ACKNOWLEDGEMENT

Every project big or small is successful largely due to the effort of a number of wonderful people who
have always given their valuable advice or lent a helping hand.

I, Riddhi Pirogiwal, the student at J.D. Birla Institute extremely grateful to "Aarteg" for the confidence
bestowed in me. At this juncture I feel deeply honored in expressing my sincere thanks to our Head of
Company Mr. Sunil Kumar Tainwala for making the resources available at right time and providing
valuable insights leading to the successful completion of my project. Would also like to thank our
placement officer “Priya Dwivedi” for such a great opportunity.

I take this opportunity to express my profound gratitude and deep regards to my guide Ms. Sheel Bhatia
for her exemplary guidance, monitoring and constant encouragement throughout the internship. The
blessing, help and guidance given by her time to time shall carry me a long way in the journey of life on
which I am about to embark. Interestingly, I got to experience both on-site and off-site working at the
office.

I am obliged to staff members of Aarteg for the valuable information provided by them in their
respective fields. I am grateful for their cooperation during the period of my internship.

Lastly, I thank almighty, my parents, brother, and friends for their constant encouragement during the
period of my internship.
DAY 01
Date- 01/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Studied the previous site drawings to understand the format and their design style, also did a few
rectifications on their on-going site drawings.

DAY 02
Date- 02/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Prepared Bill of Quantities (Boq) for the order of accessories required in an on-going site and working
drawing of the same site.

DAY 03
Date- 03/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of the toilets of a 4BHK layout given, raw elevations & studied previous site drawings.
DAY 04
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of a room & puja room of a 4BHK layout given, raw elevations & studied previous site
drawings.

DAY 05
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of wardrobe with inner details of a 4BHK layout given, & studied inner wardrobe detailing of
previous site drawings.
DAY 06
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of the toilets of a 4BHK layout given, raw elevations & studied previous site drawings.

DAY 08
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Site Visit and rectifications of size changes of the panels on their on-going site drawings

DAY 7
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Site Visit and rectifications of size changes of the panels on their on-going site drawings
DAY 09
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of a toilet of a 4BHK layout given, designed elevations & rectifications on their on-going site
drawings with the changes on the furniture layout. Elevations of one of the toilets with hexagonal tiles,
created various options which were further sent to the client for their opinion.

DAY 10
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Site Visit to the residential space located in Lower Rowdon Street, Ekam & Elevations of a toilet of a
4BHK layout given, designed elevations. Observed the wooden detailing & the process of installation,
DAY 11
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of a toilet of a 4BHK layout given, designed elevations & rectifications on their on-going site
drawings.

DAY 12
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of a room & puja room of a 4BHK layout given, designed elevations. Studied previous site
drawings to understand the electrical layout.

DAY 13
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of a toilet of a 4BHK layout given, designed elevations as per the client requirements.
DAY 14
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Fans & Rugs placement in the on-going site residential layout to be installed. Studied previous site
drawings to understand the electrical layout.

DAY 15
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Fans & Rugs placement in the on-going site residential layout to be installed. Electrical layout of the
4BHK, begun with the individual rooms.

DAY 16
Date- 04/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Site Visit to the residential space located in Short Street, The Bansal House & Elevations of a toilet of a
4BHK layout given, designed elevations. Studied previous site drawings to understand the false ceiling
layout.
DAY 17
Date- 19/11/22
Time- 9:30 AM to 2:00 PM
Nature of work done-
Studied previous site drawings to understand the false ceiling layout & AC layout.

DAY 18
Date-21/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Designing of the false ceiling of the 4BHK layout which I have been working on & also inner wardrobe
details as per the client requirements.
DAY 19
Date-22/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Site Visit to the residential space located in Acharya Jagadish Chandra Bose Rd, The Reserve.
Rectifications on their on-going site drawings & working on the false ceiling of the 4BHK residential
space. Residential space is a two-floor residential space, wooden statement element in the staircase
with detailed designing after which it was executed.

DAY 20
Date-23/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Site Visit to the residential space located in Acharya Jagadish Chandra Bose Rd, The Reserve.
Rectifications on their on-going site drawings & working on the false ceiling of the 4BHK residential
space.
DAY 21
Date-24/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Wardrobe inner details, elevations of the 4BHK layout given as per discussed with the client.
Rectifications done on the previous drawings done.

DAY 22
Date-25/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of a room of a 4BHK layout given, designed elevations with detailing. Studied previous site
drawings to understand the electrical layout. Rectifications done on the previous drawings done.

DAY 23
Date-26/11/22
Time- 9:30 AM to 2:00 PM
Nature of work done-
Elevations of a room of a 4BHK layout given, designed elevations with detailing.
DAY 24
Date-28/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Rectifications done on the previous drawings done. Basic elevations of the leftover areas of the 4BHK
layout.

DAY 25
Date-29/11/22
Time- 9:30 AM to 2:00 PM
Nature of work done-
Elevations of a room of a 4BHK layout given, designed elevations with detailing.

DAY 26
Date-30/11/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Rectifications done on the previous drawings done. Basic elevations of the leftover areas of the 4BHK
layout.

DAY 27
Date-01/12/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Rectifications done on the previous drawings done. Elevations of a room of a 4BHK layout given,
designed elevations with detailing.
DAY 28
Date-02/12/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Electrical drawing of the bedrooms as per their format & designing of the other areas like living area.

DAY 29
Date-03/12/22
Time- 9:30 AM to 2:00 PM
Nature of work done-
Wardrobe inner detailing of the 4BHK layout, which have been working on.

DAY 30
Date-05/12/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Site Visit to a residential site located on Loudon Street, Hazelton. Rectifications done on the previous
drawings done & false ceiling elevations of the 4BHK layout.

DAY 31
Date-06/12/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Elevations of a room of a 4BHK layout given, designed elevations with detailing.

DAY 32
Date-07/12/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Electrical layout of the 4BHK layout given, rectifications done on the previous drawings done &
wardrobe inner details of the same.
DAY 33
Date-08/12/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Electrical layout of the 4BHK layout given, rectifications done on the previous drawings done & toilet
elevations of another residential site.

DAY 34
Date-09/12/22
Time- 9:30 AM to 5:00 PM
Nature of work done-
Electrical layout of the 4BHK layout given, designed elevations with detailing.

DAY 35
Date-10/12/22
Time- 9:30 AM to 2:00 PM
Nature of work done-
Site Visit to a residential space located in Short Street, The Bansal House. Observed the amount of
wooden detailing they incorporate, marble placements, also got a chance to observe how sir,
accessorizes his projects with various interior accessories.