul drawing
regarding Baggage Handling System at extension side
of International Terminal Building has been approved.
Aviation Rescue and Fire Fighting Vehicles, Ambulance
ARFF Vehicles(12500L Water, 1500L Foam) at
GBIA, Bhairahawa
& Command Car vehicle have been delivered to
Gautam Buddha International Airport . Most of the
Pre-shipment work, equipment delivery, field survey,
civil work & design approval of the project “Supply,
Delivery, Installation and Testing of Taxiway Edge Light
and LED Signage at Biratnagar Airport” have been
completed. Some continuous work of the last fiscal
year 2076/77 affected due to Covid-19 are completing
soon which are at the end point of the project .
Improvement of power supply and earthing system
installation work at Pokhara airport and installation of
11/0.4kV distribution transformer at Bharatpur airport
have been completed.
LED Down Lighting at ITB TIA

20 CAAN Report 2019-20


Emergency Exercise conducted at TIA Officer (CDO), who is also the District Disaster
Management Committee Chairperson. The CDO
According to ICAO “Standards and Recommended promptly managed quick response SAR team
Practices”, each member state is obliged to under the Army Command of Bishnudal Barrack.
conduct a Full- Fledged emergency exercise at Under his command all the rescue related tasks
least once every two years to demonstrate its were done without any delay to rescue survivors
capability to execute a quick search and rescue in which his team was assisted by search and
operation when need arises. rescue teams from Nepal Police and Armed Police
Aviation Search and Rescue (SAR) process is very
difficult to mock-up, was carried out effectively
by TIA on 8th May 2019. Prior to the full exercise
actions including scenario development, briefing
it to the participants, management of logistics,
were carried out for making the program effective.

Force. The Chief District Officer took part actively


through the whole time of SAR exercise.
Making the exercise realistic, use of high line
rope rescue, use of dummies and deployment
of helicopter were used. In the exercise the
participation, co-ordination and response from
Full-Fledged emergency exercise was conducted local quick response team (QRT), District Disaster
on 8th of May 2019 (25th Baisakh 2076). The Response Centre (DDRC), Nepal Police, Armed
scenario included fictitious aircraft (9NSAR) Police Force and local administrators were
crashing at Devisthandanda near Dhulikhel commendable. While conducting the exercise, the
while coming to Kathmandu from Tumlingtar. local administration, district administration, the
The search and rescue exercise was conducted guidance and supervision from the MOCTCA, the
at Dhulikhel under the leadership of on-scene medical team from KMC hospital, the participation
commander (OSC) and including the Chief District of local was remarkable and appreciable.

CAAN Report 2019-20 21


Human Resource Development
Human Resource Department Civil Aviation Academy Activities
Civil Aviation Academy (CAA) is dedicated aviation
Human Resource Department, CAAN is
training organization approved by the Civil Aviation
endeavoring its best on enhancing the personal Authority of Nepal (CAAN). Since the establishment
and professional competency of organization’s in 1976 (then Civil Aviation Training Center),
most valuable resources – its employees. This CAA is producing skilled manpower required for
year, due to the global contagion of corona Virus aerodrome operation in Nepal. Being a full member
all international training, seminar, workshops and of ICAO TRAINAIR PLUS Program CAA has developed
conferences organized by International Institutes "Aerodrome control service course" as guided
and organizations including ICAO and CANSO by Training Development Guide (TDG) of ICAO. It
were participated through the virtual means. has also developed "Aerodrome Control Service
Simulator Guide for Instructor and Trainee", "Basic
First Aid Course" syllabus and amended ATC Licensing,
16 July-15 November 2020 (01st Shrawan- 31st Kartik 2077) Aerodrome Control and AFIS Course (AAA).
  AVSEC Pre-fab building has been renovated and
S.N. Subject
No. of Remarks * Online Pre-board Passenger Screening (PPS) lab has been
participants Total After COVID 2019
relocated at CAA premises in Sanothimi, Bhaktapur
1 Online Meeting,
Webinars, Video
ICAO APAC, COSCAP- from Cargo building Sinamangal. Maintenance
Teleconference
SA, EASA, CANSO cum X-ray Screening lab has been established. Air
APAC, SAA
(Unpaid) 150   150 conditioning system and CCTVs have been installed
2 Online Training ICAO Store 46(22 in class rooms, ATC simulator building, outer area,
(Paid) 46   46 completed)
canteen and academy premises. CAA has developed
3 Online Courses 11 (1 not registered,7
(Scholorship) confirmation it's own E-Library with the link academy.caanepal.gov.
not received) np.
22   22
SAA,Singapore21+
ICAO USOAP 1
Civil Aviation Academy Trainings in 2020
4 Online Courses 35 working days ATS Faculty
(Scholorship) service oriented AFIS Refresher Course 9
National course NASC Nepal
1 + Research4life Aerodrome Control Refresher Course 10
4   4 MOOC 3 CAALOP Course 18
Total   222   Basic AAA-008 Course 16
AVSEC Faculty
17th July 2019 to 15th July 2020 (01st Shrawan- 31st Ashadh) Screeners Certification 6
No. of participants Pre-board passenger Screening Course 8
S.N. Subject Remarks AVSEC for Airline Personnel 12
Technical Admin Total X-ray Examination & Screening Procedure 8 (Bhutanese
International Course participants)
1 Training 169 8 177 X-ray Examination & Screening Procedure 8 (Custom
Course Staffs)
International
Seminar,  
Workshop, Flight Safety
2 Meeting 91 7 98 Safety Management System Course 16
Flight Operation Officer/Flight Dispatcher License 12
Total 260 15 275 Course
Online Meeting,
Webinars, Video ARFF Faculty
Teleconference Breathing Apparatus Course for Bhutanese 10
3 (Unpaid) 170 0 170 Online Advanced ARFF Course – 008 14
Online Training After
COVID ARFF Field based Course (Nepalgunj) 8
4 (Paid) 9 0 9 Watch Tower Operation Course – 006 (Simara) 6
2019
Online Courses ARFF Field based Course (Simara) 7
5 (Scholorship) 5 0 5 Basic Aerodrome Rescue & Fire Fighting (ARFF-011) 16
Total 184 0 184
National Engineering Faculty
6 Training 32 52 84 CCNA (Cisco certified network associates) training 8
ILS/Localizer Rating Training 8
National Domestic Radar Maintenance Equipment Training 8
Seminar
7 ,Workshop 24 17 41
Administration Section
Total 56 69 125 Administrative Refresher Program (Pokhara) 16

22 CAAN Report 2019-20


CAA Activities 2019
CAAN certifies Aviation Security Instructor for
the first time.
CAA conducted Aviation Security Instructor
certification course for the first time in Nepalese
aviation history. All 13 participants successfully X-Ray Examination and Screening procedure course for
completed the course. Director General of Civil Bhutanese participants
Aviation Authority of Nepal Mr. Rajan Pokhrel
distributed the certificates to the newly certified Bhutan were successfully conducted. This was
AVSEC instructors. the first international training conducted under
Aviation Security Faculty in the history of CAA
Aviation Security Training Nepal. Altogether 16 participants successfully
Aviation Security Faculty conducted a Field completed the course.

Aerodrome Rescue and Fire Fighting


Faculty
Aerodrome Rescue and Fire Fighting Faculty
successfully conducted watch Tower operation
course for 8 participants of Biratnagar, 6
participants of Nepalgunj and 12 participants of
TIACAO. Field Based Aerodrome Rescue and Fire
Fighting training for 8 participants of Biratnagar,
6 participants of Nepalgunj, 8 participants of
Bhairahawa, 7 participants of Simara and 8
participants of Pokhara Airport Civil Aviation Office
was successfully completed. Basic ARFF Refresher
Course-009 for 16 participant was completed
based Aviation Security Training for 4 groups of on 2075/09/11. Two batches of Advanced ARFF
Airport Security police of Nepalgunj, Biratnagar, Course for 30 participants and basic ARFF Course
Chandragiri and Jumla Civil Aviation Office. 20 for 16 participants was successfully completed.
participants from each aforementioned airports Engineering Faculty
security police among 80 have successfully
completed the training. Likewise, 23 participants Two batches of Spare Parts Maintenance &
from Nepal Police also have successfully Management System (SMMS) Basic Course was
completed the pre-board passenger screening successfully completed for 15 participants of
course. Similarly, X-ray examination and screening CAAN and one batch of advanced Spare Parts
courses for sixteen (16) participants and AVESEC Maintenance & Management System (SMMS)
orientation programme of 2 batches of TIA for course for 6 participants completed. Induction/
40 participants have also been successfully orientation course for 16 engineering personnel
completed at TIACAO. of CAAN was successfully completed.
Induction / Orientation course for newly inducted
10 “Administration and Management” staff of
Aviation Security Screening Certification CAAN was also completed in FY-2075/76.
Course
For the first time in Nepalese Aviation history, two ARFF Faculty
groups of Aviation Security Screener’s Certification Aerodrome and Rescue and fire fighting faculty
course for Nepal police have been successfully had conducted following types of training in
conducted. Altogether 14 screeners from Nepal the Fiscal Year 2076/77 as approved by the Civil
police were certified. Aviation Academy.Some training are incomplete
Two groups of X-Ray Examination and Screening due to Covid 19 Pandemic. Among all the training
Procedure Course with foreign participants from ARFF Faculty had conducted 2 new training on

CAAN Report 2019-20 23


demand for the first time in Nepal i.e ICAO TRAINAIR PLUS STP 119/207/RFF AEH course and Breathing
Apparatus Course for international participants.
S.No. Training Courses Starting Date Ending date Participants Venue
1 ARFF Refresher Course-010 2076/06/27 - 2076/07/22 13 CAA/TIA

ICAO TRAINAIR PLUS STP 119/207/ 2 Int'l


2 2076/08/09 - 2076/08/13 CAA
RFF/AEH (On Demand) 9 National
3 Watch Tower Operation Course-005 2076/08/24 - 2076/08/26 8 TIA
4 Breathing Apparatus Course-007 2076/08/30 - 2076/09/04 16 CAA/TIA

Breathing Apparatus Course-Bhuta-


5 2076/09/21 - 2076/09/25 10 Int'l CAA/TIA
nese(On demand)

6 Advancd ARFF Course-008 2076/10/13 - 2076/11/29 14 CAA/TIA


Nepalgunj
7 ARFF Field Based Course 2076/10/26 - 2076/11/01 8
CAO
8 Watch Tower Operation Course-006 2076/12/06 - 2076/12/08 6 Simara CAO
9 ARFF Field Based Course 2076/12/09 - 2076/12/13 7 Simara CAO

Flight Safety
Programme Duration Place Participants
22-24 Oct, Jomsom
Airside and Ramp Operation Safety Awareness Programme 16
2019 CAO
20-22 Nov, Surkhet
Airside and Ramp Operation Safety Awareness Programme 14
2019 CAO

ATS Faculty
Courses Start Date Participants Duration
ATC Licensing, Aerodrome Control and AFIS Course (AAA- 2075/10/28 16 29 Weeks
007)
Approach and Area Control Course (AAA-003) 2075/09/23 19 24 Weeks
Approach and Area Control Course (AAA-004) 2076/03/12 19

24 CAAN Report 2019-20


Aviation Safety
and Security

CAAN Report 2019-20 25


Aircraft Accident
Aircraft Accident in Nepalin(2011-2020)
Nepal (2011-2020)
Aeroplane Aeroplane
Operations Operations
Flight operations in different regions of Nepal pose different levels of complexity. Small twin-engine
Flight operations in different regions of Nepal pose different levels of complexity. Small twin-engine aeroplane like DHC-6-300,
aeroplane like DHC-6-300, DO-228 and Let- 410 are involved in passenger and cargo operations in STOL
DO-228 and Let- 410 are involved in passenger and cargo operations in STOL airports located in high altitude mountainous region.
airports located in high altitude mountainous
Aircraft
Larger aircraft carry out international toregion.
Accident
flights or fromin Larger
Nepalaircraft
Tribhuvan carry
(2011-2020)
International out international
Airport, Kathmandu. Other flights to or have
trunk sectors
from Tribhuvan International Airport, Kathmandu. Other trunk sectors have been witnessing operations
been witnessing operations by medium category of aircraft. These specific conditions prevalent in Nepal have resulted in quite a
by mediumAeroplane
category offleet
aircraft.
Operations
heterogeneous operating These specificofconditions
in the airspace Nepal. prevalent in Nepal have resulted in quite a
heterogeneous fleet operating in the airspace of Nepal.
Flight operations in different regions of Nepal pose different levels of complexity. Small twin-engine aeroplane like DHC-6-300,
DO-228 and Let- 410 are involved in passenger and cargo operations in STOL airports located in high altitude mountainous region.
Larger aircraft carry out international flights to or from Tribhuvan International Airport, Kathmandu. Other trunk sectors have
Accident and Fatality- Aeroplane Operations
been witnessing operations by medium category of aircraft. These specific conditions prevalent in Nepal have resulted in quite a
heterogeneous fleet operating in the airspace(All type of operations)
of Nepal.

