Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Annex 1

Application No.

Application for Net Accounting Scheme of an On-Grid Small-Scale Solar Photovoltaic


Renewable Energy Facility (Scheme 02)

For installed capacities up to the Contract Demand of the existing installation.

1. Project Type: Solar Photovoltaic

2. Information about the Applicant:

Electricity Consumer’s Account No.

Name

NIC number

Address as specified in the Account No.

Contract Demand of the Installation: single/three phase, ______ Ampere

Bank Account No ______________________________ Branch ____________________________

Note: The small-scale renewable energy facility shall be located at the premise served by the electricity
account stated above.

Telephone numbers: Email. _____________

3. Facility Information – Please fill-in the information requested under the project type(s) selected in
item 1 above

4. Certification

 I attach the receipt number …………………..dated ……………… For the payments of Rs


……………………. As the review fee for this application, charged by CEB.
 I certify that Net Accounting Facility is required at the same premise where electricity account
is already provided, and that the renewable energy resource is within the property served by
the existing electricity supply.
 I have read the Agreement and the Interconnection Standards applicable for Net Accounting
Facility. I agree to install all the required equipment and to provide information whenever
requested by CEB and the Sri Lanka Sustainable Energy Authority.

Name of person signing this application _______________________________


(Should be the registered consumer)

Signature __________________________________ Date: ______________


DD-MM-YYYY

1
5. Additional Information/Requirements

Installer Details

Installer
Address

Contact Person
Fixed
Telephones
Mobile
Fax
Email

6. Information to be submitted with the application

1. Final Copy of the Circuit Diagram (proposed)


2. Compliance Certificate obtained from accredited agency, type test certificates, manuals,
operation instructions, layout diagram including all devises and their respective settings, and
any other relevant documents.
3. Schedule of protective devises and protection setting.

7. Installers Declaration

All the installed equipments were purchased from Original Supplier or Yes / No
authorized dealer
The Installation is fully complies with the CEB Standards Yes / No
The Protection Setting are protected from unauthorized alteration and Yes / No
temper proof
Operation manuals, safety guides and the relevant documentation were Yes / No
submitted and clearly explained to the end user
Additional Comments (Continue in separate sheet if necessary)

Name of the installer Authorized seal and Signature Date

You might also like