F G H I J K L M

8400 8400 8400 8400 8400 8400 8400


EARTH ELECTRODE
CONNECTED IN RING
BY 25mm x 3 mm COPPER TAPE DROP TO
TO ACHIEVE R<10ohm LOWER ROOF

SH-701
BD BD BD BD
BD

DN
BD BD BD BD DN DN
BD
BD DN BM BD BD BM
DN BD

BM
DNBD

DN
BD BD BD BDBM
BD BD BD BD BD BD

DN
DN BM BD
BM

BD BD BD BD
BD BD BD
GUARD HOUSE
M-01-GH AC BD

DN
BD BD BD
BD BD BD BD
BD 25mm x 3 mm
ALUMINIUM TAPE
CONDUCTOR DROP TO
LOWER ROOF
1

M&E
M&E SHAFT SHAFT
M&E SHAFT TOILET M&E M&E
M&E SHAFT M&E PANTRY M&E M&E
SHAFT M-01-T4 MV SHAFT M-01-08d AC SHAFT SHAFT SHAFT
OFFICE OFFICE
STAIRCASE 4
MEETING ROOM M-01-07 AC M-01-08c AC
M-01-SC4 MV

2
M&E TOILET
M-01-04 AC OFFICE
M-01-05 AC
M&E CONFIDENTIAL
M-01-T3 MV SHAFT
STORE CORRIDOR
M-01-03 AC OFFICE M-01-C2 AC
M-01-06 AC Serial No : ____________________________
CORRIDOR
OFFICE Reproduction of this drawing without the written
M-01-08 AC
CORRIDOR M-01-C2 permission of the issuing authority is strictly prohibited
M-01-C1 AC LOADING/UNLOADING
M-01-09 AC

OFFICE TOILET
M-01-02-T2 MV OFFICE STORE
M-01-02b AC M-R1
M-01-01a AC M-01-08b 24HR
M-01-R1 M-R9
CL1 CL2
OFFICE M-01-R9
M-01-02 AC M-R2 M-R10
M-01-R2 M-01-R10
TOILET
CORRIDOR M&E M-R20
M-01-01-T1 MV
M-01-08a 24HR M-01-R20
M-01-C1 MV STAIRCASE 1
OFFICE M-R11
M-01-SC1 P
M-01-02a AC M-R3 M-01-R11 SMOKE STOP LOBBY
UP PL1 PL2 M-01-LB3 MV M-R21
3 M&E
M-01-ME1
M-01-R3

PL3 M&E
M-01-R21

M&E SHAFT
M-R8 M-R12
SHAFT M-R4
M-01-R8 M-01-R12
M&E M-01-R4
M&E
M-01-ME2 MV
M-R7 SHAFT
FIRE FIGHTING LOBBY LIFT LOBBY
M-01-R7 M-R5
M-01-LB1 MV M-01-LB1a AC
M-01-R5
M&E
SECURITY SCREENING
SHAFT
M-01-C1 AC
M-R6
M-01-R6
PL6 M&E
FL1 PL5 SHAFT
PL4

M&E
M-01-ME7 24HR

4
STAIRCASE 3
M-01-SC3 P REV DECRIPTION DATE

Client:

8400 8400 8400 8400 8400 8400 8400


MHA

M&E Engineer:
CPG CONSULTANTS PTE LTD
5 Mechanical & Electrical Engineering Division
1 Gateway Drive, #22-01
Westgate Tower
CPG Singapore 608531
CONSULTANTS
Tel: 6357 4090 Fax: 6357 4668

Senior Vice
Soh Meng Tiong SIGNED
President

Qualified Person Ng Kim Leong SIGNED

Project Lead Terence Ang / Ivy Lee SIGNED

Job Title:
CONSTRUCTION OF A PROPOSED
DEVELOPMENT AT NEIL ROAD, SINGAPORE

Drawing Title:
BD
ELECTRICAL SERVICES
BLOCK M
EXTERNAL LINKWAY PLAN- LIGHTNING
BD
PROTECTION SYSTEM (PART 2 OF 2)
Drawn by Adeline
Scale 1 : 150 A1 Date May-18
CAD Ref. P5887\ J:\TD_2\ELECT\LTA\P5887-E_M-LTA_-_R15_T.rvt

Drawing No.: Rev.


P305887-E_M_3006-LTA

© 2018, CPG Consultants Pte Ltd reserves all rights to these drawings,
designs and/or any other data contained herein. No part of the said
drawings, designs and / or other data may be reproduced, modified,
transmitted or used in any form or by any means for any purpose without
the prior written consent of CPG Consultants Pte Ltd other than the sole
purpose for which such drawings, designs and / or other data are provided to
licensed users on such terms as CPG Consultants Pte Ltd may prescribe.

You might also like