40
35 Accident and Fatality- Aeroplane Operations
No. of accident and fatality

34
30 (All type of operations)
25 25
40
35 20 19 34 18
No. of accident and fatality

30 15
25 10 25
20 5 19 3
3 2 18 4 3
15 2 1 2 2 1
0 0 0 0
10
5
-5 2011 2012 2013 2014 2015 2016 2017
3 2018 2019 2020
3 2 4 3
2 1 2 2 1
0 0 0 Year 0
-5 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Accident Year
Fatality Linear (Fatality)

During the period of 2011-2020, average fatality


Accident Fatalityrate involving
Linearairplanes
(Fatality) is 10.3 per year. In first 5 years i.e. 2011-2015the average
During theDuring
period
fatality of
therate 2011-2020,
wasof14.2
period average
and whereas
2011-2020, averagein fatality
second
fatality rate involving
rate5 involving
years i.e.airplanes isairplanes
2016-2020it 10.3has year.isIn10.3
per decreased firstto5per
6.4
years year.
average In firstper
fatality
i.e. 2011-2015the 5average
years
year. i.e.
2011-2015thefatalityaverage fatality
rate was 14.2 rate inwas
and whereas 14.2
second andi.e.whereas
5 years 2016-2020itin hassecond
decreased5 toyears i.e. 2016-2020it
6.4 average fatality per year. has decreased
to 6.4 averageDuringfatality per year.
last 3 years the fatality rate has further reduced to 2.0 fatalities per year. Accident of year 2017 was a Let 410 cargo aircraft
During
with last
a 3 yearsofthe
fatality 2 fatality rate has further
flightrate
crewsand reduced
accident to 2.0
of year fatalities
2018 was per year. Accident
a fatalities
C-208 cargoper of yearwith
aircraft 2017fatality
was a Let 410
ofof cargocrews.
2 year
flight aircraft
During lastwith
3 years the
a fatality of 2fatality
flight crewsand has further
accident of yearreduced
2018 was a to 2.0cargo
C-208 aircraft with year.ofAccident
fatality 2 flight crews. 2017ofThe
The accident wasaccident of
year
a Let 410 cargo 2019 was
aircraft a ground
with aaccident accident
fatality where
of 12flight1
flight flight crew
crewsand and 2 ground
accident personnel were killed. There was no fatal
aircraft in year
accident
year 2019 was a ground where crew and 2 ground personnel ofwereyear 2018
killed. Therewaswas no a C-208 cargo
fatal accident in year
with fatality of 2 flight crews. The accident of year 2019 was a ground accident where 1 flight crew and 2
2020.
2020.
ground personnel were killed. There was no fatal accident in year 2020.
Helicopter
Helicopter Operations
Operations

Helicopter- Accident
Helicopter- and Fatality
Accident and Fatality
8
8
No. of accident and fatality

7 7 7 7
No. of accident and fatality

6 7 7 7 7
5 6
4 5 4 4
3
4 4 4
2 2 2 2
3
1 1 1 1
0 2 0 0 2 02 0 2
1 2011 12012 2013 1
2014 1
2015 2016 2017 2018 2019 2020
0 0 0 Year 0 0
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
No. Accident No. Fatality Linear (No. Fatality)
Year
Helicopters are mainly operated in high altitude logistic support and rescue missions in mountains. Average fatality rate in
Helicopterhelicopter
Operationsoperations for 2011-2020 is 2.7persons
No. Accident per year. During the first 5 years i.e.Linear
No. Fatality 2011-2015, the fatality rate was 1.2
(No. Fatality)
persons per year where as in second 5 years i.e. 2016-2020 it is 4.2 fatalities per year. Air passenger growth in Nepal has increased
Helicopters are mainly operated in high altitude logistic support and rescue missions in mountains. Average
fatality rate Helicopters are mainly operated in high altitude logistic support and rescue missions in mountains. Average fatality rate in
in helicopter operations for 2011-2020 is 2.7persons per year. During the first 5 years i.e. 2011-
helicopter operations for 2011-2020 is 2.7persons per year. During the first 5 years i.e. 2011-2015, the fatality rate was 1.2
2015, the fatality rate was 1.2 persons per year where as in second 5 years i.e. 2016-2020 it is 4.2 fatalities
per year. Airpersons per year
passenger where as
growth in inNepal
secondhas
5 years i.e. 2016-2020
increased it is 4.2
by more thanfatalities per year.
two folds Air passenger
during last 10growth
years in
andNepal has increased
there
is a significant increase in number of helicopters and its operations for last five years.

26 CAAN Report 2019-20


Effective Implementation (EI) of Nepal
ICAO conducts regular USOAP audits of the regulatory functions of its member States. Such audits
conducted by ICAO focus on a State's capability in providing safety oversight by assessing whether the State
has effectively and consistently implemented the critical elements (CEs) of a safety oversight system, which
enable the State to ensure the implementation of ICAO's safety-related Standards and Recommended
Practices (SARPs) and associated procedures and guidance material.

EI of Nepal, average of APAC region, Global and


EI of Nepal, average ofGlobal targetGlobal and
APAC region,
71 Global target
68.78
7169
66.76 68.78
6967
66.76
of EIof EI

6765
63.26
Percentage

6563
63.26
Percentage

6361
60
6159
GASP Target 60
5957
GASP Target
5755

First USOAP CMA of Nepal


55 was conducted
Nepal EI
in 2009 andAPACNepal had achieved theGlobal
region
Effective Implementation (EI)
percent of 46.96%. The last USOAP (ICVM) audit of Nepal was conductedin
Nepal EI APAC region Global
2017 and Nepal has achieved
the EI percentage of Nepal is 66.76 % which is above the Current Global Target (GASP Target) rate of 60%.
Similarly, the Current EI percentage of Nepal is above regional average EI of 63.26% and below the Global
First USOAP
average EI percentage CMA of Nepal was conducted in 2009 and Nepal had achieved the Effective Implementation (E
of 68.78%.
First
of USOAP CMA
46.96%. The of Nepal
last was conducted
USOAP in 2009
(ICVM) audit of and Nepal
Nepal washadconductedin
achieved the Effective
2017 and Implementation (EI) percent
Nepal has achieved the EI perc
of 46.96%.
Nepal The last%
is 66.76 USOAP
which (ICVM) audit ofthe
is above Nepal was conductedin
Current 2017 and(GASP
Global Target Nepal has achieved
Target) ratetheofEI 60%.
percentage of
Similarly, the
Nepal is 66.76of%Nepal
percentage whichisisabove
above regional
the Current Global EI
average Target (GASP Target)
of 63.26% rate the
and below of 60%. Similarly,
Global average the EI
Current EI
percentage of 6
Activities during the Pandemic
percentage of Nepal is above regional average EI of 63.26% and below the Global average EI percentage of 68.78%.
CAAN has been working in close coordination with CAAN facilitated, via every means, for repatriation/
the ICAO Asia Pacific Regional Office, Bangkok cargo flights, medical flights, rescue flights, cargo
for dealing with the issues emanating from the flights.
crisis. CAAN has issued various guidelines such as Moreover, Nepal has regularly participated in all
COVID-19 Guidance 2020, CAAN SMS Guidance the eight meetings of ACCRPG ( ICAO APAC COVID
2020, CAAN AVSEC Guidance 2020 besides issuing 19 Contingency and Recovery Planning Group)
14 Quick Reference Guide issued in line with ICAO organized so far. Nepal-was selected for the
QRG. CAAN has coordinated its aviation activities complimentary IPACK package from among the APAC
and guidance for stakeholders remaining in close States and administrations. It is under deployment
coordination with ICAO HQ, APAC, COSCAP-SA, phase now with 3 trainings and 12 workshops
EASA, DGAC France, EU, EC etc. via virtual platforms. targeted for safety managers to manage COVID 19.

CAAN Report 2019-20 27


Launching of Aviation Safety Report, Nepal Aviation Safety Campaign
2020 (NASC) - 2019
Aviation Safety Report 2020, published by the Nepal Aviation Safety Campaign (NASC), a joint
Civil Aviation Authority of Nepal, was launched initiative of Civil Aviation Authority of Nepal
officially by Honorable Minister for Culture, (CAAN), Airlines Operators Association of Nepal
Tourism and Civil Aviation Mr. Yogesh Bhattarai (AOAN), and World Food Programme (WFP), has
on 27 November 2020 in the presence of been a major programme for safety enhancement
CAAN officials, aviation stakeholders including in Nepal since 2013. NASC was organized in May
accountable executives and safety managers and 2012, June 2014, February 2016, June 2017 and
media personnel. August 2018.
The report depicts the safety status of Nepal and The Campaign used to be organized as a single
provides a brief overview of updates on safety program including various trainings every year
indicators including accidents that occurred during on aviation safety related topics. Feeling the
the past ten years together with the operational need to organize safety activities throughout
safety risks of Nepal, implementation status of the year, the NASC modality has been changed
Nepal Aviation Safety Plan (2018-2022) safety from 2019 and CAAN, along with its co-partners
priorities and State safety oversight information. AOAN and WFP, has been conducting trainings for
the whole year through. In 2019, three trainings
namely "Root Cause Analysis", "Aviation Audit"
and "Aircraft Maintenance Reliability" have been
organized from 25-27 September, 2-6 December
and 16-20 December respectively. Several other
topics of trainings have mutually been identified
by the aviation stakeholders. The Campaign shall
organize trainings and workshops on such topics
of mutual interest in 2019 and in the years to
come.
on 21st December 2020, participants from the co-
partners including CAAN, AOAN, WFP joined in an
Aviation Security Activities online programme to mark the beginning of safety
Aviation Security Department has discharged its campaign for the year 2021. The programme
various responsibilities effectively and significantly included presentation on ‘Human Factor and
this year. Installation and commissioning of Decision Making’, ‘Bussiness Continuity and the
Walk Through Metal Detector in Tumlingtar, Adverse Imapct of COVID-19’ and ‘Managing
Ramechhap, Bhojpur,Rajbiraj and Phaplu Safety during Pandemic -Nepal’s Experience’.
airports have been completed, guidance on Hundreds of participants from aviation fraternity
Aviation Security During Covid-19 Pandemic have been benefitting directly from the NASC.
has been developed and its implementation is
being monitored through compliance check-list.
Similarly, recommendations of USAP- CMA are in
implementation phase and the Security oversight
of TIA and domestic airports is in progress.
The 36th Meeting of National Civil Aviation Security
Committee was also convened on 13 August 2019
in the chairpersonship of honorable minister,
Culture, Tourism and Civil Aviation, Mr. Yogesh
Bhattarai which approved sixth edition of National
Civil Aviation Security Program, second edition of
National Civil Aviation Quality Control Program
and the Second edition of National Civil Aviation
Training Program.

28 CAAN Report 2019-20


Airport
Status

CAAN Report 2019-20 29


Status of AirportsTotal
in Nepal
Airports = 52
International Airport
Total Airports =
Domestic Airports = 51
52
54 =1

OtherAirports
Total Domestic= 52 International Airport
Hub Airports = 4 Airports
Domestic = 53
51
Airports = 47 =1
International Airport
Domestic Airports = 51
=1
Other Domestic
Hub AirportsHub
= Airports
4 Other Domestic
=4
Airports 49
Airports ==47
47

International
Airports Under
International Domestic Airports
Construction =3
Airports Under
UnderAirports
Domestic Construction
Construction = 3 Under Construction
=3 = 31
International
Airports Under Domestic Airports
Construction = 3 Under Construction
=3
Total Airports = 54
52
Total Airports
In Operation 32 = 52
= 35
Not In Operation = 20
19
Total
In Operation == 32
Airports 52
International Airport

Not
In In Operation
Operation = 20
= 32
1. Tribhuvan International Airport
Hub Airports
1. Biratnagar Airport 3. Nepalgunj Airport
2. Gautam Buddha Airport 4. Pokhara Airport
Other Domestic Airports
Not In Operation = 20
1. Baitadi Airport 16. Phaplu Airport
2. Bajhang Airport 17. Rajbiraj Airport
3. Bajura Airport 18. Ramechhap Airport
4. Bharatpur Airport 19. Rara Airport
5. Bhojpur Airport 20. Rukum Chaurjahari Airport
6. Chandragadhi Airport 21. Rukum Salle Airport
7. Dang Airport 22. Rumjatar Airport
8. Dhangadhi Airport 23. Sanfebagar Airport
9. Dolpa Juphal Airport 24. Simara Airport
10. Doti Airport 25. Simikot Airport
11. Janakpur Airport 26. Surkhet Airport
12. Jomsom Airport 27. Taplejung Airport
13. Jumla Airport 28. Tenzing Hillary (Lukla) Airport
14. Khanidanda (Manamaya Rai) Airport 29. Thamkharka Airport
15. Lamidanda Airport 30. Tumlingtar Airport

30 CAAN Report 2019-20


Airports Not in Operation
1. Baglung (Balewa) Airport 11. Palungtar Airport
2. Darchula Airport 12. Rolpa Airport
3. Dhorpatan Airport 13. Syangboche Airport
4. Dolpa Masinechaur Airport 14. Tikapur Airport
5. Jiri Airport 15. Gulmi Airport*
6. Kangeldanda Airport 16. Ilam (Sukilumba) Airport*
7. Langtang Airport 17. Khiji Chandeshwori Airport*
8. Manang (Humde) Airport 18. Kalikot Airport
9. Meghauli Airport 19. Kamal Bazaar Airport
10. Mahendranagar Airport
* Airports are in process of publication of Aerodrome data and ICAO Location Indicator.

Domestic Airports under Construction International Airports under Construction


1. Arghakhanchi Airport 1. Nijgadh International Airport
2. Gautam Buddha International Airport
3. Pokhara Regional International Airport
Paved Airports
S. N. Aerodromes District S.N. Aerodromes District
1 Baitadi Airport Baitadi 19 Nepalgunj Airport Banke
2 Bajhang Airport Bajhang 20 Phaplu Airport Solukhumbu
3 Bajura Airport Bajura 21 Pokhara Airport Kaski
4 Bharatpur Airport Chitwan 22 Rajbiraj Airport Saptari
5 Bhojpur Airport Bhojpur 23 Ramechhap Airport Ramechhap
6 Biratnagar Airport Morang 24 Rara Airport Mugu
Rukum Chaurjahari
7 Chandragadhi Airport Jhapa 25 Western Rukum
Airport
8 Dang Airport Dang 26 Rukum Salley Airport Eastern Rukum
9 Dolpa (Juphal) Airport Dolpa 27 Rumjatar Airport Okhaldunga
10 Doti Airport Doti 28 Sanfebagar Airport Achham
11 Dhangadhi Airport Dhangadhi 29 Simara Airport Bara
12 Gautam Buddha Airport Rupandehi 30 Simikot Airport Humla
13 Janakpur Airport Janakpur 31 Surkhet Airport Surkhet
14 Jomsom Airport Mustang 32 Taplejung Airport Taplejung
Tenzing Hillary (Lukla)
15 Jumla Airport Jumla 33 Solukhumbu
Airport
Khanidanda (Manamaya Tribhuvan
16 Khotang 34 Kathmandu
Rai) Airport International Airport
17 Lamidanda Airport Khotang 35 Tumlingtar Airport Sankhuwasabha
18 Manang (Humde) Airport Manang 36 Thamkharka Airport Khotang
37 Bajhang Airport Bajhang

Airports under-going Pavement


Airports with Night Operation Facilities
(Asphalt Concrete) Construction
1. Dolpa Masinechaur 1. Biratnagar
2. Kalikot 2. Chandragadhi
3. Dhangadi
4. Gautam Buddha
5. Janakpur
6. Nepalgung
7. Simara
8. Tribhuvan International Airport
CAAN Report 2019-20 31
32
Pavement Strength of Aerodromes

Simikot

CAAN Report 2019-20


Darchula

Bajhang
Baitadi Rara
Bajura

r
Jumla
Kalikot

aga
r
za
Doti

feb
Ba
Masinechaur

al

San

Ma
m
Dolpa

he
Ka

nd
ra
Jomsom

na
Dhangadhi i

ga
ar

r
rjah
au Salley
Tikapur Ch Manang
Surkhet
Dhorpatan
Baglu
ng
Rolpa Pokhara

tar
ng
Nepalgunj Langtang

lu
Gulm
i

Dang Pa
e
ch
bo

TIA
a

a Jiri
nd

haw
Sy

Bharatpur
lda

aira
Lu ang
ge lu

Bh
n
P k

Meghauli ap Taplejung
Ka hap la

hh Kh
ec iji C
h
m and
esh
Tumlingtar

Ra Ru wo
ri
mj
ata
a

r
Bhojpur
khark
Lam

Simara
Kha idanda

r
Tham nidanda

ba
ilum
Suk
Janakpu
agar

raj dhi
Earthen jbi aga
ndr
Biratn

Ra Cha
Gravelled
Asphalt Concrete
Operational Status of Aerodromes

Simikot

Darchula

Bajhang
Baitadi Rara
Bajura

r
Jumla

r
Kalikot

aga
za
Doti

feb
Ba
Masinechaur

al

Ma
San
m
Dolpa

he
Ka

nd
ra
Jomsom

ri

na
Dhangadhi

ha

ga
r
rja
au
Ch
Salley
Tikapur Surkhet Manang
Dhorpatan
Baglu
n g
Rolpa Pokhara

tar
ng
Nepalgunj Langtang

lu
Gulm
i

Dang Pa
e
ch
bo

TIA
a

a Jiri
nd

haw
Sy

Bharatpur
lda

aira
Lu ang
ge lu

Bh
n
P k

Meghauli ap Taplejung
Ka hap la

hh Kh
ec iji C
h
m and
esh
Tumlingtar

Ra Ru wo
ri
mj
ata
a

r
Bhojpur
khark
Lam

Simara
Kha idanda

r
Tham nidanda

ba
ilum
Suk
Janakpu
agar

raj dhi
jbi aga
ndr
Biratn

In Operation Ra Cha
Not in Operation

CAAN Report 2019-20


33
34
Type of Air Traffic Services

Simikot

Darchula

CAAN Report 2019-20


Bajhang
Baitadi Rara
Bajura

r
Jumla

aga
Kalikot

za
Doti

Ba
Masinechaur

a l

Ma
m
Dolpa

he
Ka anfeb

n
dra
Jomsom

n
ri

ag
Dhangadhi

ha

ar
urja
a
Ch
Salley
Tikapur Surkhet Manang
Dhorpatan
Baglu
n g
Rolpa Pokhara

tar
ng
Nepalgunj Langtang

lu
Gulm
i

Pa
Dang
e
ch
bo

TIA
Jiri
da

a
an

haw
Sy

ira Bharatpur
eld

Lu ang
g

Bha
n lu
P k

Meghauli ap Taplejung
Ka hap la

hh Kh
ec iji C
h
m and
esh
Tumlingtar

Ra Ru wo
ri
mj
ata
a

r
Bhojpur
khark
Lam

Simara
Kha idanda

r
Tham nidanda

ba
ilum
Suk
r

Janakpu
aga

raj dhi
jbi aga
Controlled ndr
Biratn

Ra Cha
Uncontrolled
Unmanned
AIP ENR 6.3-1
NEPAL CNS Strength of Aerodromes 30 June 2020
80°0' 80°30' 81°0' 81°30' 82°0' 82°30' 83°0' 83°30' 84°0' 84°30' 85°0' 85°30' 86°0' 86°30' 87°0' 87°30' 88°0' 88°30'
30°30'

30°30'
(ZW U Q)

KAT
HM
A

U M Q I FIR
NDU
F NEPAL

IR

UR

DF
VI
SIMIKOT

V NS
RADIO FACILITY INDEX CHART

IR
M
HF:5858K KU

IF
VHF:122.5 M NM
30°0'

I (Consult current NOTAMs for latest information)

30°0'
LH NG
DE C
Y F IR
(Z
PK

M
)
Y DARCHULA
C RARA
BAJHANG HF: 5858 K
HF:5858K VHF: 122.5 M
BAJURA
29°30'

YCVHF:122.5 M

29°30'
C
Y HF: 5858K Y

C
Y BAITADI
VHF:122.5 M

C
DOTI Y SANFEBAGAR Y JUMLA
C

C
Y HF: 5858K HF:5858 K
VHF:122.5M VHF:122.5 M
MASINECHAUR
MAHENDRANAGAR Y DOLPA
29°0'

29°0'
C

C
Y HF: 5858K
C
Y HF: 5858 K
VHF:122.3 M VHF: 122.5 M JOMSOM CHINA
HF:5858 K
DHANGADHI VHF: 122.5

!
Y SURKHET
C
HF:5858 K SALLEY Y
C
VHF:122.3 M HF:5858 K HF: 5858 K
VHF:122.5 M

C
KAT Y
D Y VHF: 122.5 M C
Y MANANG
HF: 5858 K

C
HM
AN Y TIKAPUR
!OY CHAURJAHARI VHF: 118.3 M
28°30'

28°30'
DUCFIR
HF:5858 K Y DHORPATAN
C
V VHF:122.5 M
BAGLUNG

NS
KATH M
POKHARA

M
A
HF: 5858K HF:5858 K
NEPALGUNJ Y VHF: 123.95K
ND
HF:5858 K C VHF:123.8 M U F I R VNSM
DME 75 X

C
VHF:118.3 M ROLPA Y !YO Y

C
LANGTANGC KUNMING
DANG

C
M F IR
O
Y NDB:330K,NPJ

!
C DVOR:115.1 M NGJ
Y HF:5858 K
(ZP
KM
28°0'

28°0'
C
DME98X VHF:122.3 M Y PALUNGTAR HF:5858 K, 5805.5 K
VHF:126.5 M, 124.7 M
APP:120.6 M, 125.1 M
TWR:118.1M, 118.5 M SYANGBOCHEC
DE BHARATPUR SMC:121.9 M
Y K A THMAN
DU FIR VN SM
L HF:5858 K KATHMANDU LUKLA
HI
BHAIRAHAWA ATIS:127.0 M 5805.5 K
VHF:122.3 M Y HF:
C OY C
FIR
O M VHF:120.150 M
A

V ID HF 5858 K NDB:295 K, BHP Y ! DVOR: 113.2 KTM JIRI


C

F VHF: 122.5 M O O Y
Y MEGHAULI DME: 79X PHAPLU TAPLEJUNG
DVOR: 114.7 M BWA C NDB: 318 K KAM 5805.5 K HF: 5805.5 K
27°30'

Y HF:

27°30'
DME 94 X YM HF :5858 VHF122.5 M

!
C KATH VHF :122.5 LOC: 252 K LNC KANGELDANDA VHF: 122.5 M
MA N D LOC: 230 K LTH
RAMECHHAP HF:5805.5 K CY
C

U F
I
Y VHF: 122.3 M LAMIDANDA Y
C
C

HF:5805.5 K
C

KO
LKATA RUMJATAR Y HF:5805.5 K Y TUMLINGTAR
VHF: 122.5 M HF:5805.5 K Y VHF: 122.5 M
VNS

FIR C HF:5805.5 K
VHF: 122.3 M
M

VE

Y
C VHF: 123.95 M
C

M SIMARA KHANIDANDA Y
!
Y
C

CF

HF:5858 K HF:5805.5 K BHOJPUR


KO

VHF: 122.5 M
C

INDIA VHF:118.3 M Y HF:5805.5 K


27°0'

LK

27°0'
DVOR: 112.9 M, SMR THAMKHARKA VHF: 122.3 M
LEGEND DME 76 X HF:5805.5 K
ATA

VHF: 122.3 M

International Aerodrome BIRATNAGAR


A JANAKPUR HF: 5805.5 K
HF:5805.5 K VHF;123.8 M
!
FIR VECF

Y VHF: 122.5 M

!
C
National Aerodromes (Controlled) RAJBIRAJ DVOR: 114.1 M BRT CHANDRAGADHI
C
HF: 5805.5K DME: 88X HF: 5805.5 K
!

122.5MHZ VHF: 122.5, M


CY
C National Aerodromes (STOL/AFIS) SCALE 1:22,00,000
26°30'

26°30'
YC M
O
Y
C
National Aerodromes (STOL/Not in operation) Nautical Miles 25 12.5 0 25 50 75 100 Nautical Miles
C

80°0' 80°30' 81°0' 81°30' 82°0' 82°30' 83°0' 83°30' 84°0' 84°30' 85°0' 85°30' 86°0' 86°30' 87°0' 87°30' 88°0'

CAAN Report 2019-20


AMDT 02/2020 CIVIL AVIATION AUTHORITY OF NEPAL

35
36
International Air Connectivity of Nepal

CAAN Report 2019-20


Air Connectivity within Nepal

Simikot

Darchula

Bajhang
Baitadi Rara
Bajura

Jumla

g
Kalikot

a a
za
Doti

Ba r
Masinechaur

al

Ma
m
Sa
Dolpa

he
Ka nfeb

nd
ra
Jomsom

ri

na
Dhangadhi

ha

ga
r
rja
au
Ch
Salley
Tikapur Surkhet Manang
Dhorpatan
Baglu
n g
Rolpa Pokhara

tar
ng
Nepalgunj Langtang

lu
Gulm
i

Dang Pa
e
ch
bo

TIA
a

a Jiri
nd

haw
Sy

Bharatpur
lda

aira
Lu ang
ge lu

Bh
n
P k

Meghauli ap Taplejung
Ka hap la

hh Kh
ec iji C
h
m and
esh
Tumlingtar

Ra Ru wo
ri
mj
ata
a

r
Bhojpur
khark
Lam

Simara
Kha idanda

r
Tham nidanda

ba
ilum
Suk
r

Janakpu
aga

hi
raj gad
jbi a ndra
Biratn

Ra Ch

CAAN Report 2019-20


37
38
GEN 3.4-4 Aeronautical Communication Network of Nepal AIP
30 June 2020 NEPAL
(Inside Valley)
3.4.

CAAN Report 2019-20


- WIFI
IFI
- W-
I
WIF

CIVIL AVIATION AUTHORITY OF NEPAL AMDT 02/2020


AIP GEN 3.4-5
NEPAL 30 June 2020
Aeronautical Communication Network of Nepal
3.4.6. Aeronautical Fixed Service ATS Message Handling System (AMHS) (Domestic Airports)
(Outside Valley)

CAAN Report 2019-20


39
AMDT 02/2020 CIVIL AVIATION AUTHORITY OF NEPAL
Aeronautical Fixed Telecommunication Network
of Nepal

40 CAAN Report 2019-20


Aeronautical Chart of Nepal

CAAN Report 2019-20


41
Air Transport

42 CAAN Report 2019-20


Domestic Airlines Operating In Nepal
Fixed Wing-9 Rotor Wing-10
Nepal Airlines Corporation Air Dynasty Heli Services
Yeti Airlines Simrik Air
Buddha Air Shree Airlines
Sita Air Fishtail Air
Simrik Airlines Mountain Helicopters
Tara Air Prabhu Helicopters
Shree Airlines Manang Air
Summit Air Altitude Air
Saurya Airlines Heli Everest
Kailash Helicopter Services

International Airlines Operating in Nepal


S. No. Country Airlines Destination
1 Bangladesh Biman Bangladesh Airlines Dhaka
Paro
Tashi Air (Bhutan Airlines Pvt Ltd)
Delhi
2 Bhutan
Paro
Druk Air ( Royal Bhutan Airlines)
Delhi
Air China Chengdu
China Eastern Airlines Kunming
3 China China Southern Airlines Guangzhou
Sichuan Airlines Lhasa
Tibet Airlines Co. Ltd Xi'an
4 Hong Kong Cathay Dragon Hong Kong
Delhi
Air India Limited
Kolkata
Inter Globe Aviation Limited (Indigo) Delhi
5 India
Delhi
Space Jet Airlines Limited
Mumbai
TATA SIA Airlines Limited (Vistara) Delhi
6 Korea Korean Air Seoul
7 Kuwait Jazeera Airways Kuwait City
Malaysia Airlines Kulalampur
8 Malaysia
Malindo Air Kulalampur

CAAN Report 2019-20 43


S. No. Country Airlines Destination
Buddha Air Pvt. Ltd.
Varanashi
(International Operation)
Delhi
Hong Kong
Bangkok
Bangaluru
Mumbai
Nepal Airlines Corporation
Doha
Kulalampur
Dubai
Narita
9 Nepal Guangzhou
Doha
Dammam
Abu Dhabi
Dhaka
Dubai
Himalaya Airlines Pvt. Ltd Riyadh
Guiyang
Changsha
Kulalampur
Beijing
Chongqing
Oman Air Muscut
10 Oman
Salam Air Muscut
11 Qatar Qatar Airways Doha
12 Singapore Silk Air Singapore
Thai Airways Bangkok
13 Thailand
Thai Lion Air Bangkok
14 Turkey Turkish Airlines Istanbul
Air Arabia Sarjaha
15 U.A.E Etihad Airways Abu Dhabi
Fly Dubai Dubai

44 CAAN Report 2019-20


Valid AOC with Flight Crew Details
Air Operators' AOC and Ministry License Details
Air Operators' Total Aircrafts &
S. No. AOC No. AOC Validity Aircraft Registration
Name (Type)
9N-AJD
9N-AFQ
Air Dynasty
1 035/2001 15-May-22 6 units (AS350) 9N-AGU
Heli Services
9N-ALA
9N-ANA
9N-AMS
2 Altitude Air 085/2016 6-Oct-21 3 units (AS350)
9N-AMX
9N-AIM
9N-AIN
9N-AIT
9N-AJO
9N-AJS
3 units (ATR-42) 9N-AJX
8 units (ATR-72)
3 Buddha Air 014/1996 15-Jul-20 9N-AMD
2 units
(Beechcraft) 9N-AMF
9N-AMU
9N-AMY
9N-ANI
9N-AEW
9N-AEE
9N-AKZ
Summit Air 5 units 9N-AMG
4 064/2010 15-Jun-22
(GOMA AIR) (LET-410) 9N-AMP
9N-AND
Fishtail Air 2 units (AS350) 9N-AJQ
5 (Summit Heli- 1 unit Bell 9N-AJR
017/2001 15-Jan-22
copters) 206 9N-AII
9N-AKG
6 Heli Everest 086/2016 6-Dec-21 2 units (AS350)
9N-AKP
9N-ALM
3 units (Airbus320)
Himalaya 9N-ALV
7 084/2015 7-Dec-21 1 unit
Airlines 9N-ALW
(Airbus319)
9N-AJK
No Aircraft in
8 Makalu Air 057/2009 15-May-20 3 units (C- 208B)
Registration
3 units 9N-AMV
9 Manang Air 082/2014 2-Jul-22
(AS350) 9N-ANJ
Mountain 2 units 9N-AKB
10 055/2009 15-May-22
Helicopters (AS350) 9N-ALD
9N-ABT
9N-ABU
9N-ABX
9N-AKW
3 units 9N-AKX
(DHC-6/300) 9N-AKQ
Nepal Airlines 2 units (Airbus-320)
11 003/2000 15-Jun-22 9N-AKR
Corporation 2 units (MA-60)
9N-AKS
4 units (Y-12E)
9N-AKT
2 units (Airbus-330)
9N-AKU
9N-AKV
9N-ALY
9N-ALZ

CAAN Report 2019-20 45


Air Operators' Total Aircrafts &
S. No. AOC No. AOC Validity Aircraft Registration
Name (Type)
9N-AJW
9N-AJN
Prabhu Helicop- 1 unit (R-44)
12 081/2013 31-Oct-21 9N-AMJ
ter 4 units (R-66)
9N-ALU
9N-ALX
9N-ALE
13 Saurya Airlines 083/2014 10-Nov-21 2 units (CRJ-200)
9N-AME
9N-AMA
9N-AMC
2 units (CRJ-200) 9N-AMB
2 units (CRJ-700) 9N-AMO
9N-ADL
6 units MI-17 9N-ADK
9N-ADM
14 Shree Airlines 030/2002 15-May-22
9N-ADD
9N-AJA
2 units AS350 9N-AHT
2 units 9N-ALF
DHC-8 Q400 9N-ALK
9N-ANE
9N-ANF
9N-ALP
9N-AJZ
4 units (AS350)
15 Simrik Air 034/2000 15-Apr-22 9N-AKD
1 unit (Bell 407)
9N-ANB
9N-ALT
2 units 9N-AGL
16 Simrik Airlines 052/2009 24-Feb-22
(Beechcraft) 9N-AGI
9N-AHB
9N-AHR
17 Sita Air 033/2000 15-Jun-22 4 units (Do-228)
9N–AIE
9N-AJH
9N-AET
4 units (DHC-6) 300
9N-AEV
18 Tara Air 053/2009 15-Jul-20 & 400
9N-AKL
series
9N-ALO
9N-AMN
9N-AMM
5 units (ATR-72) 9N-ALN
9N-ANC
9N-ANG
19 Yeti Airlines 037/2004 15-Jul-20
9N-AHU
9N-AHV
5 units (Jetstream) 9N-AHY
9N-AIH
9N-AJC
9N-AML
Kailash Helicop-
20 087/2018 21-Mar-22 3 units (AS350) 9N-AJJ
ter
9N-AMT

Total AOC Issued 87


Valid AOC 18
Suspension 1
Invalid and Cancelled AOC 43
Ultralights and Paragliding AOC now converted to RAOC 25
Helicopter Operator with Valid AOC 9
Fixed Wing Operator with Valid AOC 8
Both Fixed and Rotor wing 1

46 CAAN Report 2019-20


Bilateral Air Services Agreement
Nepal has signed Bilateral Air Services Agreements and MoU with 40 different countries since 1963. Nepal ad-
opted a liberal sky policy in 1992 since then it is gradually pursuing an open sky policy in accordance to the civil
aviation policy 2006. Basic provisions of Bilateral Air Services Agreements between Nepal & various countries
have been tabulated as follows:

S. Date/
Country Designation Destination Weekly seats Yearly seats
No. Amendments
To be decided by To be decided
30 Septem- Points in Aus-
1 Australia Multiple aeronautical author- by aeronautical
ber 2019 tralia
ities authorities
Any 2 points in
2 Austria 20 Oct 1997 Multiple 1400 72800
Austria
3 Bahrain 29 Dec 2008 Multiple Bahrain 5600 291200
4 Bangladesh 23 May 2005 Multiple Dhaka 7000 364000
5 Bhutan 23 may 2014 Multiple Paro 4200 218400
Bandar Seri
6 Brunei 02 April 1997 Multiple 1400 72800
Begwan
Beijing Shang-
hai, Lhasa,
Guangzhou,
7 China 7 July 1998 Multiple 11200 582400
Kunming,
Chengdu and
Xi’an
8 Croatia 30 Mar 2004 Multiple   1400 72800
9 Egypt 29 Nov. 1997 Multiple Cairo 600 31200
Paris and anoth-
10 France 7 July 1998 Multiple 200 10400
er point
2 points in Ger-
11 Germany 26 July 2000 Multiple 1800 93600
many
Hong Kong
12 23 may 2007 Multiple HKSAR 2800 145600
HKSAR
Delhi 30000  
Mumbai 30000  
Bangalore 30000
13 India 9 Sept. 2009 Multiple 30000*** 1560000***
Chennai 30000
Hyderabad 30000  
Kolkata 30000  
14 Israel 25 Dec 2006 single Points in Israel 800 41600
15 Italy 8 May 1997 single Rome 400 20800
16 Japan 17 Feb 1993 Multiple Osaka 400 20800
17 Jordan 6 Oct 1999 Multiple Points to Jordan 0 0
18 Kuwait 23 Jan 2006 single Kuwait 400 20800
19 Luxembourg 18  Jun 1999 Multiple 2 Points 1400 72800

CAAN Report 2019-20 47


S. Date/
Country Designation Destination Weekly seats Yearly seats
No. Amendments
20 Macau 19 Feb 1998 Multiple Macau 1400 72800
Any points in
21 Malaysia 12 Dec 2007 Multiple 4200 218400
Malaysia
22 Maldives 10 Oct 1996 Two Airlines Male No restriction No restriction
23 Myanmar 21 April 2006 Multiple Yangon 5300 275600
Points in New
24 New Zealand 22 Oct. 2015 Multiple 2800 145600
Zealand
25 Oman 2 Dec. 1997 Multiple Mascot 1400 72800
Karachi, Islam-
abad, Sailkot,
26 Pakistan 22Oct. 2015 Multiple 3800 197600
Multan and
Faisalabad
Manila, Subic,
27 Philippines 18 Nov 2004 Multiple 2500 130000
Cebu, Davao
28 Qatar 1 Sep. 2009 Multiple Doha 5600 291200
Republic of
29 21 Sep 2004 Multiple Seoul 800 41600
Korea
Russian Feder-
30 5 Dec. 1989 single Moscow 164 8528
ation
Any Points in
31 Saudi Arabia 23 Oct. 2015 Multiple 5600 291200
Saudi Arabia
32 Singapore 2 Feb 2010 Multiple Singapore 5600 291200
33 Sri Lanka 23 Jan. 2009 Multiple Colombo 2800 145600
34 Thailand 16 Feb. 2004 Multiple Thailand 2000 104000
The Nether-
35 17 April 1998 single 2 Points 1400 72800
lands
36 Turkey 24 Sept. 2010 Multiple Istanbul 2800 72800
United Arab
37 19 Oct. 2015 Multiple Points in UAE 28000 1456000
Emirates
United King-
38 3 March 1994 Multiple Points in UK 600 31200
dom
Points in Viet
39 Viet Nam 20 Oct. 2015 Multiple 2800 145600
Nam
29 November Points in Cam-
40 Cambodia Multiple 2800 145600
2018 bodia
Note: Assumption of Air seats Aircraft type B757 with approximately 200seats/flight
***21 touristic destination+ Deharadun, Bagdogra and Gorakhapur with unlimited seats.

48 CAAN Report 2019-20


Projects

CAAN Report 2019-20 49


National Pride Projects

Gautam Buddha International


Airport Project
The project suffered various obstructions from
its inceptions; notable ones are earthquake of
2015, blockade from India, Terai movement and
recently Corona epidemic causing delay in the
project completion.
The project has achieved substantial completion
in civil work as airfield, apron and landside parking
is already completed. The International Terminal
Building, Administrative Building and Crash fire
Rescue building are nearing the completion as View from airside-ITB
minor finishing works are outstanding.
The project is lagging in installation of
Electromechanical equipments, Aeronautical
Ground lighting and Terminal facilities due to the
disturbance in supply chain, as these equipment
has to be imported from overseas country mostly
from China. The contractor has been exploring
to import these goods using various inland and
sea routes. The impending Corona epidemic has
added uncertainty on the date of completion of
the project and supposed to be operational in
coming fiscal year.
The physical and financial progress of the project
as of November 2020 is about 93% and 64%
respectively.
View from Landside–Administrative building,
Control tower and Terminal Building

Pokhara Regional International Airport


Project (PRIA)
The Construction of Pokhara Regional International
Airport is currently ongoing even amidst the
coronavirus pandemic which has almost brought
the entire world to a standstill. Thus far, we have
completed Physical Progress is at 66 % and the
Financial Progress is 50.27 % till November 2020.
In terms of major accomplishment for Physical
infrastructure, the runway, taxiway, apron as well
as isolated parking in the Airside of the Aerodrome
has already been completed. The pavement
Completed runway of GBIA structure of this Airport has been designed as
a Rigid Pavement, a first instance in Nepal, to

50 CAAN Report 2019-20


increase its durability and design life considering logistics works, the Airport will be ready by the end
the frequent rainfall in Pokhara region. of July 2021. However, the operation of Airport
is a complex process which requires completion
Similarly, the civil works for the Terminal, Hangar,
of Testing, Commissioning as well as acceptance
ATC Building as well as other ancillary facilities
from International Civil Aviation Organization.
for the airport such as Office, Customs & Cargo,
Similarly, the operation team and modality, flight
Firefighting, Central and Lighting Substation,
routes, resources such as fuel, electricity, internet,
Garage, Water Supply Buildings are also
telecom etc. need to be arranged by the end of
completed. Storm water and Irrigation drainage
system as well as Access road, Periphery Road July 2021 to commence operation.
and Terminal Area Road works are expected to be
completed soon.
Furthermore, an essential part of this Project is
its Communication, Navigation and Surveillance
(CNS) system, Rescue and Firefighting facilities,
Passenger Service facilities, Power Supply
Facilities as well as Security Facilities which covers
significant portion of the works. The Production,
Procurement and transportation of these works/
items have been completed and are waiting for
their delivery at site.
For the Navigation system, the Pokhara Regional
International Airport will be equipped with
DVOR/DME Equipment as well as Category-I
Precision Approach ILS system which includes
equipment such as Localizer and Glide Path to
help the aircraft with Instrument Landing System
during adverse weather. The Airport will also be
equipped with Wide Area Multilateration (WAM)
based surveillance system and passenger boarding Terminal Building
bridge system which will be used for the first time
in Nepal. Nijgadh International Airport (NIA)

There are three settlements in the project area,


of which the compensation distribution of private
land, house, Trees, and other man made features
is in progress. As of 15th Ashadh 2077, the title
of 65 bigaha (Approx.) of private land has been
transferred in the name of Civil Aviation Authority
of Nepal (Second International Airport Project).
The fencing work in the southern boundary
and various part of the project area (Sahajnath
Mandir Road, Kathgaun Road, Tangiya Basti road,
Tamagadhi road) has been completed.
As of 2077/03/15 the 2518 meter of River training
work in Pasaha river is about to complete and the
contract has been made for the river training work
in Bakaiya river.
Arial View of PRIAP For the first phase development of SIAP in the
If we can swiftly overcome the Coronavirus 1900Ha area tree and pole enumeration and data
Pandemic and start full-fledged construction and collection work is in progress.

CAAN Report 2019-20 51


Photographs:

Phase wise Development Planning on Strata Division Map of SIA Forest

Preparation
Works
Undergoing at
NIA Site

52 CAAN Report 2019-20


Airports Development Projects
Contract ATCEP/NCB-01: Runway Extension and
Associated Works:
This package includes the extension of existing
runway of TIA towards south (02) by 300 meters
and additional 300 meters including 60 meters
Runway Strip and 240 meters Runway End Safety
Area (RESA). This contract package also includes
the construction of perimeter road, drainage
system, placement of airfield ground lights and
approach lights.
Letter of Acceptance: December 05, 2018
Date of Agreement: December 19, 2018
Date of Commencement: January 02, 2019
Date of Completion: June 27, 2020
Date of Completion(Revised): December 30, 2020
Till to-date (June 20, 2020): Substantially
completed (96%)
Up to-date Status:
Contractor started the runway extensions work
on January 02, 2019. All construction works
were continued and final asphalt surface course
completed on May 29, 2020. The critical part near
the existing runway end was carried out during the
COVID-19 lockdown period. The existing Runway
and Threshold Markings and the Airfield Lights Runway Threshold Light, and Precision Approach
were displaced at temporary position (120-meter Light at Runway 02 End were reinstated at their
north from Runway End 02) on March 31, 2020 original position on June 02, 2020 along with
for runway extension construction works. After pavement marking.64
completion of runway pavement works, existing Contract Package ATCEP/NCB-02: International
Terminal Building Expansion & Reconfiguration
and Associated Works at TIA:

Present International Terminal Building (ITB) was


constructed in the year 1990 and extended in 2000
along with total gross floor area of 21,700 Sqm.
After 19 years of expansion, due to increasing in
air traffic & demanding of passenger facilities,
present ITB is going to be expanded as follows:
- Construction of ITB Expansion (total expansion
area: 3,841.89 Sqm.) inclusive of new Gate
Lounge (Departure Gates) of 1,980.34 Sqm.,
Arrival Bus Station of 427.04 Sqm., Additional

CAAN Report 2019-20 53


Baggage Claim Area of 1,434.51 Sqm. Screening Area, Passenger Lounge, Immigration
and Custom Area;
- Reconfiguration of existing ITB at airlines
Check-in area, relocation of Check-in Security - Installation of Baggage Handling System at
Departure Check-in area, Airport Security
System, Flight Information Display System and
Associated MEP works
Letter of Acceptance: August 11, 2017
Date of Agreement: August 30, 2017
Date of Commencement: November 15, 2017
Date of Completion (Original): August 06, 2019
Date of Completion (Revised): December 27, 2020
Till to-date (November 30, 2020): 85%
Up to-date Status:
Gate Lounge (Departure Gates) with 6 nos. of
gates was opened for international passenger
movement on April 01, 2020. Demolition of
existing sterilize hall was started on April 22, 2020
to develop the ramp road and airside GSE apron.

54 CAAN Report 2019-20


Financial Information

CAAN Report 2019-20 55


Civil Aviation Authority of Nepal
Approved Budget for FY 2077/78 (2020/21)
Sources(Rs.) Uses(Rs.)
Income 2.0732 Billion Capital Budget 30.6448 Billion
Airport Development 602.8 Million Staff Emolument 1.384 Billion
Fund
Loan/Share/Grant from Retirement Payment 524 Million
GoN 20.9565 Billion
  Other Operating Budget 1.66 Billion
Total 23.6325 Billion Total 34.218 Billion
Receivable from GoN 865.5 Million VAT Payment 3.3443 Billion
Retirement Fund & Other 357.60 Million
Vat Credit 1.2662 Billion Payment
Staff Bonus (upto 2073/74) 789.7 Million
Total Income 25.7662 Billion Aircraft Operation Fund (Non 627 Million
Operative A/C)
Advance & Mobilization 3.2999 Billion Asset Replacement Fund 1.5348 Billion
Opening Bank Balance Bhojpur
10.3538 Billion Tax Airport
Provisions 400 Million
Total 42.1208 Billion Total 41.113 billion
Net Saving 10.5 Million    

Bhojpur Airport
Brief Description
Bhojpur Airport is situated at Bhojpur Municipality of Bhojpur District, Province No. 1. The
CAANisReport
56 District 2019-20
recently connected with the earthen road

Name BHOJPUR
Civil Aviation Authority of Nepal
Officewise Income Summary(FY 2076/77)
SN CAAN Office Total Income
1 Aircraft Operation Fund 1,492,800.00
2 Bajura CAO 344,096.30
3 Bharatpur CAO 28,517,552.23
4 Bhojpur CAO 166,657.67
5 Biratnagar CAO 73,206,877.66
6 Chandragadhi CAO 26,081,519.80
7 Chaurjahari CAO 38,862.78
8 Civil Aviation Academy 8,067,926.55
9 Dang CAO 1,641,579.21
10 Dhangadhi CAO 18,858,076.51
11 Dolpa CAO 638,211.54
12 Flight Safety Standard 78,701,160.31
13 Gautam Buddha International CAO 43,309,088.41
14 Janakpur CAO 1,141,772.91
15 Jomsom CAO 4,088,701.87
16 Jumla CAO 1,071,607.73
17 Central Revenue Unit 17,475,025.45
18 Lamidanda CAO 5,325.00
19 Tenjing Hillary CAO 11,946,650.28
20 Nepalgunj CAO 56,158,644.44
21 Phaplu Civil Aviation Office 1,431,667.30
22 Pokhara CAO 71,906,996.38
23 Rajbiraj CAO 1,062,070.15
24 Ramechhap CAO 5,043,840.19
25 Rara CAO 2,166,196.12
26 Rumjatar CAO 118,796.10
27 Salle CAO 306,013.26
28 Sanphebagar CAO 39,563.15
29 Simara CAO 11,316,041.47
30 Surkhet CAO 4,504,979.68
31 Taplejung CAO 726,170.49
32 Thamkharka CAO 60,186.84
33 Tribhuvan International Airport CAO 5,490,781,211.00
34 Tumlingtar CAO 1,904,248.75
  Total Income 5,964,320,117.53

Note : TIA Income Consists ADF Income Of 1,347,794,095.81

CAAN Report 2019-20 57


Civil Aviation Authority of Nepal
Officewise Expenses Summary(FY 2076/77)
SN Caan Offices/Branches Budget (with Vat) Total Expenses Percent
1 Board/DGCA Secretariat 30,134,750.00 17,219,488.58 57.14%
2 Air Navigation Services Directorate 8,026,750.00 4,217,093.19 52.54%
3 Aviation Security Department 25,125,425.00 11,993,159.30 47.73%
4 Aerodrome Engineering Department 3,167,392,597.57 1,609,479,900.30 50.81%
5 Finance Department 5,268,598,645.27 2,489,189,358.80 47.25%
6 Administration Department 126,298,919.00 103,732,357.21 82.13%
7 Com. & Nav. Aid Department 484,939,890.64 49,779,348.64 10.27%
8 Civil Aviation Academy 152,019,810.00 42,085,414.26 27.68%
9 Internal Audit Department 17,573,350.00 6,397,946.85 36.41%
10 ATM Department 21,783,700.00 8,487,940.82 38.96%
11 ANS Safety Standards Department 4,043,500.00 1,493,173.85 36.93%
12 Aerodrome Safety Standards Department 7,108,150.00 2,805,065.37 39.46%
13 National Pride Project 6,928,267,523.27
14 Gautam Buddha Airport Enhancement Project 536,491,065.12
Gautam Buddha Airport Enhancement Project (Land
Acquisition)
22,733,586,165.98 43.11%
15 2,146,646,646.60
16 Second International Airport Project 67,248,206.70
17 Pokhara Regional International Airport Project 121,607,862.14
18 ATCEP 6,395,267,050.19 3,141,804,301.83 49.13%
19 Taplejung Civil Aviation Office 3,303,290.00 2,618,187.62 79.26%
20 Chandragadhi Civil Aviation Office 21,762,335.00 15,008,492.38 68.97%
21 Tumlingtar Civil Aviation Office 6,269,465.00 4,043,887.18 64.50%
22 Bhojpur Civil Aviation Office 3,089,210.00 2,259,903.47 73.15%
23 Biratnagar Civil Aviation Office 83,488,495.00 69,400,285.59 83.13%
24 Lamidanda Civil Aviation Office 2,590,040.00 1,522,350.03 58.78%
25 Tenzing Hillari Airport Civil Aviation Office 10,812,255.00 8,367,188.41 77.39%
26 Rumjatar Civil Aviation Office 2,838,690.00 1,460,358.37 51.44%
27 Phaplu Civil Aviation Office 3,259,690.00 2,559,843.90 78.53%
28 Thamkharka Civil Aviation Office 2,911,810.00 640,116.31 21.98%
29 Manamaya Rai Khanidanda Civil Aviation Office 1,942,840.00 758,150.30 39.02%
30 TIA Civil Aviation Office 1,433,534,633.47
3,898,781,284.00 45.18%
31 TIA Civil Aviation Office (ADF) 327,876,784.11
32 Janakpur Civil Aviation Office 17,668,575.00 11,864,955.29 67.15%
33 Ramechhap Civil Aviation Office 4,609,210.00 3,610,553.42 78.33%
34 Simara Civil Aviation Office 21,140,348.27 11,704,035.31 55.36%
35 Bharatpur Civil Aviation Office 14,279,605.00 9,840,293.43 68.91%
36 Pokhara Civil Aviation Office 31,238,411.20 20,220,046.83 64.73%
37 Gautam Buddha Airport Civil Aviation Office 84,076,615.00 22,862,304.67 27.19%
38 Manang Civil Aviation Office 565,790.00 312,137.20 55.17%
39 Jomsom Civil Aviation Office 6,707,860.00 3,989,502.09 59.48%

58 CAAN Report 2019-20


40 Nepalgunj Civil Aviation Office 52,235,610.00 33,367,604.41 63.88%
41 Surkhet Civil Aviation Office 8,364,125.00 6,224,744.69 74.42%
42 Dang Civil Aviation Office 4,129,193.00 3,417,035.51 82.75%
43 Rukum (Salley) Civil Aviation Office 2,040,640.00 1,477,459.21 72.40%
44 Dolpa Civil Aviation Office 2,899,540.00 2,005,648.98 69.17%
45 Jumla Civil Aviation Office 4,439,040.00 2,680,433.30 60.38%
46 Simikot Civil Aviation Office 8,363,110.00 6,060,130.18 72.46%
47 Dhangadhi Civil Aviation Office 14,196,547.30 10,005,427.12 70.48%
48 Sanfebagar Civil Aviation Office 3,071,990.00 2,103,453.51 68.47%
49 Bajhang Civil Aviation Office 754,440.00 127,785.00 16.94%
50 Doti Civil Aviation Office 641,800.00 22,284.77 3.47%
51 Bajura Civil Aviation Office 3,146,950.00 199.02 0.01%
52 Rara (Mugu) Civil Aviation Office 4,256,760.00 1,487,973.55 34.96%
53 Rescue & Fire-fighting Department 199,128,500.00 99,092,281.19 49.76%
54 Electromechanical Department 934,004,426.00 296,787,065.16 31.78%
55 Civil Aviation Safety Regulation Department 54,266,460.00 26,051,988.13 48.01%
56 Human Resource Development Department 147,255,940.00 38,477,180.99 26.13%
57 Domestic Airports Facilitation Department 10,851,250.00 8,077,926.90 74.44%
58 ICAO, Intl. Affairs and Legal Department 6,679,900.00 1,953,606.12 29.25%
59 AIM Department 130,142,000.00 2,346,993.30 1.80%
60 Corporate Directorate 103,534,000.00 4,670,030.00 4.51%
61 Corporate Planning and Monitoring Department 353,742,180.00 56,422,521.34 15.95%
62 CNS P & D Department 201,019,390.00 36,381,926.47 18.10%
63 Civil Aviation 3,459,800.00 3,352,435.45 96.90%
64 Aerodrome Operations Directorate 1,126,000.00 98,329.50 8.73%
65 Pension Fund 372,110,000.00 240,332,839.01 64.59%
66 Improvement of ASF Project 1,501,246,500.23 5,693,788.90 0.38%
67 Emergency Fund 89,948,000.00 25,567.75 0.03%
68 Employee Welfare Fund 290,000.00 61,213.00 21.11%
69 Flight Safety Standards Department 75,393,550.00 41,705,323.83 55.32%
70 Baglung Civil Aviation Office 1,275,840.00 545,678.89 42.77%
71 Rajbiraj Civil Aviation Office 4,438,760.00 3,073,014.07 69.23%
72 Kangeldanda Civil Aviation Office 962,290.00   0.00%
73 Rukum Chaurjahari Civil Aviation Office 2,450,940.00   0.00%
  Total 46,965,099,993.65 20,177,529,751.46 42.96%

CAAN Report 2019-20 59


Statistics

60 CAAN Report 2019-20


Flight Movement Data 2015-19
TIA INTERNATIONAL TIA DOMESTIC

Bajura Airport Aircraft Movement Bajura Airport Aircraft Movement


40000 Aircraft Movement
35000 AircraftMovement
Aircraft Movement 33842
33362 32439 120000 Aircraft Movement
Aircraft Movement
30000 26563 27118 95580
40000 100000
120000
40000 93107 91816
25000 1500 33362 33842 1500 33362 33842
1600
35000 32439 1600
35000 32439
80000 73876 95580
20000 100000 65865 93107 91816
1400
30000 26563 27118 1400
30000 26563 27118
15000
25000
1200
Aircraft Movement 1092 60000
25000
1200 73876 1092
1068 80000 1068
10000 966 65865 966
40000
20000
1000 20000
1000
40000
5000 33362 33842 32439 60000
35000
15000800 15000
692 800 692
0 20000
30000
10000 26563 27118 10000
600 2015 2016 2017 2018 2019 40000
600
25000
5000 5000 0
400 A/C 400
200000 20000
0 2015 2016 2017 2018 2019
200 200 Aircraft Movement
15000 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

10000 0 00
2015 2016Pax Movement
A/C
2017 2018 2019 120000 2015
2015 Passenger
2016
2016
A/CMovement
2017
2017 2018
2018 2019
2019
5000 95580
5000000 3500000
100000 93107 91816
3188479
0 4343137
4500000 4138563 2847752
2016 Pax Movement
Passenger Movement 3000000 Pax Movement
Passenger
73876
Movement
4000000
2015
3510742
3887845
2017 2018 2019 80000
65865 Passenger Movement
2451390
2500000
14000 3217162
5000000
3500000 A/C 60000
5000000
14000
3500000
4343137 4343137 3188479
4500000
3000000 11807 4138563 4500000
2000000
40000 1757596 11807 4138563
12000 3887845 12000 3887845 2847752
4000000
2500000 10606 3000000
4000000 10606
9717 3510742 1364048
9717 3510742
1500000
20000
10000 3217162
3500000
2000000 Pax Movement
8632 10000 3217162
3500000 8632 2451390
8112 2500000 8112
3000000
1500000 3000000
1000000
0
8000
5000000 8000 2015 2016 2017 2018 2019
2500000
1000000 4343137 2500000
2000000 1757596
4500000 4138563 500000
6000
2000000
500000 3887845 6000
2000000
4000000 15000000 1364048
15000000 3510742 1500000 Passenger Movement
4000 3217162
3500000 4000
1000000 2015 2016 2017 2018 2019 1000000 2015 2016 2017 2018 2019
3000000 1000000
3500000 3188479
2000
500000 2000
500000
25000000 Passenger 3000000 2847752
0 500000
00 2451390
2000000 2015
2015 2016
2016 2017
2017 2018
2018 2019
2019
2500000 2015
2015
Cargo
2016
2016
Movement
2017
2017
(In Kgs)
2018
2018 2019
2019
1500000 2000000
0 1757596
1000000 Cargo Movement
Passenger (in Tons) 5000000
1500000
2015
1364048
4374946
2016 Passenger2017 2018 2019
4500000 4114386
500000
30000
24512.73
Cargo Movement (In Kgs) 1000000
4000000
Cargo Movement (In Kgs)
3951321
3693070
0
25000
200000 2015 Cargo
2016 Movement
187106 20348.94 2017(in Tons)20549.465
20665.929 2018 2019 500000
200000
3500000 187106 Cargo Movement
Cargo Movement (in Tons)
(In Kgs) 3112950
20000 0
180000
30000 Passenger 14959.481 180000
3000000
30000
15000 24512.73 156982 5000000 24512.732015 2016 156982
2017 2018 2019
160000
25000 160000
2500000
25000 4374946 20348.94
10000 20348.94 20665.929 20549.465 4500000 20665.929 20549.465
140000 140000 4114386
20000 20000
2000000 3951321
5000 117284 14959.481 Cargo
117284Movement (In Kgs) 14959.481
120000
15000 Cargo Movement (in Tons) 4000000
120000
15000
1500000
3693070
0 5000000
3500000
100000 2015
10000
30000 2016 2017 2018 2019 100000
10000
1000000 4374946 3112950
79089 4500000 4114386 79089
24512.73 3951321
500080000
25000 3000000
80000
5000
500000
4000000 3693070
20348.94 20665.929
Cargo 20549.465
20000060000 2500000
60000
3500000
0 0 3112950
39208 14959.481 39208
1500040000 2015 2016 2017 2018 2019 40000 2015 2015 2016 2016 20172017 20182018 2019
3000000 2019
2000000
2500000
1000020000 Cargo 20000
1500000 Cargo
2000000
5000 0 0
1000000
1500000
0 2015 2016 2017 2018 2019 1000000
2015 2016 2017 2018 2019
500000
2015 2016 2017 2018 2019 500000
0
0
Cargo
2015
2015 2016
2016 2017
2017 2018
2018 2019
2019

CAAN Report 2019-20 61


HUB AIRPORTS

Flight Movement Data 2015-19


HUB AIRPORTS
BIRATNAGAR GAUTAM BUDDHA
Biratnagar Gautam Buddha Airport
Flight Movement Data 2015-19
Aircraft Movement Aircraft Movement
HUB AIRPORTS Gautam Buddha Airport
9000 8258
Biratnagar
11000 10678 8000
7742
Aircraft Movement
7736

Flight
10500 Movement Data 2015-19 7000
6000
9904
10000 Aircraft HUB
Movement 9812
AIRPORTS 5000
3751
4666

9362 9000
4000 8258
9500 9342 7742 7736
8000
Biratnagar
3000
9000
11000 10678 7000
2000
1000
6000
8500
10500 Gautam Buddha Airport
4666
2015 Aircraft
2016 Movement
2017 2018 2019 50000
9904 9812 3751
2015 2016 2017 2018 2019
10000 4000
9362 9342 3000
Aircraft Movement
9500
11000 Pax Movement 10678 2000 Pax Movement
9000 1000
9000
450000 8258
10500
700000 7742 7736
388378
8500 0
8000 377692
9904 9812 596453 400000
10000 2015 2016 2017 2018 2019 7000 2015 2016 2017 2018 2019
600000 537780 350000
9362 9342 6000 300393
9500 300000 4666
500000 455284 5000
3751
9000 Pax
377077 Movement 250000
4000 Pax Movement
400000 340202 3000
200000 168421
8500 450000
700000 2000
150000
300000 2015 2016 2017 2018 2019 107914 388378
596453 1000
400000
100000
377692
600000 537780 0
200000 350000
50000 2015 2016 2017 2018 2019
300393
500000
100000 Pax Movement
455284
3000000
377077 2015 2016 2017 2018 2019
400000 250000
7000000 340202 Pax Movement
2015 2016 2017 2018 596453
2019 200000 168421
300000
600000 450000 Cargo Movement (In Kgs)
537780
150000 107914 377692 388378
200000 400000
300000
500000 455284 100000
278865.1
350000
100000
400000 340202
Cargo Movement(In Kgs)
377077 50000
250000
300000
300393
225060.63
7000000 644011 0
250000 202626.54
300000 200000
2015 2016 2017 591926.6
2018 2019 200000 2015 2016
168421 2017 2018 2019
600000 542309 530634.6 533690.7 148639
200000 150000 135294.4
150000 107914
500000
100000
Cargo Movement(In Kgs)
100000
100000
Cargo Movement (In Kgs)
400000 50000
0 3000000 278865.1
700000 644011
2015 2016 2017 2018 2019
300000 50000 2015 2016 2017 2018 2019
591926.6
600000 542309 530634.6 533690.7 250000
200000 0 225060.63
500000
100000 Cargo Movement(In Kgs) 2015
Cargo Movement
2016 2017
(In Kgs)
202626.54
2018 2019
200000
400000 300000 278865.1
7000000 644011 148639
300000 2015 2016 2017 591926.6
2018 2019 150000 135294.4
600000 542309 530634.6 533690.7 250000 225060.63
200000 202626.54
500000 100000
200000
100000
400000 148639
50000
150000 135294.4
0
300000
2015 2016 2017 2018 2019
100000
0
200000
2015 2016 2017 2018 2019
100000 50000

0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

62 CAAN Report 2019-20


NEPALGUNJ POKHARA
Nepalgunj Airport Pokhara Airport

Aircraft Movement Aircraft Movement


Bajura Airport Bajura
Pokhara
45000
Airport
Airport 42358
18000 39920
15698 40000
Nepalgunj Airport Aircraft 13838
16000
Movement
14822
35000 Aircraft
36077
Aircraft Movement
Movement
14000
12000
11362 Pokhara
30000 Airport
29303
9918 Aircraft Movement 25000
23927
Nepalgunj1500Airport
10000
1600
8000
45000 1500
1600
20000 Aircraft Movement
42358
39920
1400 40000
1400 36077
6000 15000
18000
1200
4000
16000
Aircraft Movement
1068 1092
14822
15698 35000
1200
10000 29303 1068 1092
966 13838 45000
30000 966 42358
2000
1000
14000 10005000 39920
40000 23927
0 11362 250000 36077
12000
800
18000 9918 692 800 692
2015 2016 2017 2018 2019
15698 35000
20000 2015 2016 2017 2018 2019
10000
16000 14822 29303
600 13838 600
30000
8000
14000 15000
400
6000
12000
Pax
11362 Movement 400
25000
10000
23927
Pax Movement
9918
4000
200
10000
500000 200
20000
800000
5000
453433 720714
2000
80000
450000 426661
0 0
15000
700000
609975
60000 2015 2016 369355
2017 2018 2019
400000
2015 2016 2017 2018 2019 10000 2015
600000 2015 2016
2016 2017
2017 2018
2018 2019
2019
4000
350000 500000
5000 446024
2000
300000
0
250000 Pax Movement
Passenger
233533 Movement 400000
0 328031 Passenger
328031 Movement
Pax Movement
2015 2016 2017 2018 2019 300000 2015 2016 2017 2018 2019
200000
500000 176372 800000
14000 453433 14000 720714
426661 200000
150000
450000 11807 11807
12000
100000
400000
Pax Movement
10606
369355
700000
12000
100000
Pax Movement
10606 609975
9717 600000 9717
10000
50000
350000
500000 8632 10000 0 8632
453433
8112 800000 2015 2016 2017 2018 8112
2019
426661 500000 446024 720714
300000
4500000
8000 8000
2015 233533
2016 2017 2018 2019 700000
250000
400000 369355 400000 328031 328031 609975
6000
200000
350000 176372 6000
600000
300000
Cargo Movement (In Kgs)
4000 4000
150000
300000
Cargo Movement(In Kgs)
233533
500000
160000
200000
138253
446024
150896
100000
250000
2000 400000
2000
140000 133234 135506
100000 328031 328031
2500000
50000
200000 176372
0 300000
0 0
120000 111604
1500000
2015
2015 2016
2016 2017
2017 2018
2018 2019
1936861
2019 200000 2015
2015 2016
2016 2017
2017 2018
2018 2019
2019
100000
2000000 1847952 1851395 100000
50000 1719604 100000
1583396 80000
0 Cargo Movement (InKgs)
Kgs) Cargo
CargoMovement
Movement (In
(In Kgs)
Kgs)
2015 Cargo Movement(In 0
1500000 2016 2017 2018 2019 60000
2015 2016 2017 2018 2019
200000
2500000 187106 200000
40000 187106
160000 150896
180000
1000000 180000 138253 135506
133234
160000
Cargo Movement(In
156982 Kgs)
1936861
140000
20000
160000 Cargo Movement
156982(In Kgs)
2000000 1847952 1851395
2500000 1719604 1200000 111604
140000
500000 160000
140000 2015 2016 150896
2017 2018 2019
1583396
117284 117284
120000 100000
120000 138253 135506
1500000 140000 133234
1936861
2000000
100000 1847952 1851395 100000
80000
0 1719604 79089 120000 111604 79089
80000 2015 2016
1583396 2017 2018 2019 80000
1000000 60000
60000
1500000 100000
60000
39208 39208
40000 40000
40000
80000
500000
20000
1000000 20000
20000
60000
0 0
0 0
2015 2016 2017 2018 2019 40000 2015 2016 2017 2018 2019
500000 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
20000

0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

CAAN Report 2019-20 63


OTHER DOMESTIC AIRPORTS
BAJURA BHARATPUR
Bajura Airport Bharatpur Airport
Aircraft Movement Aircraft Movement
Bharatpur Airport
Bajura Airport
1500
1600 9000 8182
7774
1400
Aircraft Movement
8000 Aircraft Movement
Bharatpur Airport
1200 1068 1092 7000 6050
Bajura
1000
Airport 966 6000

1500
5000
9000 Aircraft
4612 Movement
8182
1600
800 692
7774
600
1400
Aircraft Movement 4000
8000
3000 2340
9000
7000 8182
400
1200 1068 1092 2000 7774 6050
8000
200
1600 1500 966 6000
1000
1000 7000 4612 6050
0 5000
0
6000
1400
800 692
2015 2016 2017 2018 2019 4000 2015 2016
4612 2017 2018 2019
5000
1200
600 1068 1092
966 3000
4000 2340
1000
400 Passenger Movement 3000
2000 2340
Passenger Movement
800 692 2000
200
14000 1000
300000
1000
600
0 11807
00 257709
12000 10606
400 2015
9717 2016 2017 2018 2019 250000 2015
2015 2016
2016 2017
2017 2018
229495
2018 2019
2019
10000 8632
200 8112
8000 200000
170734
Passenger Movement Passenger Movement
0
6000
2015 2016 2017 2018 2019 150000 Passenger Movement
150345

14000 300000
4000
11807 300000 257709
100000
12000
2000 10606 250000 257709 229495
9717 Passenger Movement 250000
54238
100000 8632 50000 229495
2015 2016 2017 2018 8112
2019 200000
14000 170734
8000 11807 150345
12000 0
200000
150000
10606 2015 2016 2017 2018 170734
2019
6000
10000
9717 Cargo Movement (In Kgs) 150345
8632 100000
150000
4000
200000 187106 8112
54238
8000
180000
2000 50000 Cargo Movement (In Kgs)
156982 100000
6000
160000 180000
0 163297
140000 0
160000
54238
4000 2015 2016
117284 2017 2018 2019 2015 2016 2017 2018 2019
50000 138806
120000 140000 126154 131023
2000
100000 120000
79089
0
80000 Cargo Movement (In Kgs) 100000
0
81126
Cargo Movement (In Kgs)
60000 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
200000 187106 39208 80000
180000 163297
40000 60000
160000
180000 138806
20000
1600000 Cargo Movement (In
156982 Kgs) 140000
40000
Cargo Movement (In Kgs)
126154 131023
120000
20000
140000
200000 2015
187106 2016 2017 2018 2019
100000
117284 1800000 81126 163297
120000
180000 80000 2015 2016 2017 2018 2019
156982 160000
100000
160000 60000 138806
79089 140000 126154 131023
80000
140000 40000
117284 120000
20000
60000
120000
39208 1000000
40000
100000 81126
2015 2016 2017 2018 2019
79089 80000
20000
80000
600000 60000
2015 2016 2017 39208
2018 2019
40000 40000
20000 20000
0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

64 CAAN Report 2019-20


Bhojpur
BHOJPUR Airport Chandragadi Airport
CHANDRAGADHI

Aircraft Movement Aircraft Movement

Bhojpur
600 Airport 526 6000
4768 4928
500 444 Chandragadi
5000 4300 Airport
4106
4522

400 348
Aircraft Movement 372 4000
Aircraft Movement
300 3000
600 196
Bhojpur
200 Airport 526 2000
500 444 Chandragadi
6000 Airport 4928
100 1000
5000 4522
4768
372 4300
400
0
348 Aircraft Movement 0
4000
4106
Aircraft Movement
300 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
196 3000
600
200 526 6000
2000
500
100 Passenger 444
Movement 5000
1000
Passenger 4522
Movement4768 4928
4300 4106
9000
400 372 300000 281000
0 348 40000
8000 2015 7668
2016 2017 2018 2019 2015 2016 2017 2018 2019
300 6921 3000
250000 228128
7000 196
200 2000 192584
6000
5035 Passenger Movement 5399 200000 Passenger Movement
4694 1000 164891 161046
5000
100
9000 300000 281000
4000 150000
0
0
8000 7668
3000 2015 2016 6921
2017 2018 2019 250000 2015 2016 2017 2018
228128 2019
7000 100000
2000 192584
6000 5399 200000
1000
5000
5035
Passenger Movement 4694 50000
164891 Passenger
161046 Movement
0 150000
4000 300000 281000
9000 2015 2016 2017 2018 2019 0
3000
8000 7668 100000 2015 2016 2017 2018 2019
6921 250000 228128
2000
7000
1000
Cargo Movement (In Kgs) 50000
200000
192584
6000 5399
30000 5035
4694 0
164891 Cargo Movement (In Kgs)
161046
5000
2015
2550 2016 2017 2018 2019 150000
350000 2015 2016 2017 2018 2019
4000 315202
2500
3000 100000
300000 279716
2000
2000 Cargo Movement (In Kgs) Cargo Movement (In Kgs)
257607.6
50000
250000
1000 350000 220193
3000 315202 207897.3
15000 2550 2000000
300000 279716
2500 2015 2016 2017 2018 2019 2015 2016 2017
257607.6 2018 2019
1000 840 250000
150000
678 220193
207897.3
2000
500 Cargo Movement
265
(In Kgs) 200000
100000 Cargo Movement (In Kgs)
239
3000
1500 350000
150000
50000 315202
0 2550
2500 2015 2016 2017 2018 2019 300000
100000 279716
1000 840 0
678 257607.6
250000
50000 2015 2016 2017 2018 2019
2000 220193
500 265 207897.3
239
2000000
15000 2015 2016 2017 2018 2019
2015 2016 2017 2018 2019 150000
1000 840
678 100000

500 265 239 50000

0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

CAAN Report 2019-20 65


Dhangadi
DHANGADIAirport Dolpa Airport
DOLPA
Aircraft Movement Aircraft Movement

3500 1800 1638


Dhangadi Airport 3076 Dolpa
1600 Airport
1556 1496
3000
2530 2560 1400 1274
1200
2500
Aircraft Movement 1200 Aircraft Movement
2000 1000
1500 800
1800
3500 1150 1086 3076 Dolpa
600 Airport
1600
1638
1556 1496
1000
Dhangadi
3000 Airport 2530 2560 400
1400 1274
500
2500 200
1200 Aircraft Movement
1200

0
2000 Aircraft Movement 0
1000
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
1500 800
1800
1150 1086 1638
600 1556 1496
3500 1600
1000
Passenger Movement3076 400 Passenger Movement
3000 1400 1274
500 2530 2560 1200
200000 25000
200
1200
2500 177698
0
180000 10000 19352
2000 2015 2016 2017 2018 2019
150295 20000 2015 2016 2017 2018 2019
18463
160000 800
140000
1500 128035 600
1150 1086
120000
1000 Passenger Movement 15000
400 Passenger
12248 Movement
12217
100000
200000
500 200
25000 9184
80000 177698 10000
180000 62375 0
0
60000 45469 150295 2015 2016 2017 19352
2018 2019
160000 2015 2016 2017 2018 2019 20000 18463
40000 5000
140000 128035
20000
120000
0 Passenger Movement
150000 Passenger
12248 Movement
12217
100000 2015 2016 2017 2018 2019
2015 2016 2017 2018 2019 25000
80000
200000 10000 9184
62375 177698
60000
180000 45469
40000
160000 Cargo Movement (In Kgs) 150295 20000 Cargo Movement (In Kgs)
19352
18463
5000
20000
140000 128035 700000
120000
107788 15000 598003
0
120000 102060 600000
0 12248
536673 12217
100000
100000 2015 2016 2017
90967 2018 2019 2015 2016 2017 2018 2019
82540 500000
10000 9184
80000 77738
62375
80000 409160
60000 45469 Cargo Movement (In Kgs) 400000
Cargo Movement (In Kgs)
40000 5000
60000
120000 300000
20000 107788 700000 219802
102060 598003
0
40000
100000 200000
0
600000
90967 536673 116205
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
82540 100000
77738 500000
20000
80000
409160
0
0
Cargo Movement (In Kgs) 400000
2015 Cargo Movement
2016 2017(In Kgs)
2018 2019
60000
120000 2015 2016 2017 2018 2019 300000
700000
107788 219802
40000 102060 598003
100000 200000
600000
90967 536673 116205
20000 82540
77738 100000
500000
80000
409160
0 4000000
60000 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
300000
40000 219802
200000
116205
20000
100000

0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

66 CAAN Report 2019-20


Janakpur Airport Jhomsom Airport
JANAKPUR JOMSOM
Aircraft Movement Aircraft Movement

4500
Janakpur Airport 3975 Jhomsom
4500 Airport 4154
4000 4000 3574
3500
Aircraft Movement 2846
3500
Aircraft Movement
3222 3222
3000 3000 2804
2500 2073 2500
4500 4500 4154
2000 1724 3975 2000
1532
4000 4000
Janakpur
1500 Airport 1500 3574
3500 3500 3222 3222
1000 1000
3000 2846 Jhomsom
3000 Airport
2804
500 Aircraft Movement 500
2500 2073 25000
0
2000 2015 1724
2016 2017 2018 2019 2000 2015 Aircraft
2016 Movement
2017 2018 2019
1532
4500
1500 3975 1500
4000 4500
1000
3500
Passenger Movement 1000 Passenger Movement 4154
500 4000
500 3574
160000
3000 2846 60000 55651
3500 3222 3222
0 136678 0
140000
2500 2015 2016 2017 2018 2019 3000 2804
2015 2016 2017 46401
2018 2019
2073 50000
2000
120000 1724 2500 39715 41634
1532 40000 35766
1500 2000
100000 Passenger Movement 79296 Passenger Movement
1000 1500
30000
80000 64703
160000 60000 55651
500 53283 1000
60000 136678 20000
140000 44655 500
0 50000 46401
40000
120000 2015 2016 2017 2018 2019 0
10000 41634
39715
20000 40000 2015
35766 2016 2017 2018 2019
100000
0 79296 0
80000
2015 Passenger
2016 Movement
64703
2017 2018 2019 30000 2015 2016 2017 2018 2019
60000 53283 Passenger Movement
160000 44655
20000
60000 55651
136678
40000
140000
Cargo Movement (In Kgs) Cargo Movement (In Kgs)
20000 10000
50000 46401
120000 14000
120000 39715 41634
0
100000 107418.77 0
40000 35766 11557
2015 2016 2017 2018
79296 2019 12000
100000 2015 2016 2017 2018 2019
80000 64703 30000 9579
79131 53283 79020.27 79188.05 10000
60000 44655
80000
40000
Cargo Movement
71176.49 (In Kgs) 20000 Cargo Movement (In Kgs) 7198
8000
6663
120000
60000 14000
10000
20000 107418.77 6000 5057
0
100000 11557
40000 120000
2015 2016 2017 2018 2019 4000 2015 2016 2017 2018 2019
79131 79020.27 79188.05 9579
80000
20000 71176.49 10000
2000

60000
Cargo Movement (In Kgs) 8000 Cargo Movement (In Kgs) 7198
0 0 6663
120000 2015 2016 2017 2018 2019 14000 2015 2016 2017 2018 2019
107418.77 6000 5057
40000 11557
100000 12000
4000
20000 79131 79020.27 79188.05 10000 9579
80000 71176.49 2000
0 8000 7198
2015 2016 2017 2018 2019 6663
60000 0
6000 2015 2016 2017 2018
5057 2019
40000
4000

20000 2000

0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

CAAN Report 2019-20 67


Jumla Airport Lukla Airport
JUMLA TENZING HILLARY (LUKLA)
Aircraft Movement Aircraft Movement

1800 35000 31636


1588
Jumla
1600 Airport
Lukla
30000 Airport 27292
1400 1318
25000
1200
999
Aircraft Movement Aircraft Movement
20418 19690
1000 20000 16767
800 15000
1800 615 600 35000
1588 31636
Jumla
600
1600 Airport 10000
400
1400 1318 Lukla
30000 Airport 27292
5000
200
1200 Aircraft Movement 25000
0
1000
999 0 Aircraft
20418 Movement 19690
20000 2015
16767 2016 2017 2018 2019
2015 2016 2017 2018 2019
800
1800 615 600 15000
1588 35000
600 31636
1600
Passenger Movement 10000 Passenger Movement
400
1400 1318 30000 27292
30000 160000
5000 146879
200
1200 27282 25000
999 140000 20418 129508
0 0 119801 124929 19690
1000
25000
2015 2016 2017 2018 2019 20000
120000 2015
16767 2016 2017 2018 2019
800
20000 615 600 15000
16947 100000
600 81174
15154 15160 15230
15000
400 Passenger Movement 80000
10000 Passenger Movement
30000
200 60000
160000
27282 5000 146879
10000
0 40000
140000 129508
25000 0 119801 124929
5000 2015 2016 2017 2018 2019 20000
120000 2015 2016 2017 2018 2019
20000
0 16947 1000000
15230 81174
15000 2015 Passenger
15154
2016 Movement
15160
2017 2018 2019 80000
2015 2016 2017
Passenger Movement
2018 2019

30000 27282 60000


160000
10000
Cargo Movement (In Kgs) Cargo Movement (In Kgs)
146879
25000 40000
140000 129508
3500000 119801 124929
5000 20000
70000 120000 3118123
20000 16947
0 58631 3000000
0
100000
60000 15154 15160 15230 81174 2673023
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
15000 80000
2500000 2272955
50000 2190696
10000 60000
40000 Cargo Movement (In Kgs) 2000000
40000
Cargo Movement (In Kgs)
1550184
5000 3500000
70000 1500000
20000
30000 3118123
0 58631 0
3000000
60000 19875 18897 1000000 2673023
20000 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
50000 11261 2500000
500000 2272955
2190696
10000 6710
40000
Cargo Movement (In Kgs) 20000000 Cargo Movement (In Kgs)
1550184
700000 3500000
2015 2016 2017 2018 2019
30000 2015 2016 2017 2018 2019 1500000 3118123
58631
60000 19875 18897 3000000
1000000 2673023
20000
50000 11261 2500000 2272955
6710 500000 2190696
10000
40000 20000000
0 1550184
2015 2016 2017 2018 2019
30000 2015 2016 2017 2018 2019 1500000
19875 18897
20000 1000000
11261
10000 6710 500000

0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

68 CAAN Report 2019-20


PHAPLU
Phaplu Airport RARAAirport
Rara

Aircraft Movement Aircraft Movement


Phaplu Airport Rara
2500
Airport 2360
4500
3827 2116
4000
Aircraft Movement
3326 3297 2000 Aircraft Movement
3500
2965 1640
3000 2754
4500 1500
2500 1314 2360
2500
Phaplu
4000
2000
Airport
3827 Rara Airport 2116
3326 3297 1000
2000
3500 736
1500 2965 1640
3000
1000
Aircraft Movement 2754
500
Aircraft Movement
1500 1314
2500
500
2000 2360
45000 10000
2500
1500 3827
2015 2016 2017 2018 2019 736
2015 2016 2017 2018 2019
2116
4000
1000
3500 3326 3297 2000
500
2965 1640
500
3000 Passenger Movement 2754 Passenger Movement
15000 1314
25000 25000
40000 36928
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
2000
35000 1000 19360 19950
1500 20000 736 18651
30000
1000 Passenger Movement 500
Passenger Movement
25000 15000 13700
500
40000 36928 25000
20000
0
35000 0 19950
10000 18651 19360
15000 2015 2016
11811 2017 2018 2019 20000 2015 2016 2017 2018 2019
30000 11007 10603 9582
10000 4078
25000 5000 13700
15000
5000
20000
Passenger Movement Passenger Movement
0 0
40000
15000 36928 10000
25000
2015 11811
2016 2017
11007 2018
10603 2019 2015 2016 2017 2018 2019
35000 9582
10000 19360 19950
5000
20000 4078 18651
30000
5000
Cargo Movement (In Kgs) Cargo Movement (In Kgs)
250000 150000 13700
2500000 400000 369556
20000 2015 2016
2275415 2017 2018 2019 2015 2016 2017 2018 2019

15000 350000
10000
11811 1971259
11007 10603
2000000 9582
10000 Cargo Movement (In Kgs) 300000 4078 Cargo Movement (In Kgs)
5000
5000
2500000 1438941 400000
250000 369556
1500000 2275415 220127
1327417 204803 207829
0 0
350000
200000
2015 2016 1971259
2017 2018 2019 2015 2016 2017 2018 2019
2000000 949086
1000000 300000
150000
1438941Cargo Movement (In Kgs) 250000
100000 Cargo Movement (In Kgs)
220127
1500000 1327417 207829
500000 204803
41396
2500000 200000
50000
400000 369556
2275415 949086
1000000 1500000
0 1971259 350000
2000000 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
100000
300000
500000
41396
1438941 50000
250000 220127
1500000 1327417 207829
204803
0 2000000
2015 2016 2017 2018 949086
2019 2015 2016 2017 2018 2019
1000000 150000

100000
500000
41396
50000

0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

CAAN Report 2019-20 69


Rumjatar Airport
RUMJATAR Salle
SALLE Airport

Aircraft Movement Aircraft Movement

Rumjatar
600 Airport Salle
250 Airport
220 214
488
500 192
Aircraft Movement 200 Aircraft
170 Movement 186

400
150
600 250
300 220
488 214
100
Rumjatar
500
200 Airport
144
184
Salle
200 Airport 186 192
136 120 170
400 50
100
Aircraft Movement 150 Aircraft Movement
300
0 0
2015 2016 2017 2018 2019
184 100 2015 2016 2017 2018 2019
600
200 144 250
136 120 220
488 214
50
500
100
Passenger Movement 200 Passenger Movement186 192
170
400
0
2000 3000
0
2015 2016 2017 1738
2018 2019 150 2015 2016 2577
2017 2018
2483 2019
1800
300 2500 2350 2310
1600
184 100
1400
200 144 Passenger
136
Movement 2000 Passenger
1824
Movement
1200 120
2000
1000
100 50
3000
1500
1738 805 2577
1800
800 693 2483
2500
1000 2350 2310
1600
0
600 461 0
1400 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
400 247 2000
500 1824
1200
200
1000 15000
0
800
Passenger
693 Movement 805
2015
Passenger
2016
Movement
2017 2018 2019
2015 2016 2017 2018 2019
2000
600 461 1000
3000
1738 2577
1800
400 247 2483
1600
200 Cargo Movement (In Kgs) 500
2500 2350 Cargo Movement (In Kgs) 2310

1400
0 18000
350000 20000 1824
1200 2015 2016 2017 2018 2019 2015 15800
2016 2017 2018 2019
286350 16000
300000
1000 1500 14245
805
800 693 14000
250000
600 461
Cargo Movement (In Kgs) 1000
12000
Cargo Movement (In Kgs)
350000
400 247 18000
200000 10000
500
200 15800
300000 286350 16000
8000
150000
0 0 14245
2015 2016 2017 2018 2019 14000
6000 2015 2016 2017 2018 2019
250000 4550
100000 12000
4000
200000
50000 Cargo Movement (In Kgs)
27061 10000
2000 Cargo Movement (In Kgs)
0 0 0 27 0
150000
350000 80000
18000
0
2015 2016 2017 2018 2019 6000 2015 15800
2016 2017 2018 2019
100000 286350 16000 4550
300000 14245
4000
14000
50000
250000 27061 2000
12000
0 0 0 27 0
0
200000 100000
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
150000 8000
6000 4550
100000
4000
50000 27061 2000
0 0 0 27 0
0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

70 CAAN Report 2019-20


Simara Airport
SIMARA Simikot
SIMIKOT Airport

Aircraft Movement Aircraft Movement

10000 9500
Simara
9000
Airport 16000
Simikot Airport 13368
14725
13960
14000
8000
7000 Aircraft Movement 12000
Aircraft Movement 10614
6000 5374 5340 10000
5000 4594
8000 6470
10000
4000 9500 16000 14725
3108 13960
6000
9000
3000 Simikot Airport
14000 13368
8000
2000 4000
12000 10614
7000
1000
Simara
6000
0
Airport 5374 5340
2000
10000 Aircraft Movement
4594 0
5000 2015 2016 2017 2018 2019 8000 2015
6470 2016 2017 2018 2019
4000 3108 Aircraft Movement 6000
3000 16000 14725
13960
2000 Passenger Movement 4000
14000 Passenger
13368
Movement
10000
1000 9500 2000
250000 231291 12000
160000 10614
9000
0 0 138104
8000 2015 2016 2017 2018 2019 10000
140000 2015 2016 2017 2018 2019
200000
7000 8000
120000 6470
6000 5374 5340
150000
5000 Passenger
4594 Movement 134573 6000
100000 Passenger Movement
4000 107154 4000
250000 3108 231291 80000
160000
100000
3000 78756 57207 59770
2000
60000 54261 138104
2000 140000
200000 45525
50000
1000 0
40000
120000 21922
0 2015 2016 2017 2018 2019
134573 20000
150000 100000
0 2015 2016 2017 2018 2019
107154 0
2015 2016 2017 2018 2019 80000
100000 78756
60000
2015
Passenger
2016
57207 Movement
2017
59770 2018
54261
2019

45525
Passenger Movement 160000
50000
250000
Cargo Movement (In Kgs)
231291
40000
21922 Cargo Movement (In Kgs) 138104
140000
20000
140000 131403.31
0 2850000 2817448 2814508
200000 1200000
120000 2015 2016 2017 2018 2019 2800000 2015 2780856
2016 2017 2018 2019
100000 2767883
150000
100000 134573 2750000
80000
Cargo Movement (In Kgs)
107154
74867.1 77819.3 2700000 Cargo Movement
57207 59770(In Kgs)
54261
80000 74015 60000
100000 78756
140000 60896.83 131403.31 2650000
2850000
40000 2817448 2814508
60000 45525 21922 2590736
50000
120000 2600000
2800000 2767883 2780856
20000
40000 2550000
2750000
100000
0 0
20000 2015 2016 2017 2018 2019 2500000
2700000 2015 2016 2017 2018 2019
74015 74867.1 77819.3
80000
2450000
2650000
0 60896.83 2015 2016 2017 2018 2019
60000 2590736
2015 Cargo Movement
2016 2017(In Kgs)
2018 2019 2600000 Cargo Movement (In Kgs)
40000 131403.31 2550000
140000 2850000 2817448 2814508
2500000
20000
120000 2800000 2767883 2780856
2450000
0
100000 2750000 2015 2016 2017 2018 2019
2015 2016 2017 2018 2019
74867.1 77819.3 2700000
80000 74015
60896.83 2650000
60000 2590736
2600000
40000 2550000
20000 2500000

0 2450000
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

CAAN Report 2019-20 71


SURKHET
Surkhet Airport TAPLEJUNG
Taplejung Airport

Aircraft Movement Aircraft Movement

Surkhet Airport 500


6000 Taplejung Airport
5363
5099 Taplejung Airport
450
435
5000
Aircraft Movement 4567 400
350 Aircraft Movement
334 334
3765 299
4000
2990
300 Aircraft Movement
3000 250
6000 5363 500
5099 200
2000 435
450
Surkhet
5000 Airport 4567 150
500
400
100
90
1000 3765 334 334 435
4000 450
50
350 299
0 Aircraft Movement 2990 400
3000
3000 2015 2016 2017 2018 2019
250
2015 334
2016 334
2017 2018 2019
350 299
200
2000 300
6000 Passenger Movement
5363 Passenger
5099 Movement 150
250 90
1000 100
5000
25000 4567 3000
200 2691
50
0 3765 19941 150
0
2500 2393
4000
20000 2015 2016 2017 2018 2019 90
2015 2016 2094
2017 2018 2097
2019
15547
2990 100
3000 15234 2000
15000 50
2000
10000
Passenger
9803 Movement
7563
1500
0 Passenger Movement
1000 2015
893 2016 2017 2018 2019
1000
25000 3000
2691
5000
19941 500 2393
0 2500
20000
0 2015
15234
2015
2016
2016
2017
2017
2018
15547
2018
2019
2019 2000
0 Passenger Movement
2094 2097
2015 2016 2017 2018 2019
15000 3000
2691
Passenger
9803 Movement 1500
10000 Cargo Movement
7563 (In Kgs) 2500 893 Cargo Movement (In Kgs)
2393
25000 1000
3000000 1200 2094 2097
5000 2674460 19941
20000 2000
500
1000
975
2500000 2362092
0 15234 15547 0
800
1500
15000
2000000 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
1699014 559
9803 600 893
10000 1445398 1000
1500000 7563 400 Cargo Movement (In Kgs)
5000
Cargo Movement (In Kgs) 500
1000000 812210 200
1200 78
48.2 62
3000000
2674460 975
0
500000 100000
2015 2016 2017 2018 2019
2500000 2362092
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
800
0
2015 2016 2017 2018 2019 559
2000000 600
Cargo Movement (In Kgs)
1699014
Cargo Movement (In Kgs)
1445398 400
1500000
3000000
2674460 1200
200 78
2362092 48.2 62 975
2500000
1000000 812210 10000
2015 2016 2017 2018 2019
2000000
500000 800
1699014
1445398 559
15000000 600
2015 2016 2017 2018 2019
1000000 812210 400

500000 200 78
48.2 62
0 0
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019

72 CAAN Report 2019-20


Tumlingtar
TUMLINGTAR Airport RAJBIRAJ
Rajbiraj Airport
Tumlingtar AirportAircraft Movement
Aircraft Movement
Tumlingtar Airport
2050
1978
Aircraft Movement 290
2000 Rajbiraj
285 Airport
1950 Aircraft Movement
1906 280
1876
1900
2050 275 Aircraft Movement
1850
2050
2000 1978 1788 Rajbiraj
270
290 Airport
1800 1978
2000
1950 265
285
1750 1906
1950
1700 1906 1677 1876 280
260 Aircraft Movement
1900
1900 1876 275
1650 255
290
1850
1850 270
Jhomsom Airport
1600 1788 Jhomsom
285
250 Airport
1800
1800
1550
265
280
260 2018 2019
1750
1750
1500
1700 Aircraft 2017
Movement 2018
1677 275
255 Aircraft Movement
1700 2015 2016 1677 2019 Aircraft Movement
1650 270
250
1650
1600 265
4500
2018 2019
4154
4500 4154
1600
1550
4000 Passenger Movement 3574 260
4000 Aircraft Movement
3574
1500 255
1550
3500 3222 3222 37464
3500 3222 3222
40000 2015 2016 2017 2018 2019 250 2804
1500
3000
35000
34913
2804
31834
33210
3000
2018 Passanger Movement 2019
2500
2500 2015 2016 2017 2018
30998 2019
30000
2000 Passenger Movement 12000
2000 Passanger
Aircraft Movement
Movement

25000 1500
12000
1500
40000 37464 11500
1000
20000
35000
34913 Passenger
31834
Movement
33210
1000
11500
500
500 30998 11000
15000 37464
40000 0
30000 0
11000 Passanger2017
Movement 2018
10000 34913
2015 2016 2017 2018 2019 10500
2015 2016 2019
25000
35000 33210
31834 30998
12000
10500
5000
20000
300000 Passenger Movement 10000
11500
10000 Passenger Movement
15000
2015 2016 2017 2018 2019 60000 55651
25000
60000
10000
55651 9500
9500
11000
50000 46401
20000
50000
5000 46401 9000
10500
9000 41634
0
Cargo Movement (In Kgs)
39715 41634
40000 35766
39715
2018
2018
2019
2019
15000
40000 35766 10000 Passanger Movement
90000 84571
2015 2016 2017 2018 2019
30000
30000
10000
80000 74772 Passanger Movement
9500
70000 65493 20000
20000
5000
60000 Cargo Movement
54816(In Kgs) 51952 9000 Cargo Movement
10000
50000
10000 84571
900000
2835.5 2018
Cargo Movement 2019
40000
80000 0 2015 74772 28350 Passanger Movement
2016 2017 2018 2019 2835.5
30000
70000 65493 2834.5 2015 2016 2017 2018 2019
2015 2016 2017 2018 2019
20000
60000 54816 51952 2834
2835
10000 2833.5
50000 2834.5 Cargo Movement
Cargo Movement (In Kgs)
400000 Cargo
CargoMovement
Movement(In
(InKgs)
Kgs) 2833
2834
30000 2015 2016 2017 2018 2019 2835.5
2832.5
14000
14000 84571
90000 2833.5
2832
2835
20000 11557
80000
12000
10000 74772
11557 12000
2833
2831.5
2834.5
700000 9579
65493 2831
2832.5
2834
10000 9579
10000 2830.5
2015 2016 2017
54816 2018 2019 2833.5
2832
60000 51952 8000 2018 2019 7198
8000 7198 2833
2831.5 6663
50000 6663 Cargo Movement
2832.5
40000
6000 5057
2831
6000 5057
2832
30000 2830.5
4000
4000 2831.5
2018 2019
20000 2831
2000
2000
10000 2830.5 Cargo Movement
2018 2019
0 0 0
2015 2016 2017 2018 2019
2015
2015 2016
2016 2017
2017 2018
2018 2019
2019 Cargo Movement

CAAN Report 2019-20 73


Chaurjahari Airport
RAMECHHAP CHAURJAHARI
Ramechhap Airport
Chaurjahari Airport
Ramechhap Airport Aircraft Movement Aircraft Movement
8000 140
7000 Aircraft Movement
120 Aircraft Movement
6000
8000
5000 140
7000 100
4000
6000 120
Ramechhap
3000
5000 Airport 80
2000 100
4000 60
1000
3000
0
Aircraft Movement 80
40
2000
8000 2018 2019
60
1000
7000 20
Aircraft Movement
60000 40
2018 2019 0
5000 2018 2019
20
4000 Aircraft Movement
Aircraft Movement
3000 Passanger Movement 0
2018 2019
2000
40000 Aircraft Movement
1000
35000
0
30000 Passanger Movement Passanger Movement
2018 2019
25000 1200
40000
Aircraft Movement
20000
35000 1000
Passanger Movement
15000
30000 1200
10000
25000 800
5000 1000
20000
0
15000 2018 Passanger Movement 2019
600
800
10000
40000 Passanger Movement 400
5000
35000 600
300000 200
25000 2018 Cargo movement 2019 400

1400000 0
20000 Passanger Movement
200 2018 2019
1200000
15000
Passanger Movement
10000
1000000 0
5000
800000
Cargo movement 2018 2019

1400000
0
600000 Passanger Movement
2018 2019
1200000
400000
1000000
200000 Passanger Movement

8000000
2018 2019
600000 Cargo movement
Cargo movement
400000
1400000
200000
1200000
10000000
2018 2019
800000
Cargo movement
600000
400000
200000
0
2018 2019

Cargo movement

74 CAAN Report 2019-20


Lamidanda Airport
LAMIDANDA SANFEBAGAR
Sanfebagar Airport

Aircraft Movement
Aircraft Movement 70
Lamidanda
60 Airport 63
60
50
Sanfebagar
50 Airport
40
Aircraft Movement
40
60 34 Aircraft Movement
30
30
70
50 63
20 60
20
40
10 50
10
30
400
0 34
2018 2019 2018 2019
20
30
Aircraft Movement Aircraft Movement
10 20

0 10 Passanger Movement
2018 2019
1400
Passanger Movement
Aircraft Movement
0 1296
2018 2019
3 1200
Aircraft Movement

2.5 1000

Passanger Movement 800 Passanger Movement


2
3 1400 1296
600
1.5 431
1200
2.5
400
1 1000
2 200
0.5 800
1.5 0
600 2018 2019
0
431
1 2018 2019 Passanger Movement
400
Passanger Movement
0.5 200

0 0
2018 2019 2018 2019

Passanger Movement Passanger Movement

CAAN Report 2019-20 75


FLIGHT MOVEMENT DATA 2020 (Till September)

S.N Airports A/C In A/C Out Total Pax In Pax Out Total Cargo In Cargo Out Total
1 Bajura 304 304 608 2388 2985 5340 201414 16579 217993
2 Bharatpur 776 776 1552 22689 22465 45154 26321 9129 35450
3 Bhojpur 64 64 128 745 696 1441 10 168 178
4 Chandragadi 625 624 1249 62013 35826 97839 24279.42 31555 55834.42
5 Chaurjahari 15 15 30 103 102 205 0 0 0
6 Dang 106 106 212 1045 1090 2135 0 0 0
7 Dhangadi 854 851 1705 48218 46249 94467 48130.32 29333.49 77463.81
8 Dolpa 310 310 620 2196 3067 4263 167486 33655 201141
9 Janakpur 474 475 949 28895 27411 56306 24156 6496 30652
10 Jomsom 154 154 308 1864 1585 3449 289 217 506
11 Jumla 288 288 576 2428 2193 4621 49784 138082 187866
12 Lamidanda 10 10 20 42 53 95 0 0 0
13 Phaplu 763 762 1525 2405 4198 6573 110774 386730 497504
14 Rajbiraj 63 63 126 4286 3002 7288 909.9 378.7 1288.6
15 Ramechhap 316 316 632 0 65 63 0 410176 410176
16 Rara 401 401 802 3641 3638 7279 32787 61948 94735
17 Rumjatar 21 21 42 121 135 256 0 0 0
18 Salle 33 33 66 354 344 698 0 0 0
19 Sanfebagar 20 20 40 172 209 381 0 0 0
20 Simara 611 611 1222 10185 16413 26598 11871.67 3268.5 15140.17
21 Simikot 2731 2731 5462 5638 3715 9353 3299908 293839 3593747
22 Surkhet 1858 1861 3719 4679 4539 9218 142657 1862456 2005113
23 Lukla 1927 1927 3854 7435 8236 15671 1014689 13682 1028371
24 Tumlingtar 199 198 397 3461 3258 6719 3756.72 2326.78 6083.5
25 Taplejung 70 68 138 405 426 831 0 30 30
26 Thamkharka 87 87 174 1196 1019 2215 2050 4071 6121
27 Khanidanda 2 2 4 19 5 24 0 0 0
                     
S.N. Hub Airports A/C In A/C Out Total Pax In Pax Out Total Cargo In Cargo Out Total
1 Pokhara 3931 3935 7866 79926 79881 159807 28604 30295 30295
2 Biratnagar 1439 1438 2877 83664 78405 162069 85512.44 180054.08 265566.52
3 Nepalgunj 2992 3010 6002 58971 60805 119776 206626 1719023 1925649
4 Gautambuddha 985 985 1970 49147 46813 95960 49520.69 13250.42 62771.11
                     
S.N. TIA A/C In A/C Out Total Pax In Pax Out Total Cargo In Cargo Out Total
1 International 4062 4072 8134 439312 487896 927208 2050796 3786355 5837151
2 Domestic 11469 11475 22944 392228 394812 787040 158929 643299 802228

76 CAAN Report 2019-20

You might also like